M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 12 of 15  ELOG logo
ID Date Author Operational Mode Subjectdown Text Attachments
  26   Wed May 5 23:57:38 2004 Willy AnderssonQuench RecoveryPowerleads warming up again.Got a page from Don Flemming at about 18:50
wondering why the power
lead temperatures were rising. See attachment
 may5_04_1800.BMP 
  86   Sun Nov 28 10:15:18 2004 Willy AnderssonQuench RecoveryPowerlead quench ?Got page very early this morning. Couldn't
come in til 08:30. System was 
in idle running mode and someone had reset
  
  171   Thu Oct 26 04:27:31 2006 Willy AnderssonQuench RecoveryPowerlead overtemp02:30 this morning got page from operations.
Looked at system online, appears that there
was a powerlead overtemp
  
  77   Thu Nov 4 13:33:49 2004 Doug PreddyNormal RunningPower supply problemsLast night the power supply was ramping up
at a very slow rate. This 
morning it was energized,but with no current
  
  16   Mon Apr 26 08:12:30 2004 Doug PreddyQuench RecoveryPower leads flowThrottled back the LHe in until the power
leads started to warm. My goal is 
to flow "warm" gas (hopefully 80K) through
  
  17   Tue Apr 27 09:03:18 2004 Doug PreddyNormal RunningPower leadsPower leads are being monitored with the strip
tool graphs. I saw the temps 
go from having a ripple to almost no ripple,
  
  73   Mon Oct 25 15:44:15 2004 Doug PreddyNormal RunningPower lead temps starting to ripplePower lead temps starting to ripple at a 1.5min
period. PL flows are 
both>250 mm.
  
  46   Sun Aug 29 14:39:19 2004 Doug PreddyNormal RunningPower lead rippleThe LHe in and PL-neg temps have been building
up a ripple over the last 
few days. Curtis cycled HIC142 Friday evening
  
  207   Thu Jul 5 03:04:50 2007 Doug PreddyNormal RunningPower lead problemsThe power leads temps are starting to cycle
again. Earlier today M9 
experimentor cycled HIC142 to stablize the
  
  44   Wed Aug 25 07:47:05 2004 Doug PreddyNormal RunningPower lead flowThe power lead flows had dropped to 210 mm
this morning. I increased HIC142 
from 0.8 to 0.83. The flows are back to <250
  
  102   Tue Jun 14 18:48:14 2005 ExperimentorNormal RunningPower bump at 18:40Solenoid tripped on a power bump at 18:40
Tuesday
-- Donald Arseneau
  
  186   Mon Mar 5 14:59:41 2007 Doug PreddyMaintenancePasswordOn the weekend someone used this log to send
spam messages. I have 
installed a password for the write privilege.
  
  224   Tue Oct 2 13:02:37 2007 Doug PreddyNormal RunningPLC problemsWhile downloading new code for 2A PLC the
M9 and M15 vacuum systems were 
shut off. This is due to the two systems
  
  221   Tue Sep 25 07:34:04 2007 Doug PreddyStart UpPIC229 to 11 baradjusted turbine speeds and HIC104 to maintain
their values.
  
  7   Tue Apr 20 07:33:03 2004 Doug PreddyStart UpPIC229 at 11barPIC229 at 11 bar. Changed strip tool to 15
sec increments.
  
  139   Thu Jul 20 11:01:09 2006 Willy AnderssonQuench RecoveryOpened up warm return valves CV151 and CV153Mu2 pressure was just about at trip point
due to trapped volume of helium 
warming. So opened up warm returns to bleed
  
  145   Fri Jul 21 17:18:19 2006 Willy AnderssonQuench RecoveryOpened HIC142 fully openPower leads have flatlined but still building
LHe level.
  
  242   Mon Dec 3 14:59:58 2007 Doug PreddyQuench RecoveryNot really a quench recovery, But...Not really a quench recovery, but...I wanted
to send this out via e-mail. 
The contactor for the compressor building
  
  219   Wed Sep 19 20:53:18 2007 Doug PreddyMaintenanceMore diff pump newsCold box pumped out to ~ 190 mTorr overnight.Leak
checked the pump again. 
Still leaks at dip stick.Tried resetting
  
  82   Wed Nov 24 07:28:30 2004 Other Mission Impossible   
ELOG V2.9.2-2455