Entry  Wednesday, September 21, 2011, 13:23, John Wong, Empty, 38634-10, LP-SIS, Done, Sintering TaC coating on target oven for UCx#3  archiver_TGHT0-580A.JPG
Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta heatshields including the back block. 
Target is in the chamber and currently being pumped down.
Entry  Tuesday, September 13, 2011, 16:53, John Wong, SiC, 38295-9, HP-FEBIAD, Done, Ready  9x
Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat shields. 
Loaded with 555 SiC discs (total mass 64.24g)
Entry  Monday, September 12, 2011, 13:08, John Wong, Empty, Target Boat, , Done, Sintering TaC coating on End Caps striptool.JPG
Monday, September 12, 2011, 13:07
Target boat is loaded with coated TaC end caps for sintering.  Target boat is wrapped with 3 Ta-heat shields. 
Max TGHT = 580A
Entry  Friday, September 09, 2011, 10:05, John Wong, Empty, , HP-FEBIAD, Done, Sintering TaC coating striptool.JPG
Friday, September 09, 2011, 10:05
Target oven coated with TaC, and wrapped with 3-Ta heat shields.  Chamber is currently being pumped down. 
TGHT @ 140A, IG 9.2 e-6 Torr, BP 20mT. 
Entry  Wednesday, September 07, 2011, 15:40, Anders Mjos, Empty, , , Maintenance, Re-sealing of Glove Box 
2011-09-01:

    Glove box was leaking (air/argon) between base and box. Light was shining through.
    Removed old neoprene seal at base.

   Resealed glove box between base and box with DAP Butylflex. No light shining through after repair.
    Replaced rubber disks at 4 feed-throughs.
Entry  Wednesday, September 07, 2011, 13:41, John Wong, TaC, 38634-6, LP-SIS, Done, TaC#1: Sintering and Organics burn-off  TaC#1.jpgendcaps_after_sintering.pngTaC_aftersintering.jpg
Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125
Entry  Wednesday, September 07, 2011, 13:33, John Wong, Empty, , , Maintenance, Changed Evaporator#1 Backing Pump oil  
Wednesday, September 07, 2011, 11:18:  
IEVAP:CG2 @ 52mT before oil change. 
Edi D.V changed the oil for the backing pump.  WP#2011-09-07-2. CG2 currently @ 21mT.
Entry  Monday, August 29, 2011, 11:21, John Wong, Empty, 38634-6, LP-SIS, Done, Sintering TaC coating oven for TaC#1 TaC_target_oven.JPG
 Monday, August 29, 2011, 13:16: Target oven was coated with TaC and let dry over night.  The target oven is in the evaporator and currently
being pumped down.  
Monday, August 29, 2011, 15:12: Currently vac @ 8.41e-6 torr. 
    Reply  Tuesday, September 06, 2011, 17:05, John Wong, Empty, 38634-6, LP-SIS, Done, Sintering TaC coating oven for TaC#1 striptool.JPG


    
        
            John Wong wrote:
        
        
            
             Monday, August 29, 2011, 13:16: Target oven was coated with TaC and let dry over night.  The target oven
Entry  Tuesday, August 30, 2011, 09:31, Anders Mjos, Empty, Target Boat, LP-SIS, Done, Sintering of End Caps 
Tuesday, August 30, 2011, 09:29: Target Boat wrapped with 3 Ta heat shields. 6 D-End Caps and 6 End Caps coated with TaC. Pumping down - vac at 3.6e-5
torr.
Tuesday, August 30, 2011, 10:35: Stepped heater up to 100 A. Vacuum tripped heater. Stepped back up to 80 A then 70 A. Vac at 4.5e-5 torr.
    Reply  Tuesday, August 30, 2011, 16:30, John Wong, Empty, Target Boat, LP-SIS, Done, Sintering of End Caps 


    
        
            Anders Mjos wrote:
        
        
            
