Friday, August 03, 2018, 17:49, John Wong, UC2, , LP-SIS, In progress, Conditioning UCx#24
|
Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs, total packing length of 7.1cm.
Container was previously coated/sintered with TaC (see elog #415) in Evap#2 with TGHT set to 450A/7.5V and TBHT 230A/4.2
Vacuum initial setting:
Good Vac = 5.0 e-5 Torr, Bad vac = 8.0 e-5 Torr.
pressure level will be monitored accordingly...
Auto-ramping setting
TGHT: 60 wait time, 0.2A/min, final 450A
TGHT: 60 wait time, 0.2A/min, final 230A.
Chamber is currently being pumped down.Good
Monday, August 06, 2018, 00:04
Pressure at 3.6e-6 Torr.
Initiate autoramping.
Friday, August 10, 2018, 11:02
TGHT/TBHT have been at 450A(4.5V)/230A(2.9) for over 15 hours.
Pressure is stabilized at 5.2e-6 Torr.
Initiated auto-cooling at 2A/min for TGHT and 1A/min for TBHT.
|
Friday, August 17, 2018, 11:23, Marla Cervantes, UC2, NA, , Done, UCx 1-step casting -Oxidation test
|
Friday, August 17, 2018, 11:17
Four discs of UCx produced with the 1-step casting method were placed in a glass jar.
The mass of the discs was 0.400 g.
The glass jar with the discs were placed in the heating chamber of the IEVAP.
Currently IEVAP is pumping down until vacuum is in the order of ~10^-6 Torr.
Friday, August 17, 2018, 16:28
Final vacuum: 9.5x10^-6 Torr
IEVAP's heating chamber will be vented with air and the materials will be taken out.
Friday, August 17, 2018, 17:27
Material was transferred to the glove box
|
Tuesday, September 04, 2018, 10:18, Marla Cervantes, UC2, 41369-2, , In progress, UCx Fully loaded graphite insert thermal test - FL#1.2
|
Monday, September 03, 2018, 10:17
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
Weight of graphite tube + UCx discs = 27.118 g
Currently pumping down in evap1.
Tuesday, September 04, 2018, 10:17
IGP1 = 4.02e-6 Torr
Tapped up TBHT and TGHT manually to 100 A @1 A/s with pauses of 20 s.
Wait for 40 min to pressure to stabilize.
Max pressure 1.38e-4 Torr.
Final pressure 5.93e-5 Torr.
Tuesday, September 04, 2018, 11:46
Good vacuum 5e-1 Torr
Bad vacuum 8e-1 Torr
Initiating auto ramp for TGHT @ 10 A/min to a max setpoint of 520 A
Initiating auto ramp for TBHT @ 5 A/min to a max setpoint of 245 A
Tuesday, September 04, 2018, 12:54
After achieving 520 A with auto ramp, manually tapped to 599 A.
Manually tapped back to 550 A.
|
Friday, September 21, 2018, 10:22, Anders Mjos, UC2, 41369-2, , Done, UCx Fully loaded graphite insert thermal test - FL#1.2
|
Marla Cervantes wrote: |
Monday, September 03, 2018, 10:17
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
Weight of graphite tube + UCx discs = 27.118 g
Currently pumping down in evap1.
Tuesday, September 04, 2018, 10:17
IGP1 = 4.02e-6 Torr
Tapped up TBHT and TGHT manually to 100 A @1 A/s with pauses of 20 s.
Wait for 40 min to pressure to stabilize.
Max pressure 1.38e-4 Torr.
Final pressure 5.93e-5 Torr.
Tuesday, September 04, 2018, 11:46
Good vacuum 5e-1 Torr
Bad vacuum 8e-1 Torr
Initiating auto ramp for TGHT @ 10 A/min to a max setpoint of 520 A
Initiating auto ramp for TBHT @ 5 A/min to a max setpoint of 245 A
Tuesday, September 04, 2018, 12:54
After achieving 520 A with auto ramp, manually tapped to 599 A.
