21
|
Mon May 16 21:14:19 2011 |
Jamie Brown | | | Broken solder on PD2 | As you can see... |
|
|
20
|
Sun May 15 13:07:12 2011 |
JB | | | W detector V-I curve | York W detector 2635-19
1037um |
|
|
19
|
Thu May 12 03:04:44 2011 |
Tom Davinson | | | Re: Re-entrant flange alignment | > Alignments checks revealed that downstream
end of
> TUDA was ~1mm off (can't remember which |
|
|
18
|
Wed May 11 17:59:12 2011 |
JB | | | Re-entrant flange alignment | Alignments checks revealed that downstream
end of TUDA was ~1mm off (can't remember
which way). |
|
|
17
|
Sat May 7 17:29:13 2011 |
JB | | | Window leak tests on TUDA | Attached plot shows rate of pressure increase
in ~2l volume upstream of TUDA with Ni window
#2 installed on reentrant flange. Comparison |
|
|
16
|
Fri May 6 15:08:00 2011 |
JB | | | New TUDA EPICS layout | |
|
|
15
|
Fri May 6 06:03:00 2011 |
Tom Davinson | | | Sort programs, spectra titles & calibration procedure | A summary of online sort programs can be found
at:
|
|
|
14
|
Thu May 5 11:31:13 2011 |
JB | | | Tom's ToDo List |
|
|
|
13
|
Sun Apr 17 09:47:04 2011 |
Tom Davinson | | | Sunday 17 April | Continuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
|
|
|
12
|
Sat Apr 16 09:31:56 2011 |
Tom Davinson | | | Saturday 16 April | Continuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
|
|
|
11
|
Fri Apr 15 11:00:17 2011 |
Tom Davinson | | | Friday 15 April | 11.15 See attachment 1 for overnight EPICS
log of TUDA2.CG5
Downstream flange *not* secured by |
 |
|
10
|
Thu Apr 14 10:06:34 2011 |
Tom Davinson | | | Thursday 14 April |
10.02 See attachment 1 for overnight EPICS
log of TUDA2.CG5
|
 |
|
9
|
Wed Apr 13 09:37:51 2011 |
Tom Davinson | | | Wednesday 13 April |
09.20 TUDA2.PNG5 1.04E-06Torr
See attachments 1 & 2 for EPICS log |
  |
|
8
|
Wed Apr 13 03:55:21 2011 |
Jamie | | | Safety Report | attached
note. s2 position in fig. 1 is wrong, |
 |
|
7
|
Wed Apr 13 03:43:42 2011 |
Jamie | | | Ni window leak tests 1 | 2um x 8 mm Ni windows leaked tested on
TUDA gas cell. With window placed on the
outside of the cell, cell was evacuated and |
 |
|
6
|
Tue Apr 12 11:21:38 2011 |
Tom Davinson | | | Tuesday 12 April | The TUDA @ ISAC-II grounding test was successfully
completed this am
per work permit 2011-04-12-2.
|
|
|
5
|
Mon Apr 11 18:39:17 2011 |
Tom Davinson | | | Monday 11 April |
TUDA was successfully re-installed on SEBT1
by LB, TD, AML and PM.
|
  |
|
4
|
Mon Apr 11 14:57:08 2011 |
Tom Davinson | | | SEBT1 & HERACLES wipe tests |
Work permit (2011-4-11-3) was requested to
vent SEBT1 upstream of TUDA chamber
|
|
|
3
|
Sat Apr 9 14:57:30 2011 |
Tom Davinson | | | MIDAS DAQ configuration |
tuda2 (by TUDA chamber, SEBT1) was powered
off on arrival
|
11x |
|
2
|
Sat Apr 9 11:35:14 2011 |
Tom Davinson | | | TUDA configuration & setup |
Nominal detector configuration for S1287
is as follows:
|
|