  505   Tue Nov 25 07:49:50 2014 Brian MinatoOtherGeneralMCIS and SIS UpdateMCIS-
the Se was loaded into the oven last
friday (21st).  During the weekend the
  
  487   Wed Oct 22 07:58:32 2014 Brian MinatoOtherGeneralMCIS WorkThe remaining connections were done on
the MCIS. 
A piece of 1/8" teflon was installed
  
  491   Tue Oct 28 13:30:47 2014 Brian MinatoOtherOtherMCIS UpdateMCIS-
the cleaning has been completed. 
The oven assembly is removed and the gate
  
  502   Thu Nov 13 16:34:29 2014 Brian MinatoOtherOtherMCIS UpdateThe ethernet cable from the CPI TWT amplifier
has been temporarily moved to the Alga 50W
amplifier.  The Alga had been experiencing
  
  507   Wed Dec 17 13:17:13 2014 Brian MinatoOtherOtherMCIS UpdateThe MCIS was vented with nitrogen yesterday. 
The Se oven was drawn back into the tuner. 
It was removed with the tuner and blanked.
  
  32   Tue Jun 23 18:04:30 2009 Damien GallopRoutineGeneralMCIS HV conditioning to 20KVSupernanogan bias for this run is 16.32KV.
After we were finished with source tuning,
etc., we conditioned up to 20KV. Then beam
 grab.Vd9281.png 
  136   Tue Sep 15 16:09:31 2009 Damien Gallop  MCIS Development 17O emittance scansWe noticed a double peak effect in the
16O3+ scan. I will set up the line for 17O3+
and see.
 13x 
  380   Mon Dec 20 09:50:07 2010 Damien Gallop  MCIS Development & EOBDevelopment and the quest for gold continue.
Later... Mass scans in region of
197Au33 A/q=5.97, with graph of all theoretically
 Picture_5.pngAu_Scan.pngAu_Scan_Zoom.pngAoverQ.png 
  135   Tue Sep 15 10:32:39 2009 Damien Gallop  MCIS DevelopmentSo. We are preparing for a few days of
Supernanogan development. The present run
plan is to obtain good emittance scans for
 7x 
  335   Tue Sep 14 09:18:28 2010 Damien Gallop  MCIS DevelopmentThe 16O3+ DRAGON run just finished. MCIS
Development begins this morning for a few
days. The goal is to install and characterize
 8x 
  336   Thu Sep 16 17:06:22 2010 Damien Gallop  MCIS DevelopmentA new sputter source was installed onto
the Supernanogan. A wire of Au is installed
in the source. Mass scans this morning with
 grab.yx5537.pngmcis2010sep16Au.png 
  337   Fri Sep 17 14:02:29 2010 Damien Gallop  MCIS DevelopmentToday's agenda: RF frequency scans and
generally getting a feel for the new sputter
source.
 Picture_3.pngPicture_5.pngPicture_2.pngAu25beam.pngAubeamNoSputter.png 
  377   Tue Dec 14 09:15:58 2010 Damien Gallop  MCIS DevelopmentBeam development started yesterday. Looks
like the HERACLES run, which started Thursday,
ended yesterday morning.
  
  378   Wed Dec 15 09:18:41 2010 Damien Gallop  MCIS DevelopmentSource development in preparation for Au
beam in progress.
  
  379   Fri Dec 17 09:18:57 2010 Damien Gallop  MCIS DevelopmentDevelopment continues in the search for
gold. A=197 Present A/q=5.94, which suggests
197Au+33. It could also be a tail of 12C+2.
 Picture_1.png 
  146   Mon Sep 28 14:16:47 2009 Damien Gallop  MCIS Cart down for TP1 ReplacementWe are taking the opportunity to replace
TP1 today. Edi Dalla Valle is on it. Also,
Diagnostics has a WP in the queue for looking
  
  131   Tue Aug 18 11:16:16 2009 Damien Gallop  MCIS "PV" PLC trip overnightAnother in the on-going saga of MCIS:PV1
trips occurred again this morning. The operators
recovered most of the vacuum devices except
 grab.SXu928.pnggrab.eG1166.pnggrab.di1170.png 
  15   Wed Jun 10 18:48:53 2009 Damien GallopRoutineGeneralKrypton source gas fittedKrypton source gas teed directly into ion
source. A Nupro valve and tee also added
for 17O line. At present, the 17O gas bottle
  
  470   Sun Dec 2 22:34:09 2012 Keerthi Jayamanna  Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam    
  36   Tue Jun 30 10:30:17 2009 Damien GallopRoutineGeneralInitial development setupSetup teething pains... The Start button
on the emittance panel worked this time.
But ICR called, requesting a few minutes
  