Manually tapped back to 550 A.
|
Friday, September 21, 2018, 10:21
Ramping down heaters at 2 A/min and 1 A/min for TGHT and TBHT. |
Saturday, September 29, 2018, 20:53, John Wong, UC2, 41369-2, , Done, UCx Fully loaded graphite insert thermal test - FL#1.2
|
Marla Cervantes wrote: |
Monday, September 03, 2018, 10:17
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
Weight of graphite tube + UCx discs = 27.118 g
Currently pumping down in evap1.
Tuesday, September 04, 2018, 10:17
IGP1 = 4.02e-6 Torr
Tapped up TBHT and TGHT manually to 100 A @1 A/s with pauses of 20 s.
Wait for 40 min to pressure to stabilize.
Max pressure 1.38e-4 Torr.
Final pressure 5.93e-5 Torr.
Tuesday, September 04, 2018, 11:46
Good vacuum 5e-1 Torr
Bad vacuum 8e-1 Torr
Initiating auto ramp for TGHT @ 10 A/min to a max setpoint of 520 A
Initiating auto ramp for TBHT @ 5 A/min to a max setpoint of 245 A
Tuesday, September 04, 2018, 12:54
After achieving 520 A with auto ramp, manually tapped to 599 A.
Manually tapped back to 550 A.
|
Saturday, September 29, 2018, 20:52
Target is taken out from the chamber and transferred to the Ar glove box.
|
Thursday, October 11, 2018, 18:13, John Wong, UC2, , LP-SIS, In progress, Conditioning UCx#25 
|
Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs, total packing length of 8.0 cm.
Container was previously coated/sintered with TaC (see elog #417) in Evap#2 with TGHT set to 400A and TBHT 230A, but there was a problem with the readback. Will ramp up TGHT to 400A to see if the carbonization is complete; if not, additional 50A on TGHT can be applied.
One end-cap is inserted on the right, wrt to the ionizer, and left end is open.
Vacuum initial setting:
Good Vac = 5.0 e-5 Torr, Bad vac = 8.0 e-5 Torr.
pressure level will be monitored accordingly...
Auto-ramping setting
TGHT: 60 wait time, 0.2A/min, final 400A (or addtional of 50 A if required as mentioned above)
TGHT: 60 wait time, 0.2A/min, final 230A.
Chamber is currently being pumped down.
Friday, October 12, 2018, 15:35
Chamber has pumped down to 1.8e-6 Torr.
Stepping up TGHT and TBHT to 40A.
Friday, October 12, 2018, 17:07
TGHT/TBTH was held at 40A reaching max pressure of 1.7e-5 before slowly coming down.
Initiated autoramping.
Thursday, October 18, 2018, 11:10
TGHT reached to 400A/3.98V, pressure is coming down from the upper limit at around 320A which indicated the carbonization is approaching to completion (see attachment#1). However, two more out-gassing steps are typically observed as TGHT reached around 450 A (see previous UCx conditioning process). Currently the pressure is at 1.04 e-5 torr.
Auto-ramping TGHT to 450A at 1A/min, continue to observe the vacuum...
Thursday, October 18, 2018, 12:57
TGHT reached to 450A/4.6V. Pressure is coming down from 1.6 e-5 Torr. (see attachment#2). Will remain at this heating current until pressure reached to mid 10-6 torr.
|
Tuesday, October 23, 2018, 10:24, Marla Cervantes, UC2, , LP-SIS, Problems, Conditioning UCx#25
|
John Wong wrote: |
Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs, total packing length of 8.0 cm.
Container was previously coated/sintered with TaC (see elog #417) in Evap#2 with TGHT set to 400A and TBHT 230A, but there was a problem with the readback. Will ramp up TGHT to 400A to see if the carbonization is complete; if not, additional 50A on TGHT can be applied.
One end-cap is inserted on the right, wrt to the ionizer, and left end is open.
Vacuum initial setting:
Good Vac = 5.0 e-5 Torr, Bad vac = 8.0 e-5 Torr.
pressure level will be monitored accordingly...
