Tuda logbooks
General
E1104
ISACII
E1195
E1103
E1147
S1287
S1203
S1233
S1284
S1447 23Na(a,p)
S1540
S1381
S1847 Catania
S1287, Page 2 of 4
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
61 Entries
Goto page
Previous
1
, 2,
3
,
4
Next
All
Selected entries:
ID
Date
Author
Type
Category
Subject
Text
60
Fri Jan 11 06:56:01 2013
Jessica Tomlinson
Other
General
multiplicities, hit patterns and good hits in an event
I have attached a pdf of a series of slides
with some multiplicity and hit pattern plots
on, also a list of cuts. As well as this
61
Fri Jan 11 09:48:58 2013
Tom Davinson
Other
General
Re: multiplicities, hit patterns and good hits in an event
2
Sat Apr 9 11:35:14 2011
Tom Davinson
TUDA configuration & setup
Nominal detector configuration for S1287
is as follows:
3
Sat Apr 9 14:57:30 2011
Tom Davinson
MIDAS DAQ configuration
tuda2 (by TUDA chamber, SEBT1) was powered
off on arrival
11x
4
Mon Apr 11 14:57:08 2011
Tom Davinson
SEBT1 & HERACLES wipe tests
Work permit (2011-4-11-3) was requested to
vent SEBT1 upstream of TUDA chamber
5
Mon Apr 11 18:39:17 2011
Tom Davinson
Monday 11 April
TUDA was successfully re-installed on SEBT1
by LB, TD, AML and PM.
6
Tue Apr 12 11:21:38 2011
Tom Davinson
Tuesday 12 April
The TUDA @ ISAC-II grounding test was successfully
completed this am
per work permit 2011-04-12-2.
7
Wed Apr 13 03:43:42 2011
Jamie
Ni window leak tests 1
2um x 8 mm Ni windows leaked tested on
TUDA gas cell. With window placed on the
outside of the cell, cell was evacuated and
8
Wed Apr 13 03:55:21 2011
Jamie
Safety Report
attached
note. s2 position in fig. 1 is wrong,
9
Wed Apr 13 09:37:51 2011
Tom Davinson
Wednesday 13 April
09.20 TUDA2.PNG5 1.04E-06Torr
See attachments 1 & 2 for EPICS log
10
Thu Apr 14 10:06:34 2011
Tom Davinson
Thursday 14 April
10.02 See attachment 1 for overnight EPICS
log of TUDA2.CG5
11
Fri Apr 15 11:00:17 2011
Tom Davinson
Friday 15 April
11.15 See attachment 1 for overnight EPICS
log of TUDA2.CG5
Downstream flange *not* secured by
12
Sat Apr 16 09:31:56 2011
Tom Davinson
Saturday 16 April
Continuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
13
Sun Apr 17 09:47:04 2011
Tom Davinson
Sunday 17 April
Continuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
14
Thu May 5 11:31:13 2011
JB
Tom's ToDo List
15
Fri May 6 06:03:00 2011
Tom Davinson
Sort programs, spectra titles & calibration procedure
A summary of online sort programs can be found
at:
16
Fri May 6 15:08:00 2011
JB
New TUDA EPICS layout
17
Sat May 7 17:29:13 2011
JB
Window leak tests on TUDA
Attached plot shows rate of pressure increase
in ~2l volume upstream of TUDA with Ni window
#2 installed on reentrant flange. Comparison
18
Wed May 11 17:59:12 2011
JB
Re-entrant flange alignment
Alignments checks revealed that downstream
end of TUDA was ~1mm off (can't remember
which way).
19
Thu May 12 03:04:44 2011
Tom Davinson
Re: Re-entrant flange alignment
> Alignments checks revealed that downstream
end of
> TUDA was ~1mm off (can't remember which
Goto page
Previous
1
, 2,
3
,
4
Next
All
ELOG V2.9.2-2455