OLIS Logbook General
  General, Page 26 of 26  Not logged in ELOG logo
Entry  Mon Dec 17 14:08:52 2012, Keerthi Jayamanna, , , IRIS beam delivary is completed 

IRIS beam delivery is completed with extra 3 days of beam providing to them.

18O2 and 40Ar+2 were delivered with few attenuators i place.

Entry  Mon Dec 17 14:10:22 2012, Keerthi Jayamanna, , , Gas flow controller fault 

Controls group may need some assistance from OLIS group in order to trouble shoot the problem.

Entry  Wed Jan 22 10:34:58 2014, Raymond Dubé, , , IN-line 100K for IOS:YCB1A removed 

Last January 17th 2014 we removed an in-line resistor (100K 10W) from IOS:YCB1A because we do not think that it is needed.

 

Entry  Thu Jan 23 12:56:14 2014, Raymond Dubé, , , New & updated drawings for S.S. ISK4478D-rev5.pdfISK4585D-rev2.pdfISK4583D-rev5.pdf

I updated an old drawing ISK4478D (MS & MCIS Optics) and created 2 new ones: ISK4583D (Electrical Diagram for SS & MS) and ISK4585D (SS & MS Optics)

If you see any errors please let me know.

Entry  Fri Jan 24 09:15:10 2014, Raymond Dubé, , , New ISK4586D for OLIS with 3 Ion Source ISK4586D-rev1.pdf

I created a new drawing: ISK4586D that shows the Optics for OLIS with 3 Ion Source.

Entry  Wed Jan 29 12:27:57 2014, Raymond Dubé, , , OLIS Skimmers BOP & Labels isk4363d-rev4.pdfisk4365d-rev2.pdf

I updated 2 drawings that show the OLIS skimmers.

A.  ISK4363D for the OLIS Skimmers BOP connections, we have 7 skimmers cables (6 wires per cable) going in and 16 skimmers channel going out to Controls.

B.  ISK4365D that shows the skimmers cables location along the OLIS beamline.

Entry  Wed Aug 13 15:04:05 2014, Raymond Dubé, , , OLIS Bender Magnet PS (0-500 amps) 

Arthur and Derek had a look at the OLIS Bender Magnet P/S and found a problem with the Polarity Switch, it was set up upside down, they fixed that.

Note: We do not need a Polarity Switch for OLIS may be we should remove or bypass it, at the moment when the PS goes OFF we need to use the reverse Polarity to Bend the Beam the right way.

Entry  Mon Oct 27 15:13:18 2014, Brian Minato, , ,  

MCIS-

cleaning out source to remove potassium and calcium.

Areas cleaned with scotch-brite and then wiped with methanol:  plasma chamber, tuning chamber (ports opened for access), TP3 tube.  The inside of the ground electrode tip has been removed and sand blasted clean.  The inside of the ground electrode has been wiped as much as possible (very limited access).

 The ALGA amplifier has been unplugged and moved.

Entry  Thu Oct 30 22:09:02 2014, Keerthi Jayamanna, , , Suoernanogan steering 

IOS mass scan does not work.

A/Q            FC6                X          Y          CCB1

1                2.07e-7        167      97       500

2                2.18e-7         308     247

2.14          1e-11             388     277 

2.246       2.07e-8         358     227

2.30          2e-9             378      227 

2.366       1.28e-8         388     277

2.392        2.1e-11        388     277

2.4641      1.98e-11     388     277

2.5345      6.49e-11     398     277

2.5614     1.81e-10      398    227

2.6263     2.95e-7         398   227

2.7522     2.07e-8         398   227

2.7896     2.06e-10       398   227

2.8652     3.22e-11       398   227

2.9515     8.52e-8         398   237

 

 

 

 

 

 

 

 

 

 

 

Entry  Sat Nov 1 13:31:17 2014, Keerthi Jayamanna, , , MCIS readyness for 76Se 

Supernanogan is running with oven no heat, without 76selenium. MCIS:IG1=3e-7Torr.

Tune saved as 141101_1318_76Se+11tune.snap

MCIS steering  X=330, Y=226, CCB1=500, MCISEL=4171/5157, PE=11.5/23, FC6=76nA(16O+7)

Entry  Thu May 21 09:15:48 2015, Brian Minato, , ,  

Service of MCIS.  Plasma chamber cleaned.  Repaired shorted, Right steering plate.  Added shields to help prevent coating of wires.  Beam is off centre on first collimator of steering assembly.

Moved Ground electrode away from PE approximately 0.10".

  Note:  the plasma chamber and ground electrode tip are clean.

2015-05-19  Repaired shorted MWS PE.  Internal short was found.  The source chamber was vented and cleaned.  The beaker was replaced with a new one (it was coated with carbon).  WPI2015-05-19-2

Investigate Shorted MWS PE and MCIS shorted steering plate WOI2015-05-19-1

Entry  Wed Feb 22 21:46:27 2017, Keerthi Jayamanna, , , Elog is working now 

Elog is now functioning. We can start entering notes

Entry  Wed Feb 22 21:51:40 2017, Keerthi Jayamanna, , , SIS first beam is N1+1 

Chris confirmed the first SIS beam would be Na+1. Next Rb+1 and then Li+1

ELOG V2.9.2-2455