Auto-ramping setting
TGHT: 60 wait time, 0.2A/min, final 400A (or addtional of 50 A if required as mentioned above)
TGHT: 60 wait time, 0.2A/min, final 230A.
Chamber is currently being pumped down.
Friday, October 12, 2018, 15:35
Chamber has pumped down to 1.8e-6 Torr.
Stepping up TGHT and TBHT to 40A.
Friday, October 12, 2018, 17:07
TGHT/TBTH was held at 40A reaching max pressure of 1.7e-5 before slowly coming down.
Initiated autoramping.
Thursday, October 18, 2018, 11:10
TGHT reached to 400A/3.98V, pressure is coming down from the upper limit at around 320A which indicated the carbonization is approaching to completion (see attachment#1). However, two more out-gassing steps are typically observed as TGHT reached around 450 A (see previous UCx conditioning process). Currently the pressure is at 1.04 e-5 torr.
Auto-ramping TGHT to 450A at 1A/min, continue to observe the vacuum...
Thursday, October 18, 2018, 12:57
TGHT reached to 450A/4.6V. Pressure is coming down from 1.6 e-5 Torr. (see attachment#2). Will remain at this heating current until pressure reached to mid 10-6 torr.
|
Friday, October 19, 2018, 10:00
TRIUMF had a total power outage, the TBHT and TGHT current had been ramped down already.
|
Tuesday, October 23, 2018, 10:49, Marla Cervantes, UC2, , LP-SIS, Problems resolved, Conditioning UCx#25
|
Marla Cervantes wrote: |
John Wong wrote: |
Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs, total packing length of 8.0 cm.
Container was previously coated/sintered with TaC (see elog #417) in Evap#2 with TGHT set to 400A and TBHT 230A, but there was a problem with the readback. Will ramp up TGHT to 400A to see if the carbonization is complete; if not, additional 50A on TGHT can be applied.
One end-cap is inserted on the right, wrt to the ionizer, and left end is open.
Vacuum initial setting:
Good Vac = 5.0 e-5 Torr, Bad vac = 8.0 e-5 Torr.
pressure level will be monitored accordingly...
Auto-ramping setting
TGHT: 60 wait time, 0.2A/min, final 400A (or addtional of 50 A if required as mentioned above)
TGHT: 60 wait time, 0.2A/min, final 230A.
Chamber is currently being pumped down.
Friday, October 12, 2018, 15:35
Chamber has pumped down to 1.8e-6 Torr.
Stepping up TGHT and TBHT to 40A.
Friday, October 12, 2018, 17:07
TGHT/TBTH was held at 40A reaching max pressure of 1.7e-5 before slowly coming down.
Initiated autoramping.
Thursday, October 18, 2018, 11:10
TGHT reached to 400A/3.98V, pressure is coming down from the upper limit at around 320A which indicated the carbonization is approaching to completion (see attachment#1). However, two more out-gassing steps are typically observed as TGHT reached around 450 A (see previous UCx conditioning process). Currently the pressure is at 1.04 e-5 torr.
Auto-ramping TGHT to 450A at 1A/min, continue to observe the vacuum...
Thursday, October 18, 2018, 12:57
TGHT reached to 450A/4.6V. Pressure is coming down from 1.6 e-5 Torr. (see attachment#2). Will remain at this heating current until pressure reached to mid 10-6 torr.
|
Friday, October 19, 2018, 10:00
TRIUMF had a total power outage, the TBHT and TGHT current had been ramped down already.
|
Sunday, October 21, 2018, 1:00 pm
the pumps went out, and the communication with the IEVAP was recovered on Sunday, the vacuum was 160 mTorr,
the pumps were turned on again.
|
Tuesday, October 23, 2018, 10:55, Marla Cervantes, UC2, , LP-SIS, Done, Conditioning UCx#25  
|
Marla Cervantes wrote: |
Marla Cervantes wrote: |
John Wong wrote: |
Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs, total packing length of 8.0 cm.
