Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1287, Page 3 of 4  ELOG logo
ID Datedown Author Type Category Subject Text Attachments
  21   Mon May 16 21:14:19 2011 Jamie Brown  Broken solder on PD2As you can see...  PD2-broken_solder.png 
  20   Sun May 15 13:07:12 2011 JB  W detector V-I curveYork W detector 2635-19
1037um
 W_detector_V-I_curve.png 
  19   Thu May 12 03:04:44 2011 Tom Davinson  Re: Re-entrant flange alignment> Alignments checks revealed that downstream
end of
> TUDA was ~1mm off (can't remember which
  
  18   Wed May 11 17:59:12 2011 JB  Re-entrant flange alignmentAlignments checks revealed that downstream
end of TUDA was ~1mm off (can't remember
which way).
  
  17   Sat May 7 17:29:13 2011 JB  Window leak tests on TUDAAttached plot shows rate of pressure increase
in ~2l volume upstream of TUDA with Ni window
#2 installed on reentrant flange. Comparison
 window2-leaktest.png 
  16   Fri May 6 15:08:00 2011 JB  New TUDA EPICS layout   gas_handling-3.png 
  15   Fri May 6 06:03:00 2011 Tom Davinson  Sort programs, spectra titles & calibration procedureA summary of online sort programs can be found
at:
  
  14   Thu May 5 11:31:13 2011 JB  Tom's ToDo List 

  
  13   Sun Apr 17 09:47:04 2011 Tom Davinson  Sunday 17 AprilContinuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
 He_test.png 
  12   Sat Apr 16 09:31:56 2011 Tom Davinson  Saturday 16 AprilContinuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
  
  11   Fri Apr 15 11:00:17 2011 Tom Davinson  Friday 15 April11.15 See attachment 1 for overnight EPICS
log of TUDA2.CG5
      Downstream flange *not* secured by
 2.png6.png 
  10   Thu Apr 14 10:06:34 2011 Tom Davinson  Thursday 14 April
10.02 See attachment 1 for overnight EPICS
log of TUDA2.CG5
 1.png5.png 
  9   Wed Apr 13 09:37:51 2011 Tom Davinson  Wednesday 13 April
09.20 TUDA2.PNG5 1.04E-06Torr
      See attachments 1 & 2 for EPICS log
 3.png2.png4.png 
  8   Wed Apr 13 03:55:21 2011 Jamie  Safety Reportattached
 
note. s2 position in fig. 1 is wrong,
 S1287-Revised_Safety_Report.pdfrevised.pdf 
  7   Wed Apr 13 03:43:42 2011 Jamie  Ni window leak tests 12um x 8 mm Ni windows leaked tested on
TUDA gas cell. With window placed on the
outside of the cell, cell was evacuated and
 Screenshot.pngScreenshot-1.png 
  6   Tue Apr 12 11:21:38 2011 Tom Davinson  Tuesday 12 April The TUDA @ ISAC-II grounding test was successfully
completed this am
per work permit 2011-04-12-2.
 1.png 
  5   Mon Apr 11 18:39:17 2011 Tom Davinson  Monday 11 April
TUDA was successfully re-installed on SEBT1
by LB, TD, AML and PM.
 2.png3.png4.png 
  4   Mon Apr 11 14:57:08 2011 Tom Davinson  SEBT1 & HERACLES wipe tests
Work permit (2011-4-11-3) was requested to
vent SEBT1 upstream of TUDA chamber
  
  3   Sat Apr 9 14:57:30 2011 Tom Davinson  MIDAS DAQ configuration
tuda2 (by TUDA chamber, SEBT1) was powered
off on arrival
 11x 
  2   Sat Apr 9 11:35:14 2011 Tom Davinson  TUDA configuration & setup
Nominal detector configuration for S1287
is as follows:
 GasTUDA-7.png 
ELOG V2.9.2-2455