ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  86   Tuesday, May 15, 2012, 08:08 Rick Maharajsic#27      Turbos offTarget needs to be removed form teststand
to remove heatshielding around target oven.
The chamber will be vented, water circuits
  
  744   Monday, July 08, 2019, 09:20 Luca Egoritip2n1 ITE   In progressp2n heating test(see entry 742)
 
p2n target heated over the weekend
 Capture.PNGCapture1.PNG 
  735   Saturday, June 22, 2019, 17:05 Luca Egoritip2n     DoneTest stand installationI opened the test stand because I forgot
to install tantalum heat shields around the
target. Everything was reinstalled as before
  
  739   Wednesday, June 26, 2019, 14:41 Carla Babcocknone     Problems/SolutionsIssues with test stand wiring in service cap areaThe wiring on the top of the test stand
was burned, see entry 737.
Probable cause of this is as follows:
 isk4523d_ITSrewiring_June2019.png 
  683   Friday, August 31, 2018, 12:27 Aaron SchmidtnSiC#1LP-SISITWTM243044-142752-4In progressConditioning nSiC#1Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo
pumps started.
 15x 
  274   Friday, January 18, 2013, 15:34 Anders Mjosempty      Pumping down empty chamberStarted roughing
Friday, January 18, 2013, 15:25:
Started turbos
  
  722   Tuesday, May 14, 2019, 10:22 Aaron SchmidtZrC#8LP-SISITETM243044-542972-3In progressConditioning ZrC#8 HSTuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on.
 ZrC#8.docxTS-2019-05-14-11-05.rgaTS-2019-05-16-07-30.rgaTS-2019-05-21-07-10.rgaITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx 
  450   Monday, June 15, 2015, 14:09 Anders MjosZrC#7LP-SIS TM241177-1 In progressZrC#7 ConditioningMonday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos
started.
 ZrC#7.docxER580-220-30kV-m39-off30.txt 
  454   Tuesday, June 30, 2015, 14:51 Anders MjosZrC#7LP-SIS TM241177-2 In progressZrC#7 Conditioning 2Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started
turbos. CG1 at 0.075 T
 ZrC#7_Second_Time.docxTGT2-ER580-200-30kV-m39-off60-3.txt 
  397   Friday, August 08, 2014, 12:45 Anders MjosZrC#6LP-SISITWTM140282-339230-5DoneCondictioning ZrC#6Friday, August 08, 2014, 12:44: Stopped
turbos
Friday, August 08, 2014, 14:42: Venting 
  
  930   Tuesday, May 31, 2022, 13:35 Aaron SchmidtUCx HS ITWTM2 44378-19In progressConditioning UC#38 assemblyUsing a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B
  
  804   Tuesday, August 04, 2020, 15:07 Aaron SchmidtUCxLP-SIS  44139-1043515-4In progressUCx HS conditioning with PEEK assembly Tuesday, August 04, 2020, 15:04:
Roughing.

Wednesday, August 05, 2020,
 UCx_-_HS_w-PEEK_Assy_-_43515-4.docx 
  806   Tuesday, August 11, 2020, 12:04 Aaron SchmidtUCxLP-SIS  44139-1043515-4In progressUCx HS conditioning with PEEK assemblyHS target leg openings were milled. Short
from previous test by the look of it. TBHT
insulator on source side is cracked.
  
  371   Friday, April 04, 2014, 17:01 Rick MaharajUC#9LP-SISITWTM1 39230-3DoneConditioning Heatshield for UCx#9Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS  installed in
test stand with Ta tube as heat load.
  
  944   Tuesday, November 15, 2022, 11:24 Aaron SchmidtUC#41 assemblyLP-SISITETM445220-845235-4In progressConditioning UC#41 assembly LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00:
 UC#41_assembly_conditioning.docx 
  875   Wednesday, June 02, 2021, 10:45 Aaron SchmidtUC#34 HSLP-SIS TM243044-1344378-1In progressUC#34 HS conditioning Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06:
Roughing.
  
  874   Wednesday, May 26, 2021, 14:29 Aaron SchmidtUC#33 (HS)LP-SISITWTM2 44378-3In progressUC#33 HS conditioningHS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B
 Conditioning_UC#33_HS.docx 
  686   Friday, September 21, 2018, 11:41 Aaron SchmidtUC#26LP-IG-LISITETM4 42132-1In progressConditioning Heat Shield for UC#26Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41:
Doors sealed for roughing.
 TS-2018-09-21-14-53.rgaUC#26.docx 
  685   Monday, September 17, 2018, 11:52 Aaron SchmidtUC#25LP-SISITWTM2 42752-9In progressConditioning Heat Shield for UC#25Monday, September 17, 2018, 11:47: Roughing*.
Doors not sealing, help acq'd 
Monday, September 17, 2018, 11:51:
 OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlpTS-2018-09-17-14-10.rgaUC#25.docx 
  676   Friday, July 27, 2018, 14:44 Aaron SchmidtUC#24LP-SISITETM441177-342752-6In progressConditioning Heat Shield for UC#24 & voltage test prep4 Kapton wire routed into the 9-pin connector.
Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing
  