Container was previously coated/sintered with TaC (see elog #417) in Evap#2 with TGHT set to 400A and TBHT 230A, but there was a problem with the readback. Will ramp up TGHT to 400A to see if the carbonization is complete; if not, additional 50A on TGHT can be applied.
One end-cap is inserted on the right, wrt to the ionizer, and left end is open.
Vacuum initial setting:
Good Vac = 5.0 e-5 Torr, Bad vac = 8.0 e-5 Torr.
pressure level will be monitored accordingly...
Auto-ramping setting
TGHT: 60 wait time, 0.2A/min, final 400A (or addtional of 50 A if required as mentioned above)
TGHT: 60 wait time, 0.2A/min, final 230A.
Chamber is currently being pumped down.
Friday, October 12, 2018, 15:35
Chamber has pumped down to 1.8e-6 Torr.
Stepping up TGHT and TBHT to 40A.
Friday, October 12, 2018, 17:07
TGHT/TBTH was held at 40A reaching max pressure of 1.7e-5 before slowly coming down.
Initiated autoramping.
Thursday, October 18, 2018, 11:10
TGHT reached to 400A/3.98V, pressure is coming down from the upper limit at around 320A which indicated the carbonization is approaching to completion (see attachment#1). However, two more out-gassing steps are typically observed as TGHT reached around 450 A (see previous UCx conditioning process). Currently the pressure is at 1.04 e-5 torr.
Auto-ramping TGHT to 450A at 1A/min, continue to observe the vacuum...
Thursday, October 18, 2018, 12:57
TGHT reached to 450A/4.6V. Pressure is coming down from 1.6 e-5 Torr. (see attachment#2). Will remain at this heating current until pressure reached to mid 10-6 torr.
|
Friday, October 19, 2018, 10:00
TRIUMF had a total power outage, the TBHT and TGHT current had been ramped down already.
|
Sunday, October 21, 2018, 1:00 pm
the pumps went out, and the communication with the IEVAP was recovered on Sunday, the vacuum was 160 mTorr,
the pumps were turned on again.
|
Monday, October 22, 2018, 9:00
The target was transferred to the Ar glove box.
Tuesday, October 23, 2018, 10:19
Target was inspected:
- Discs were in place
- Orange coating formed on the open end of target container
Spring was removed, two graphite discs were introduced, end cap was placed. |
Tuesday, October 30, 2018, 10:17, Marla Cervantes, UC2, 43044-7 , LP-SIS, In progress, UCx Fully loaded graphite insert thermal test - FL#1
|
Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered (e-log 420 Evaporator_2)
The container was loaded with a graphite insert loaded with UCx
Graphite insert + UCx mass = 26.927 g
A current of 440 A TGHT and 230 A TBHT will be inputed to the contianer
IGP1 = 8.72e-7 Torr
The current was tapped manually to 440 A TGHT and 230 A TBHT (see fig. Heatinf test)
Maximum pressure during heating = 1.7e-3 Torr.
Target will stay at maximum current for 1 week.
|
Wednesday, October 31, 2018, 10:30, Marla Cervantes, UC2, 43044-7 , LP-SIS, Problems, UCx Fully loaded graphite insert thermal test - FL#1 
|
Marla Cervantes wrote: |
Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered (e-log 420 Evaporator_2)
The container was loaded with a graphite insert loaded with UCx
Graphite insert + UCx mass = 26.927 g
A current of 440 A TGHT and 230 A TBHT will be inputed to the contianer
IGP1 = 8.72e-7 Torr
The current was tapped manually to 440 A TGHT and 230 A TBHT (see fig. Heating test)
Maximum pressure during heating = 1.7e-3 Torr.
Target will stay at maximum current for 1 week.
|
Wednesday, October 31, 2018, 10:09
The current tripped off, around 5:00 am, the pressure was below 1e-5 Torr (see fig. current-trip_off).
On a previous test, we measured the maximum temperature of the power supply = 33.3 C (e-log 227).
Power supply overheating doesn't seem to be the problem.
EPICS windows are half withe and not answering correctly.
