OLIS Logbook General
  General, Page 20 of 26  Not logged in ELOG logo
ID Date Authordown Type Category Subject Text Attachments
  341   Mon Oct 4 09:40:30 2010 Damien Gallop  OLIS Maintenance and Development completedThe September Mini-Shutdown is now a memory.
The few days available to OLIS were used
for MCIS Development on 197Au. Productive.
  
  342   Mon Oct 4 09:46:12 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESS setupA 20Ne1+ beam from the MWS was established
on Friday. Line tuning began Friday evening.
A tune to the front of the SC LINAC was in
  
  343   Fri Oct 8 09:35:03 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESSBeam from MWS quietly sitting on FC6 awaiting
tune checks to TIGRESS. Next experiments
up are 26Alg5+ to TUDA and 24Na5+ to TIGRESS.
 Picture_1.png 
  344   Tue Oct 12 13:25:21 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beamsSource switchover in progress on WP#2010-10-12-1.
Magnesium material installed into MWS. Pumpdown
 grab.J26422.pnggrab.J27689.png 
  345   Wed Oct 13 16:15:03 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beamsSource conditioning most of today, to 59kV.
Striptool attached. Reset to 26Mg tune at
~16:00.
 Picture_1.png 
  346   Fri Oct 15 09:23:03 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beamsSource is running nicely. Hand-off
to ICR occurred ~Wednesday night. Setup done
overnight.
 Picture_2.png 
  347   Mon Oct 18 09:22:35 2010 Damien Gallop  26Mg6+ for TUDA-IIMWS is producing 26Mg, presently parked.
It was used over the weekend
for TUDA tuning.
 Picture_5.png 
  348   Tue Oct 19 09:20:40 2010 Damien Gallop  26Mg6+ for TUDA-IIMWS operating nicely.  Picture_1.png 
  349   Wed Oct 20 11:30:32 2010 Damien Gallop  26Mg6+ for TUDA-IIMWS ran fine overnight. It was shut off
this morning to investigate bias sparking
issue, noted on FR#4894. The two MCIS turbopump
 Picture_6.pngPicture_7.pngPicture_9.png 
  350   Thu Oct 21 11:46:14 2010 Damien Gallop  26Mg6+ for TIGRESSThe MWS was restarted yesterday, and a
26Mg beam re-established. ICR set up into
ISAC-II overnight, and tuning to TIGRESS
 Picture_14.png 
  351   Fri Oct 22 09:35:24 2010 Damien Gallop  26Mg6+ for TIGRESSA 26Mg beam was handed over to TIGRESS
last evening. It is 26Mg6+ through ISAC-I
and further stripped to 26Mg10+ by the time
  
  352   Mon Oct 25 09:05:15 2010 Damien Gallop  26Mg6+ for TIGRESSSmooth delivery (from OLIS point-of-view)
to TIGRESS over the weekend. An SCB RF amplifier
failed yesterday and was replaced. Tuning
 Picture_3.png 
  353   Tue Oct 26 09:19:39 2010 Damien Gallop  26Mg6+ for TIGRESSThe TIGRESS run was scheduled to end at
08:30, but has been extended for 24h. The
ICR reports that they are getting "good
 Picture_1.png 
  354   Wed Oct 27 09:21:59 2010 Damien Gallop  26Mg6+ for TIGRESS EOBThe experiment ran overnight, smoothly,
by the looks of it. Beam is on FC6 now, so
they're likely done. EOB studies on Mg beam
 16x 
  356   Thu Oct 28 17:51:49 2010 Damien Gallop  MWS switchover for scheduled 85/87Rb beamsA controls issue with IOS:BIAS was found
yesterday. Controls people resolved it today.
MWS source was switched over and prepared
 grab.N32655.png 
  355   Thu Oct 28 17:51:49 2010 Damien Gallop  MWS switchover for scheduled 85/87Rb beamsA controls issue with IOS:BIAS was found
yesterday. Controls people resolved it today.
MWS source was switched over and prepared
 Picture_1.png 
  357   Fri Oct 29 09:41:20 2010 Damien Gallop  MWS DevelopmentMWS source switchover yesterday was successful.
Leakchecking went well. A small leak on the
intermediate section sealed with a snug on
 6x 
  358   Mon Nov 1 09:30:15 2010 Damien Gallop  MWS DevelopmentThe source stayed up steadily over the
weekend, with 85Rb on FC6. Not a lot of current,
but pretty good for a first pass. More development
 Picture_45.pngPicture_1.pngPicture_2.pngPicture_3.png 
  359   Tue Nov 2 09:25:30 2010 Damien Gallop  MWS Development85Rb on FC6 overnight. After restarting
the source yesterday following development,
the beam intensity came back, but it's slightly
 Picture_1.pngPicture_1.png 
  360   Wed Nov 3 09:22:38 2010 Damien Gallop  85Rb for PolarizerYesterday we handed over a 85Rb beam to
ICR. It will be used for a LEBT run using
the Polarizer line. Beam stayed on FC6 overnight.
 Picture_2.pngPicture_1.png 
ELOG V2.9.2-2455