Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 10 of 15  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  104   Monday, November 10, 2014, 13:50 Laura LambertUC240282-5LP-SISDoneConditioning UCx #11

    

       
            
  
  107   Monday, January 26, 2015, 11:28 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_05 Monday, January 26, 2015, 11:19
UO2/C green was prepared Jan 20,
2015. The slurry was cast on a piece of glass
 flk5.jpgstriptool.JPG 
  109   Friday, March 20, 2015, 15:21 Laura LambertUC241177-2LP-SISDoneConditioning UCx #12Friday, March 20, 2015, 15:17 
Target container was previously
  
  111   Monday, May 11, 2015, 11:49 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_06 Monday, May 11, 2015, 11:45
UO2/C green was prepared May
 IMG_20150508_143957199_HDR.jpgstriptool.JPGstriptool-zoom.JPG 
  115   Wednesday, July 08, 2015, 10:52 John WongUC240860-1LP-IG-LISDoneConditioning UCx #13

    

       
            
 Screen_Shot_2015-07-09_at_5.20.37_PM.pngpressure_current_plot.PNG 
  117   Tuesday, August 11, 2015, 10:23 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2_flk_07

    

       
            
  
  118   Wednesday, August 19, 2015, 11:44 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_08 Wednesday, August 19, 2015, 11:02
UO2/C green was prepared Aug
 8x 
  120   Monday, September 14, 2015, 15:31 John WongUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_09 Monday, September 14, 2015, 15:28
Green cast dried UO2/C + organic
 poor_backing_pump.PNGcurrent_pressure_plot.PNG 
  122   Monday, October 26, 2015, 16:20 Laura LambertUC241077-5LP-SISDoneConditioning UCx#14

    

       
            
  
  123   Friday, December 04, 2015, 15:06 Laura LambertUO2/C40282-1TARGET BOATDone1stepUCx project - round1 Wednesday, December 02, 2015, 14:08
UO2/C was cast onto a graphite sheet
in the fume hood and let dry.
  
  124   Thursday, December 10, 2015, 10:59 Laura LambertUO2/C40282-1TARGET BOATDone1stepUCx project - round2 Thursday, December 10, 2015, 08:54
Filled graphite tube with 34 UO2/C
discs cast onto graphite.
 image.jpeg 
  127   Monday, February 29, 2016, 16:16 Laura LambertUC241077-1LP-SISDoneConditioning UCx#15

    

       
            
 UCx_15.jpg 
  128   Tuesday, March 08, 2016, 11:19 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_10 Tuesday, March 08, 2016, 10:01
UO2/C green was prepared March
 UCxFlk_10.jpgUCxFlk_10(2).jpgUCxFlk_10(3).jpgUCxFlk_10-first_time_using_new_set_up.jpgUCxFlk_10_carbonization.jpg 
  129   Tuesday, April 05, 2016, 11:12 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_11Tuesday, April 05, 2016, 10:58
UO2/C green was prepared March
 UCxFlk_11.jpg 
  130   Tuesday, April 19, 2016, 10:48 Laura LambertUC2*** Done***ALL FUTURE UCx TARGETS*** Tuesday, April 19, 2016, 09:47
Temperature measurements have been
taken in evap2 on target containers. 
  
  132   Wednesday, May 18, 2016, 15:15 Laura LambertUC240860-2LP-IG-LISDoneConditioning UCx#16 Wednesday, May 18, 2016, 15:05
Target container was previously
  
  133   Monday, July 11, 2016, 16:00 Laura LambertUC241790-3LP-SISDoneConditioning UCx#17Monday, July 11, 2016, 15:54
Target container was previously
 trip-off.JPGsnapshot_of_striptool.JPG 
  136   Tuesday, September 20, 2016, 10:49 Laura Lambert  TARGET BOATDoneRUSH. Sintering end-caps

    

       
            
 Evernote_Camera_Roll_20160919_154129.jpgEvernote_Camera_Roll_20160919_154130.jpgEvernote_Camera_Roll_20160919_154131.jpgEvernote_Camera_Roll_20160919_154132.jpg 
  137   Friday, September 23, 2016, 16:09 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_12Friday, September 23, 2016, 16:01
*Note: materials were scaled back
small amount since only 48.5g of UO2 was
  
  138   Wednesday, October 19, 2016, 16:52 Laura LambertUC241790-6LP-SISDoneConditioning UCx#18 Wednesday, October 19, 2016, 16:47
Target container was previously
  
ELOG V2.9.2-2455