Also, TBHT says that IGP1 < 500 mTorr, and its interlock needs reset (see figure EPICS). |
Wednesday, October 31, 2018, 15:23, Marla Cervantes, UC2, 43044-7 , LP-SIS, Done, UCx Fully loaded graphite insert thermal test - FL#1
|
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered (e-log 420 Evaporator_2)
The container was loaded with a graphite insert loaded with UCx
Graphite insert + UCx mass = 26.927 g
A current of 440 A TGHT and 230 A TBHT will be inputed to the contianer
IGP1 = 8.72e-7 Torr
The current was tapped manually to 440 A TGHT and 230 A TBHT (see fig. Heating test)
Maximum pressure during heating = 1.7e-3 Torr.
Target will stay at maximum current for 1 week.
|
Wednesday, October 31, 2018, 10:09
The current tripped off, around 5:00 am, the pressure was below 1e-5 Torr (see fig. current-trip_off).
On a previous test, we measured the maximum temperature of the power supply = 33.3 C (e-log 227).
Power supply overheating doesn't seem to be the problem.
EPICS windows are half withe and not answering correctly.
Also, TBHT says that IGP1 < 500 mTorr, and its interlock needs reset (see figure EPICS).
|
Wednesday, October 31, 2018, 15:20
The problem was reported to controls, it will be also reported to power supply group.
In the meantime, the target will be ramp-up again with the auto ramp at:
TGHT = 20 A/min to 440 A
TBHT = 10 A/min to 230 A
The pressure before heating is 4.07e-7 Torr
Wednesday, October 31, 2018, 19:24
The maximum pressure during heating was 6.57e-6 Torr.
Current pressure 3.00e-6Torr
Wednesday, November 07, 2018, 18:37
IGP1 = 9.7e-7 Torr
TGHT = -2 A/min to 0A
TBHT = -1 A/min to 0A
Thursday, November 08, 2018, 16:16
EVAP1 was vented with Ar, and target was transferred to glove box.
The mass of the loaded graphite insert changed to 26.854 g
That is a difference of 0.075 g
The tantalum container "cathode" crystalized (see fig)
The rest of the tantalum container did not change. |
Wednesday, September 18, 2019, 09:57, Marla Cervantes, UC2, 44062-4, LP-SIS, Done, UCx28 Conditioning #1
|
Wednesday, September 18, 2019, 07:48
A TaC coated target container was loaded with a graphite cartridge with UCx
The target container has 3 heat shields
IGP1 = 9.3e-6 Torr
Autoramp set up to:
TGHT= 0.2 A/min to 438 A (same current used to reach 1900C in evap2 when sintering TaC coating - elog-455 evap2)
TBHT= 0.1 A/min 230 A
The limits are:
Good vacuum 5e-5 Torr
Bad vacuum 8e-5 Torr
Wednesday, September 18, 2019, 09:55
The autoramp where changed to 1 A/min on both the TGHt and the TGHT.
Wednesday, September 18, 2019, 21:06
After 4 hours at TGHT = 4.15 V, 437.76 A and TBHT = 2.77 V, 228.31 A (and pressure of 1.07e-5 Torr)
The autoramp was set to TGHT = - 1 A/min and TBHT = -0.5 Torr
Tuesday, September 29, 2019, 14:05
The EVAP1 was vented with Ar and the target was removed,
The target was directly assembled after removing it from EVAP1
Finally, the assembly was transferred to the glove box |
Tuesday, September 24, 2019, 06:53, Marla Cervantes, UC2, 44062-4, LP-SIS, Done, UCx28 Conditioning #2
|
Tuesday, September 24, 2019, 06:52
The target UCx28 that was previously conditioned e-log 241, was set again in the EVAP1 for re-conditioning,
the reason was to get rid of all the material that could evaporate from the target and has the potential of clogging the ionizer.
