ID |
Date |
Author |
Type |
Category |
Subject |
Text |
|
38
|
Tue May 24 23:59:16 2011 |
Jennifer Fallis, Lars Martin | Routine | General | Shift summary | Buncher problem was resolved around 22:00
(driver module needed to be replaced).
Checked current on FC0 and trigger rate, |
|
49
|
Fri May 27 23:13:01 2011 |
Alex Rojas | Routine | General | Shift summary | No major problems presented, A pluser walk
was performed at the begining of the shift
run161 S2-1 front, run162 S2-2 front, run163 |
|
35
|
Tue May 24 01:47:17 2011 |
Anonymous | | | Shift schedule, as of 1am Tuesday 24th | |
|
12
|
Sat Apr 16 09:31:56 2011 |
Tom Davinson | | | Saturday 16 April | Continuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
|
|
8
|
Wed Apr 13 03:55:21 2011 |
Jamie | | | Safety Report | attached
note. s2 position in fig. 1 is wrong, |
|
4
|
Mon Apr 11 14:57:08 2011 |
Tom Davinson | | | SEBT1 & HERACLES wipe tests |
Work permit (2011-4-11-3) was requested to
vent SEBT1 upstream of TUDA chamber
|
|
58
|
Fri Nov 16 07:23:26 2012 |
Jessica Tomlinson | Other | General | S2-1 plot that would fit on previous elog | Attachment 1 shows S2-1 energy vs
time with a gate on energy in S2-2 being
greater than 9MeV i.e. See previous elog |
|
48
|
Fri May 27 14:24:00 2011 |
Tom Davinson | | | S1287 data transfer |
S1287 data files R1_*.gz to R100_*.gz transferred
from directory
|
|
52
|
Mon Jun 20 05:58:21 2011 |
Jamie Brown | | | Run log | Attached is a spreadsheet summarizing all
the run information from the experiment. |
|
53
|
Tue Jun 21 02:58:31 2011 |
Jamie Brown | | | Run Books 13 and 14 | Attached. Book 13 is split into 4 sections
as otherwise the file is too big for the
elog to accept. |
|
41
|
Wed May 25 18:05:55 2011 |
Mike Bentley | Routine | General | Report on day shift and changed energy - now at 3.98 MeV/u | All ran smoothly.
As a test, ran for a short period
at 1200 midday to run without S2-2 in the |
|
61
|
Fri Jan 11 09:48:58 2013 |
Tom Davinson | Other | General | Re: multiplicities, hit patterns and good hits in an event |
|
|
19
|
Thu May 12 03:04:44 2011 |
Tom Davinson | | | Re: Re-entrant flange alignment | > Alignments checks revealed that downstream
end of
> TUDA was ~1mm off (can't remember which |
|
34
|
Tue May 24 01:16:37 2011 |
Tom Davinson | Routine | General | Re: End of Shift summary |
1.TDCs. We have been sorting offline, and
we have now established that between run |
|
18
|
Wed May 11 17:59:12 2011 |
JB | | | Re-entrant flange alignment | Alignments checks revealed that downstream
end of TUDA was ~1mm off (can't remember
which way). |
|
1
|
Mon Apr 4 01:34:54 2011 |
Jamie Brown | Routine | General | Proposal | See attached. |
|
51
|
Sat May 28 10:07:44 2011 |
Jamie Brown, and Mike Bentley | | | Plan for last day | 1) PD run with gas (250Torr) - done
2) Pump down to 50 Torr - done
3) PD run - done |
|
23
|
Wed May 18 08:54:08 2011 |
Alex Murphy | | | Photodiode data from target thickness measurements | In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements. |
|
7
|
Wed Apr 13 03:43:42 2011 |
Jamie | | | Ni window leak tests 1 | 2um x 8 mm Ni windows leaked tested on
TUDA gas cell. With window placed on the
outside of the cell, cell was evacuated and |
|
16
|
Fri May 6 15:08:00 2011 |
JB | | | New TUDA EPICS layout | |
|