  38   Tue May 24 23:59:16 2011 Jennifer Fallis, Lars MartinRoutineGeneralShift summaryBuncher problem was resolved around 22:00
(driver module needed to be replaced).
Checked current on FC0 and trigger rate,
  
  49   Fri May 27 23:13:01 2011 Alex RojasRoutineGeneralShift summaryNo major problems presented, A pluser walk
was performed at the begining of the shift
run161 S2-1 front, run162 S2-2 front, run163
  
  35   Tue May 24 01:47:17 2011 Anonymous  Shift schedule, as of 1am Tuesday 24th   Screenshot.png 
  12   Sat Apr 16 09:31:56 2011 Tom Davinson  Saturday 16 AprilContinuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
  
  8   Wed Apr 13 03:55:21 2011 Jamie  Safety Reportattached
 
note. s2 position in fig. 1 is wrong,
 S1287-Revised_Safety_Report.pdfrevised.pdf 
  4   Mon Apr 11 14:57:08 2011 Tom Davinson  SEBT1 & HERACLES wipe tests
Work permit (2011-4-11-3) was requested to
vent SEBT1 upstream of TUDA chamber
  
  58   Fri Nov 16 07:23:26 2012 Jessica TomlinsonOtherGeneralS2-1 plot that would fit on previous elog Attachment 1 shows S2-1 energy vs
time with a gate on energy in S2-2 being
greater than 9MeV i.e. See previous elog
 S2-1-evst-9mevcut.001.png 
  48   Fri May 27 14:24:00 2011 Tom Davinson  S1287 data transfer
S1287 data files R1_*.gz to R100_*.gz transferred
from directory
  
  52   Mon Jun 20 05:58:21 2011 Jamie Brown  Run logAttached is a spreadsheet summarizing all
the run information from the experiment.
 run_log.xls 
  53   Tue Jun 21 02:58:31 2011 Jamie Brown  Run Books 13 and 14Attached. Book 13 is split into 4 sections
as otherwise the file is too big for the
elog to accept.
 tuda_book13_1-47.pdftuda_book13_48-95.pdftuda_book13_96-143.pdftuda_book13_144-191.pdftuda_book14.pdf 
  41   Wed May 25 18:05:55 2011 Mike BentleyRoutineGeneralReport on day shift and changed energy - now at 3.98 MeV/u All ran smoothly.
As a test, ran for a short period
at 1200 midday to run without S2-2 in the
 photo.png 
  61   Fri Jan 11 09:48:58 2013 Tom DavinsonOtherGeneralRe: multiplicities, hit patterns and good hits in an event
  
  19   Thu May 12 03:04:44 2011 Tom Davinson  Re: Re-entrant flange alignment> Alignments checks revealed that downstream
end of
> TUDA was ~1mm off (can't remember which
  
  34   Tue May 24 01:16:37 2011 Tom DavinsonRoutineGeneralRe: End of Shift summary
1.TDCs. We have been sorting offline, and
we have now established that between run
  
  18   Wed May 11 17:59:12 2011 JB  Re-entrant flange alignmentAlignments checks revealed that downstream
end of TUDA was ~1mm off (can't remember
which way).
  
  1   Mon Apr 4 01:34:54 2011 Jamie BrownRoutineGeneralProposalSee attached.  S1287_201007S_merged.pdf 
  51   Sat May 28 10:07:44 2011 Jamie Brown, and Mike Bentley  Plan for last day1) PD run with gas (250Torr) - done
2) Pump down to 50 Torr - done
3) PD run - done
  
  23   Wed May 18 08:54:08 2011 Alex Murphy  Photodiode data from target thickness measurements In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements.
 pdruns.xls 
  7   Wed Apr 13 03:43:42 2011 Jamie  Ni window leak tests 12um x 8 mm Ni windows leaked tested on
TUDA gas cell. With window placed on the
outside of the cell, cell was evacuated and
 Screenshot.pngScreenshot-1.png 
  16   Fri May 6 15:08:00 2011 JB  New TUDA EPICS layout   gas_handling-3.png 