The heating conditions are the same as the previous conditioning:
TGHT= 1 A/min to 438 A (same current used to reach 1900C in evap2 when sintering TaC coating - elog-455 evap2)
TBHT= 1 A/min 230 A
IGP1 = 2.91e-6 Torr
Wednesday, September 24, 2019, 18:30
IGP1 = 5.77e-6 Torr
The cooling conditions are the same as the previous conditioning:
TGHT= -1 A/min
TBHT= -0.5 A/min
Wednesday, September 25, 2019, 13:56
EVAP1 was vented with Ar,
The target container was removed to look at the Ta cap
The Ta cap was coated.
Wednesday, September 25, 2019, 13:58
A new Ta cap was set in the transfer tube hole and the target container was installed again. |
Wednesday, September 25, 2019, 14:00, Marla Cervantes, UC2, 44062-4, LP-SIS, Done, UCx28 Conditioning #3
|
Wednesday, September 25, 2019, 14:00
The target UCx28 that was previously conditioned , was set again in the EVAP1 for re-conditioning,
the reason was to get rid of all the material that could evaporate from the target and has the potential of clogging the ionizer.
EVAP1 currently pumping down.
Thursday, September 26, 2019, 07:09
The heating conditions are the same as the previous conditioning:
TGHT= 1 A/min to 438 A (same current used to reach 1900C in evap2 when sintering TaC coating - elog-455 evap2)
TBHT= 1 A/min 230 A
IGP1 = 1.51e-6 Torr
Friday, September 26, 2019, 12:56
The cooling conditions are the same as the previous conditioning:
TGHT= -1 A/min
TBHT= -0.5 A/min
Friday, September 27, 2019, 17:59
EVAP1 was vented with Ar, the target was removed from the heating chamber to exchange the Ta cap for a new one.
The old Ta cap was not fully coated and it presented a different coloration with respect to the 2 previous caps used for conditioning. |
Friday, September 27, 2019, 18:04, Marla Cervantes, UC2, 44062-4, LP-SIS, Done, UCx28 Conditioning #4
|
Friday, September 27, 2019, 18:03
The target UCx28 that was previously conditioned , was set again in the EVAP1 for re-conditioning,
the reason was to get rid of all the material that could evaporate from the target and has the potential of clogging the ionizer.
EVAP1 currently pumping down.
Saturday, September 28, 2019, 09:33
The heating conditions are the same as the previous conditioning:
TGHT= 1 A/min to 438 A (same current used to reach 1900C in evap2 when sintering TaC coating - elog-455 evap2)
TBHT= 1 A/min 230 A
IGP1 = 1.419e-6 Torr
The ramping started at 9:36 am on Septemper 28th
Sunday, September 29, 2019, 12:30
The cooling conditions are the same as the previous conditioning:
TGHT= -1 A/min
TBHT= -0.5 A/min
Monday, September 30, 2019, 11:40
After 23 hours being heated, the target was cooled down and EVAP1 was vented with Ar
The target was removed form EVAP1 and placed in the fumehood.
The tantalum cap used to collect the outgassed material from the target container was not fully coated.
The heat shields of the target container were removed and the target container was inspected,
the ends of the Ta container were crystallized, the area above the graphite cartridge does not have signs of crystallization. |
Wednesday, October 02, 2019, 11:07, Marla Cervantes, UC2, 44062-4, LP-SIS, Done, UCx28 Conditioning #5
|
Monday, September 30, 2019, 10:54
After being exposed to air for 1.5 hours,
the target UCx28 that was previously conditioned , was set again in the EVAP1 for re-conditioning.
The UCx28 was wrapped with 3 new Ta-heat shields and placed in the EVAP1,
EVAP1 is currently pumping down.
Tuesday, October 1, 2019, 08:33
The heating conditions are:
TGHT= 1 A/min to 430 A
TBHT= 1 A/min 230 A
Initial vacuum IGP1 = 1.22193-6 Torr
Since the ends of the target container are crystallized and the voltage is starting to vary, the target was heated only for 3 hours instead of 4.
