Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1287, Page 3 of 3  ELOG logo
Entry  Wed May 11 17:59:12 2011, JB, , , Re-entrant flange alignment 
Alignments checks revealed that downstream end of TUDA was ~1mm off (can't remember which way).
Re-entrant flange (window end) found to be ~5mm too low and ~2mm to the left. Checked upstream end of chamber and was ok.
Removed bellows etc. and re-entrant flange, replaced with re-entrant flange bolts only figure tight. Tighten bolts from inside chamber whilst checking
    Reply  Thu May 12 03:04:44 2011, Tom Davinson, , , Re: Re-entrant flange alignment 
> Alignments checks revealed that downstream end of
> TUDA was ~1mm off (can't remember which way).
Entry  Sat May 7 17:29:13 2011, JB, , , Window leak tests on TUDA window2-leaktest.png
Attached plot shows rate of pressure increase in ~2l volume upstream of TUDA with Ni window #2 installed on reentrant flange. Comparison between
a)pumping out TUDA and 2l volume, and
b) filling TUDA with ~340mbar of He and pumping out 2l volume.
Entry  Fri May 6 15:08:00 2011, JB, , , New TUDA EPICS layout gas_handling-3.png
 
Entry  Fri May 6 06:03:00 2011, Tom Davinson, , , Sort programs, spectra titles & calibration procedure 
A summary of online sort programs can be found at:

~/S1287/sort/README
Entry  Thu May 5 11:31:13 2011, JB, , , Tom's ToDo List 
 


Version 2 of ...

- re-test
chamber/coolant loop with vacuum cycle - done
- install MSL Type W preamp - done
- to adjust position of support ring, temporarily loosen
Entry  Sun Apr 17 09:47:04 2011, Tom Davinson, , , Sunday 17 April He_test.png
Continuation of yesterday's test with c. 300mBar of He
in the TUDA chamber.
Entry  Sat Apr 16 09:31:56 2011, Tom Davinson, , , Saturday 16 April 
Continuation of yesterday's test with c. 300mBar of He
in the TUDA chamber.
Entry  Fri Apr 15 11:00:17 2011, Tom Davinson, , , Friday 15 April 2.png6.png
11.15 See attachment 1 for overnight EPICS log of TUDA2.CG5
      Downstream flange *not* secured by four bolts
      Current pressure 0.97Torr - rate of increase ~0.2 Torr/5h
Entry  Thu Apr 14 10:06:34 2011, Tom Davinson, , , Thursday 14 April 1.png5.png

10.02 See attachment 1 for overnight EPICS log of TUDA2.CG5
      Downstream flange secured by four bolts
Entry  Wed Apr 13 09:37:51 2011, Tom Davinson, , , Wednesday 13 April 3.png2.png4.png

09.20 TUDA2.PNG5 1.04E-06Torr
      See attachments 1 & 2 for EPICS log of pump down and overnight
Entry  Wed Apr 13 03:55:21 2011, Jamie, , , Safety Report S1287-Revised_Safety_Report.pdfrevised.pdf
attached
 
note. s2 position in fig. 1 is wrong, should be 360mm.
Entry  Wed Apr 13 03:43:42 2011, Jamie, , , Ni window leak tests 1 Screenshot.pngScreenshot-1.png
2um x 8 mm Ni windows leaked tested on TUDA gas cell. With window placed on the outside of the cell, cell was evacuated and pressure monitored with time,
i.e. 1atm differential air pressure. Comparison to leak rate with blank flange also do.
Tests were performed in order: Ni, 30 minuets pumping, Ni again, blank, Ni third time.
Entry  Tue Apr 12 11:21:38 2011, Tom Davinson, , , Tuesday 12 April  1.png
The TUDA @ ISAC-II grounding test was successfully completed this am
per work permit 2011-04-12-2.
Entry  Mon Apr 11 18:39:17 2011, Tom Davinson, , , Monday 11 April 2.png3.png4.png

TUDA was successfully re-installed on SEBT1 by LB, TD, AML and PM.
Alignment checked by pillar mounted telescope downstream of HERACLES
Entry  Mon Apr 11 14:57:08 2011, Tom Davinson, , , SEBT1 & HERACLES wipe tests 

Work permit (2011-4-11-3) was requested to vent SEBT1 upstream of TUDA chamber
and HERACLES to permit line-of-sight for alignment of TUDA chamber. Note that
Entry  Sat Apr 9 14:57:30 2011, Tom Davinson, , , MIDAS DAQ configuration 11x

tuda2 (by TUDA chamber, SEBT1) was powered off on arrival
- this may have been due to a previous power outage between
Entry  Sat Apr 9 11:35:14 2011, Tom Davinson, , , TUDA configuration & setup GasTUDA-7.png

Nominal detector configuration for S1287 is as follows:
Entry  Mon Apr 4 01:34:54 2011, Jamie Brown, Routine, General, Proposal S1287_201007S_merged.pdf
See attached.
ELOG V2.9.2-2455