  211   Mon Dec 14 10:01:52 2009 Damien Gallop  OLIS development for CUSP source continuedDevelopment over the weekend. Results to
come. Restart source now and let it warm
up. 4He2+ on FC6. Plasma at zero, to duplicate
  
  191   Mon Nov 23 10:32:34 2009 Damien Gallop  OLIS development for CUSP source - installation cont'd4He2+ "alpha" CUSP source under
vacuum: IOS:IG1=7.3e-7 Torr. Electrical installations
today.
  
  192   Tue Nov 24 13:55:55 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dKeerthi found and fixed a couple more vacuum
leaks last night. Present vacuum at IOS:IG1
= 4.4e-7 Torr. Electrical and water services
  
  195   Thu Nov 26 16:08:42 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dServices completed today. There are still
some teething pains, particularly the arc
p/s as noted earlier. But we did have some
 grab.I31500.png 
  196   Fri Nov 27 13:36:09 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dArc power supply replaced. Water leaks
down to one or two pinholes on source body;
manageable. Minor mechanical in progress.
  
  215   Mon Dec 21 10:22:33 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dKeerthi and Marco achieved visible 4He2+
through the RFQ on Friday (or so). Mass spec
attached. Development continues today.
 grab.I28800.pngPicture_8.png 
  190   Fri Nov 20 17:26:57 2009 Damien Gallop  OLIS development for CUSP source - installationToday we installed the CUSP "alpha"
source on the MWS port at OLIS. It is vacuum-tight.
Looking good. Also we installed remaining
  
  198   Mon Nov 30 15:41:00 2009 Damien Gallop  OLIS development for CUSP source - initial testsWe completed the services by end of last
week. Of course they could always be better,
but everything is fine for this iteration.
  
  197   Mon Nov 30 15:41:00 2009 Damien Gallop  OLIS development for CUSP source - initial testsWe completed the services by end of last
week. Of course they could always be better,
but everything is fine for this iteration.
 Picture_14.png 
  205   Fri Dec 4 18:15:19 2009 Damien Gallop  OLIS development for CUSP source - gas lines & waterWe received back the source this morning.
First order of business was to take some
EOB scans. See earlier entry. Then we shut
  
  200   Tue Dec 1 09:27:17 2009 Damien Gallop  OLIS development for CUSP source - first overnight runningThe CUSP source ran well overnight, notwithstanding
local control of source power supplies. Filament
supply had dropped to 115A this morning,
 Picture_16.pngPicture_15.png 
  189   Thu Nov 19 11:14:19 2009 Damien Gallop  OLIS development for CUSP sourcePumps were switched off last night. IOS
was vented to Ar and swiped clean this morning.
MCIS ready for disembarking from F-cage.
  
  219   Mon Jan 11 17:46:31 2010 Damien Gallop  OLIS development for 4He2+ beam loose endsOLIS was shut down over Christmas. We did
a "soft start" of the MWS last
Tuesday, after refurbishing and installation
 grab.r14041.pnggrab.Q14048.pnggrab.h14058.png 
  217   Thu Dec 24 10:13:00 2009 Damien Gallop  OLIS development 20Ne1+ from MWSThe MWS stayed up flawlessly overnight.
Beam grew from about 2µA to over 5µA
this morning. Was it the pre-conditioning
 Picture_5.png 
  216   Wed Dec 23 11:09:37 2009 Damien Gallop  OLIS developmentSo... lots has happened.
* Supernanogan *
Heater components installed in plasma
 7x 
  486   Tue Oct 21 07:14:26 2014 Brian MinatoOtherGeneralOLIS WorkMCIS-
the cart was moved into the HV cage. 
The facilities will be connected and an oven
  
  489   Fri Oct 24 10:50:20 2014 Brian MinatoOtherOtherOLIS UpdateThe nitrogen bottle needs to be replaced.
 
MCIS-
  
  492   Thu Oct 30 13:14:51 2014 Brian MinatoOtherOtherOLIS UpdateMCIS-
a new oven assembly was installed
on the MCIS yesterday.  The cart has
  
  497   Fri Oct 31 20:39:56 2014 Brian MinatoOtherOtherOLIS UpdateMCIS-
the MWS Bias and PE have been moved
on to the MCIS (the MCIS connections have
  
  499   Thu Nov 6 08:37:52 2014 Brian MinatoOtherOtherOLIS UpdateMCIS-
the source is off.  It is under
vacuum and in the HV cage.
  