Mon Dec 17 14:08:52 2012, Keerthi Jayamanna, , , IRIS beam delivary is completed
|
IRIS beam delivery is completed with extra 3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with few attenuators i place. |
Mon Dec 17 14:10:22 2012, Keerthi Jayamanna, , , Gas flow controller fault
|
Controls group may need some assistance from OLIS group in order to trouble shoot the problem. |
Wed Jan 22 10:34:58 2014, Raymond Dubé, , , IN-line 100K for IOS:YCB1A removed
|
Last January 17th 2014 we removed an in-line resistor (100K 10W) from IOS:YCB1A because we do not think that it is needed.
|
Thu Jan 23 12:56:14 2014, Raymond Dubé, , , New & updated drawings for S.S.  
|
I updated an old drawing ISK4478D (MS & MCIS Optics) and created 2 new ones: ISK4583D (Electrical Diagram for SS
& MS) and ISK4585D (SS & MS Optics)
If you see any errors please let me know. |
Fri Jan 24 09:15:10 2014, Raymond Dubé, , , New ISK4586D for OLIS with 3 Ion Source
|
I created a new drawing: ISK4586D that shows the Optics for OLIS with 3 Ion Source. |
Wed Jan 29 12:27:57 2014, Raymond Dubé, , , OLIS Skimmers BOP & Labels 
|
I updated 2 drawings that show the OLIS skimmers.
A. ISK4363D for the OLIS Skimmers BOP connections, we have 7 skimmers cables (6 wires per cable) going in
and 16 skimmers channel going out to Controls. |
Wed Aug 13 15:04:05 2014, Raymond Dubé, , , OLIS Bender Magnet PS (0-500 amps)
|
Arthur and Derek had a look at the OLIS Bender Magnet P/S and found a problem with the Polarity Switch, it was set up
upside down, they fixed that.
Note: We do not need a Polarity Switch for OLIS may be we should remove or bypass it, at the moment when the PS |
Mon Oct 27 15:13:18 2014, Brian Minato, , ,
|
MCIS-
cleaning out source to remove potassium and calcium.
Areas cleaned with scotch-brite and then wiped with methanol: plasma chamber, tuning chamber (ports opened for access), TP3 tube. The |
Thu Oct 30 22:09:02 2014, Keerthi Jayamanna, , , Suoernanogan steering
|
IOS mass scan does not work.
A/Q FC6 X
Y CCB1 |
Sat Nov 1 13:31:17 2014, Keerthi Jayamanna, , , MCIS readyness for 76Se
|
Supernanogan is running with oven no heat, without 76selenium. MCIS:IG1=3e-7Torr.
Tune saved as 141101_1318_76Se+11tune.snap
MCIS steering X=330, Y=226, CCB1=500, MCISEL=4171/5157, PE=11.5/23, FC6=76nA(16O+7) |
Thu May 21 09:15:48 2015, Brian Minato, , ,
|
Service of MCIS. Plasma chamber cleaned. Repaired shorted, Right steering plate. Added shields to help prevent coating of wires.
Beam is off centre on first collimator of steering assembly.
Moved Ground electrode away from PE approximately 0.10". |
Wed Feb 22 21:46:27 2017, Keerthi Jayamanna, , , Elog is working now
|
Elog is now functioning. We can start entering notes |
Wed Feb 22 21:51:40 2017, Keerthi Jayamanna, , , SIS first beam is N1+1
|
Chris confirmed the first SIS beam would be Na+1. Next Rb+1 and then Li+1 |