ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
29
|
Friday, January 20, 2012, 10:37 |
Friedhelm Ames | | | | | | | | vacuum pumps shut off | turbo pumps shut off due to work on
cooling water system |
|
254
|
Wednesday, December 19, 2012, 09:44 |
Sebastian Raeder | | | | | | | In progress | venting | venting and inspect the target
Wednesday, December 19, 2012, 09:43:
vqacuum at 1.9E-7T, stop turbos |
|
57
|
Wednesday, March 07, 2012, 09:27 |
Friedhelm Ames | Nb#6 | | | | | | Done | water cooling started | water cooling line valves opened. No response
on vacuum TSG:IG1 3.5e-7 T |
|
124
|
Wednesday, July 04, 2012, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | water lines purged |
|
|
128
|
Thursday, July 05, 2012, 10:59 |
Friedhelm Ames | | | | | | | Problems/Solutions | water tripping in front of HV power supplies | Found some water tripping in front of the
high voltage power supplies rack from the
water lines at the ceiling. Plastic sheets |
|
251
|
Monday, December 17, 2012, 22:35 |
Sebastian Raeder | RFQ empty | | | | | | | wire connection for RFQ test | Overview over the connections of the new
9Pin connector inside the vacuum and in the
HV cage |
|
915
|
Monday, April 04, 2022, 20:56 |
Carla Babcock | | | | | | | | wiring reverted for cathode-bias FEBIAD | Wiring which was changed to run the mass
marker tests has been reverted:
anode bias cable connected |
|