The cooling conditions are the same as the previous conditioning:
TGHT= -1 A/min
TBHT= -0.5 A/min
Wednesday, October 02, 2019, 11:01
EVAP1 was vented with Ar and the target was removed form EVAP1 and assembled,
the assembly was placed in the glove box.
The tantalum cap used to collect the outgassed material from the target container was not fully coated. |
Tuesday, October 08, 2019, 09:53, Marla Cervantes, UC2, 44062-6, LP-SIS, Done, UCx29 Conditioning
|
Monday, October 07, 2019, 09:51
A TaC coated target container was loaded with a graphite cartridge with UCx
The target container has 3 heat shields
Tuesday, October 08, 2019, 09:51
IGP1 = 1.9596e-6 Torr
Autoramp set up to:
TGHT= 1 A/min to 425 A (same current used to reach 1900C in evap2 when sintering TaC coating - e-log 241 evap2)
TBHT= 1 A/min 230 A
The limits are:
Good vacuum 5e-5 Torr
Bad vacuum 8e-5 Torr
Wednesday, October 09, 2019, 13:58
After 4 hours at maximum current, the current was ramped down at 1 A/min for both.
Wednesday, October 09, 2019, 14:00
EVAP1 was vented with Ar, and the target oven was removed to access the Ta cap.
The Ta cap difference in mass was 0.002 g |
Wednesday, November 06, 2019, 11:48, Marla Cervantes, UC2, 44062-3 , LP-SIS, Done, UCx#30 Conditioning
|
Tuesday, November 05, 2019, 16:43
A TaC coated target container was loaded with a graphite cartridge with UCx
The target container has 3 heat shields
EVAP1 pumping down
Wednesday, November 06, 2019, 11:46
IGP1 = 2.09e-6 Torr
Good vacuum 5e-5 Torr
Bad vacuum 8e-5 Torr
Autoramp set up to:
TGHT= 1 A/min to 465 A (same current used to reach 1865 C in evap2 when sintering TaC coating - e-log 464 evap2)
TBHT= 1 A/min 230 A
Thursday, November 07, 2019, 10:15
After approximately 4 hours at maximum temperature the pressure was 5.85e-6 Torr and the autoramp was set to:
TGHT -1 A/min
TBHT -0.5 A/min
After 4 hours that the current stayed at 0 A, EVAP1 was vented with argon and the target was removed; before transferring the target to the preparatory glove box, the tantalum cap to collect deposits from the target was inspected, there was not deposits on it so it was determined that the conditioning was successful and the target was transferred to the preparatory glove box. |
Saturday, June 05, 2021, 09:14, Marla Cervantes, UC2, , TARGET BOAT, In progress, UCx#33 Conditioning
|
Saturday, June 05, 2021, 08:57
Target #33 was installed in the EVAP1 and pumped down yesterday (Friday 4).
Target #33 is going to be conditioned on a Ta boat wrapped with 3 Ta foils.
IGP1 = 3.85e-6 Torr
Good vacuum = 1e-1 Torr
Bad vacuum = 5e-1 Torr
Power desired 1.6kW. This is the first target conditioned this way,
Saturday, June 05, 2021, 09:13
Current ramp is 2A/30s to 400 A
Saturday, June 05, 2021, 10:59
TGHT = 3.5V, 399.7 A, 1.4 kW
IGP1 = 4.4e-5 Torr
Saturday, June 05, 2021, 11:00
Current ramp is 2A/30s to 450 A
Saturday, June 05, 2021, 11:14
TGHT = 4.06 V, 451.584 A, 1.4 kW
IGP1 = 4.86e-5 Torr
Saturday, June 05, 2021, 11:15
Current ramp is 2A/30s to 500 A
Saturday, June 05, 2021, 11:23
TGHT = 4.23 V, 467.2 A, 1.97 kW pressure was still increasing a little at 1.6kW
IGP1 = 4.86e-5 Torr
Saturday, June 05, 2021, 19:10
TGHT = 4.08 V, 459.52 A,
IGP1 = 6.4e-6 Torr
Initiate ramp down at 2 A/min to 0A |
|