Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 8 of 15  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  155   Wednesday, July 12, 2017, 17:07 Laura LambertUC242218-15LP-SISIn progressConditioning UCx#21 Wednesday, July 12, 2017, 17:06
Target container was previously
  
  154   Monday, June 12, 2017, 15:07 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_17 Monday, June 12, 2017, 11:41
UO2/C green was prepared June
 UC2Flk_17_entire_carbonization_process_using_new_vacuum_limits.JPGUC2Flk_17_vac_vs._cur.JPGUC2Flk_17_vac_vs._volt.JPG 
  153   Wednesday, June 07, 2017, 12:48 Aaron Schmidt    Turbo pump cooling Wednesday, June 07, 2017, 10:00-12:00:
Cooling was split/routed from two bottom
lines with tees and run to the turbo pump.
  
  152   Tuesday, May 30, 2017, 07:43 Laura LambertUO2/C40282-1TARGET BOATDoneprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
  
  151   Monday, May 29, 2017, 08:54 Laura LambertUO2/C40282-1TARGET BOATProblemsprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
 evap1_tripped_off_roud2_UCxFlk_16.jpgevap1_tripped_off_roud2_UCxFlk_16(2).jpg 
  150   Friday, May 26, 2017, 16:09 Laura LambertUO2/C40282-1TARGET BOATIn progressprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
  
  149   Friday, May 26, 2017, 15:23 Laura LambertUO2/C40282-1TARGET BOATProblemsprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
 6x 
  148   Wednesday, May 24, 2017, 09:34 Laura Lambert   MaintenanceVACUUM TRIP OFF SETPOINT CHANGED Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point
was changed to 8e-4 Torr when previously
  
  147   Tuesday, May 23, 2017, 15:51 Laura LambertUO2/C40282-1TARGET BOATIn progressprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May
 UCxFlk_16_temp_readout.jpg 
  146   Thursday, April 20, 2017, 11:41 Laura LambertUC242218-1LP-IG-LISDoneConditioning UCx#20 Thursday, April 20, 2017, 11:31
Target container was previously
 6x 
  145   Friday, March 03, 2017, 15:51 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_15 Friday, March 03, 2017, 08:53
UO2/C green was prepared
 evap1_tripped_off_UCxFlk_15.jpg 
  144   Thursday, February 16, 2017, 15:09 Laura LambertUC242218-12LP-SISDoneConditioning UCx#19 Thursday, February 16, 2017, 15:04
Target container was previously
 IMG_1578.JPGIMG_1587.JPGIMG_1594.JPGIMG_1598.JPG 
  143   Tuesday, December 20, 2016, 15:03 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas break    
  142   Tuesday, November 29, 2016, 16:20 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_14 Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov
 UCxFlk_14[1].jpgUC2flk_14_carbonized_in_new_boat.jpg 
  141   Wednesday, November 16, 2016, 16:41 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_13

    

       
            
 UCxFlk_10_carbonization.jpgUCxFlk_13_not_done_carbonization_at_520A-see_vacuum.jpgUCxflk_13.xlsx 
  140   Tuesday, November 15, 2016, 10:02 John WongUO2/C40282-1TARGET BOATIn progressProcessing UC2Flk_13

    

       
            
  
  139   Monday, November 07, 2016, 13:34 Laura LambertUO2/C40282-1TARGET BOATIn progressProcessing UC2Flk_13 Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov
 UCxFlk_13[4].jpgUCxFlk_13[1].jpg 
  138   Wednesday, October 19, 2016, 16:52 Laura LambertUC241790-6LP-SISDoneConditioning UCx#18 Wednesday, October 19, 2016, 16:47
Target container was previously
  
  137   Friday, September 23, 2016, 16:09 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_12Friday, September 23, 2016, 16:01
*Note: materials were scaled back
small amount since only 48.5g of UO2 was
  
  136   Tuesday, September 20, 2016, 10:49 Laura Lambert  TARGET BOATDoneRUSH. Sintering end-caps

    

       
            
 Evernote_Camera_Roll_20160919_154129.jpgEvernote_Camera_Roll_20160919_154130.jpgEvernote_Camera_Roll_20160919_154131.jpgEvernote_Camera_Roll_20160919_154132.jpg 
ELOG V2.9.2-2455