  722   Tuesday, May 14, 2019, 10:22 Aaron SchmidtZrC#8LP-SISITETM243044-542972-3In progressConditioning ZrC#8 HSTuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on.
 ZrC#8.docxTS-2019-05-14-11-05.rgaTS-2019-05-16-07-30.rgaTS-2019-05-21-07-10.rgaITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx 
  274   Friday, January 18, 2013, 15:34 Anders Mjosempty      Pumping down empty chamberStarted roughing
Friday, January 18, 2013, 15:25:
Started turbos
  
  683   Friday, August 31, 2018, 12:27 Aaron SchmidtnSiC#1LP-SISITWTM243044-142752-4In progressConditioning nSiC#1Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo
pumps started.
 15x 
  739   Wednesday, June 26, 2019, 14:41 Carla Babcocknone     Problems/SolutionsIssues with test stand wiring in service cap areaThe wiring on the top of the test stand
was burned, see entry 737.
Probable cause of this is as follows:
 isk4523d_ITSrewiring_June2019.png 
  735   Saturday, June 22, 2019, 17:05 Luca Egoritip2n     DoneTest stand installationI opened the test stand because I forgot
to install tantalum heat shields around the
target. Everything was reinstalled as before
  
  744   Monday, July 08, 2019, 09:20 Luca Egoritip2n1 ITE   In progressp2n heating test(see entry 742)
 
p2n target heated over the weekend
 Capture.PNGCapture1.PNG 
  86   Tuesday, May 15, 2012, 08:08 Rick Maharajsic#27      Turbos offTarget needs to be removed form teststand
to remove heatshielding around target oven.
The chamber will be vented, water circuits
  