            Tuesday, August 30, 2011, 09:29: Target Boat wrapped with 3 Ta heat shields. 6 D-End Caps and 6 End
Entry  Thursday, August 04, 2011, 17:46, John Wong, UC2, 38634-8, LP-SIS, Problems resolved, Repacking UCx in new target oven 200A.jpgreconditioning.jpg
Thursday, August 04, 2011, 17:44:  All the UCx material from target oven  38634-3 was recovered and repacked in this new oven.  Total mass
recovered = 45.911g and packed in 10.7cm length.  Target is currently being pumped down. 
Thursday, August 04, 2011, 20:23:  Current vac 5.6e-6 Torr.  Stepping up TGHT to 104A, vac increasing slowly.  Being auto heating
Entry  Wednesday, August 03, 2011, 17:16, John Wong, Empty, 38634-8, LP-SIS, Done, Sintering TaC coating  striptool.JPG
Wednesday, August 03, 2011, 20:27 :  Target was wrapped with 3 new Ta-heat shields and 2 around the back block.  The tar from the previous
UCx conditioning remained in the chamber was removed and cleaned.  Chamber is currently being pumped down, vac currently @ 8.3 e-6 Torr. 
Wednesday, August 03, 2011, 21:01:  Begin to step up TGHT, currently vac @ 7.5e-6 Torr.
Entry  Wednesday, July 27, 2011, 13:02, John Wong, UC2, 38634-3, LP-SIS, Problems, UCx#2 conditioning  striptool_july31.pngTarget_with_3_heat_shields.jpgstriptool_july31_600A.jpgUCx#2-conditioning.jpg
Wednesday, July 27, 2011, 12:58: 
Target length = 11.2cm
Total UC2/C foils = 245 discs
Entry  Monday, July 18, 2011, 15:55, John Wong, Empty, 38634-3, LP-SIS, Done, Sintering TaC coating for UCx#2 striptool.jpg
 Monday, July 18, 2011, 15:53:  Target oven was coated with TaC and let dry over the weekend.  The target is now installed in the evaporator
and currently being pumped down.  No Ta-heat shields are required for LP target ovens. 
Wednesday, July 20, 2011, 11:42:  Evaporator had to be vented to remove the target because Ta-heat shields were actually required for UCx
Entry  Thursday, June 30, 2011, 12:42, John Wong, UO2/C, UCx-heatboat#1, LP-SIS, Done, Batch#2: UO2/C for carbonization startup_vac.jpgstartup_current.jpgparameter.jpgUCx_2011_b_3days.pnggrab.S13888.png
Before began the carbonization process, two cameras were setup in the
hotlab for monitoring the evaporator and the power supply.  On duty ISAC Ops also helps to monitor on a regular basis and to grab the striptools +
cameras (twice/shift) and put this information in the ISAC Logbook with subject header:  "UCx_2011_B 'date time'", for easy search.  
Entry  Wednesday, May 25, 2011, 14:42, John Wong, UO2/C, UCx-heatboat#1, LP-SIS, Done, Batch#1: UO2/C mixing & carbonization Screen_shot_2011-05-26_at_3.14.00_PM.pngauto_ramping.pngUCx_2011_A_carbonization.pngEvaporator_Ar_flow.pngUC2.png
Before began the carbonization process, two cameras were setup in the hotlab for monitoring the evaporator and the power supply.  On duty ISAC Ops
also helps to monitor on a regular basis and to grab the striptools + cameras (twice/shift) and put this information in the ISAC Logbook with subject header:
 "UCx_2011_A 'date time'", for easy search.  
Entry  Wednesday, May 18, 2011, 13:13, John Wong, SiC, 38295-8, HP-FEBIAD, Problems, Organics burnoff & Sintering  6x
Wed May 18 13:12:24 2011:  Target is wrapped with 3 Ta-heat shields and is installed in the evaporator which is being pumped down.
Wed May 18 23:11:42 2011:  TGHT was raised to 40A and held for about 6 hours; Vac gradually came down to 2.1e-6 Torr.  TGHT increased
to 90A and pressure is going up, currently vac @ 2.9 e-5 Torr.  Auto heating will begin soon at 0.5A/min --> 820A.  
Entry  Tuesday, May 17, 2011, 16:43, John Wong, , , , Maintenance, Evaporator Ion gauge replaced  
The evaporator ion gauge filament burnt out on May 11, 2011.  A target was in the evaporator at that time and was about to being the sintering process. 
The gauge had two filaments, so vacuum group helped to switch to the second filament.  The evaporator was vented on May 17, 2011, and a new ion gauge
with two filaments was installed.  The gauge was tested and it's working fine. 
Entry  Wednesday, May 11, 2011, 16:23, John Wong, SiC, 38481-8, HP-FEBIAD, Problems, Organics burnoff & Sintering  9x
Wed May 11 16:20:21 2011:  The HP-FEBIAD (w.o#38481-8) was filled with SiC (8.5mm, 555 discs).  The target is wrapped with 3 Ta-heat shields
and is in the evaporator, which is being pumped down. 
Thu May 12 10:52:48 2011:  The evaporator ion gauge, IEVAPIG1 filament burnt out.  The gauge comes in two filaments, so it is now running
Entry  Tuesday, May 10, 2011, 14:58, John Wong, Empty, 38817-2, HP-SIS, Done, Diffusion bonding of Ta Fins for HP-SIS (w.o#38817-2)  starting_process.jpgoverall_process.gif
Tue May 10 14:56:05 2011:  Target is wrapped with 3 heat-shields.  The evaporator is pumping down, vac @ 4.72e-6 Torr.  TGHT was raised
to 60A/0.239V.  Auto heating will being now; THGT will be ramped up to 820A @ 2A/min. (See Attachment#1: Staring_process)
Wed May 11 10:16:03 2011: Auto cooling was started by ISAC Ops' help.  TGHT has ramped down to zero.  The p/s will be turned off and
Entry  Monday, May 09, 2011, 16:10, John Wong, Empty, 38817-1, HP-SIS, Done, Diffusion bonding of Ta Fins TGHT_ramping_up.gifoverall_process.jpg
Mon May  9 16:09:35 2011:  Target is wrapped with 3 Ta heatshields and the evaporator is begin pumped down.
Mon May  9 17:59:57 2011:  Vac is @ 1.33e-5 Torr.  TGHT was stepped up to 60A before starting the auto heating process (See Attachment#1:
TGHT_ramping_up).   Note: Although the vacuum is at low e-5 torr, this should be fine to start the TGHT because it takes a while to heat up