  Test-Stand, Page 1 of 51  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  915   Monday, April 04, 2022, 20:56 Carla Babcock       wiring reverted for cathode-bias FEBIADWiring which was changed to run the mass
marker tests has been reverted:

    anode bias cable connected
  
  251   Monday, December 17, 2012, 22:35 Sebastian RaederRFQ empty      wire connection for RFQ testOverview over the connections of the new
9Pin connector inside the vacuum and in the
HV cage
  
  128   Thursday, July 05, 2012, 10:59 Friedhelm Ames      Problems/Solutionswater tripping in front of HV power suppliesFound some water tripping in front of the
high voltage power supplies rack from the
water lines at the ceiling. Plastic sheets
  
  124   Wednesday, July 04, 2012, 13:07 Anders Mjos      Problems/Solutionswater lines purged

    

       
            
  
  57   Wednesday, March 07, 2012, 09:27 Friedhelm AmesNb#6     Donewater cooling startedwater cooling line valves opened. No response
on vacuum TSG:IG1 3.5e-7 T
  
  254   Wednesday, December 19, 2012, 09:44 Sebastian Raeder      In progressventingventing and inspect the target
Wednesday, December 19, 2012, 09:43:
vqacuum at 1.9E-7T, stop turbos
  
  29   Friday, January 20, 2012, 10:37 Friedhelm Ames       vacuum pumps shut offturbo pumps shut off due to work on
cooling water system
  
  51   Monday, March 05, 2012, 14:41 Friedhelm Ames       vacuum and optics switched offvacuum and optics at teststand switched
off to allow work on the water cooling system.
  
  56   Tuesday, March 06, 2012, 15:51 Friedhelm Ames       turbopumps in mass separator section started    
  71   Wednesday, April 11, 2012, 09:34 Friedhelm Ames       turbopumps in mass separator section startedturbopumps in mass separator section started
after power outages
  
  123   Wednesday, July 04, 2012, 09:22 Friedhelm Ames      Problems/Solutionsturbo pumps stoppedturbo pumps stopped to prepare for venting
for anode short investigation.
  
  30   Tuesday, January 24, 2012, 09:44 Friedhelm Ames       turbo pumps restartedAll turbo pumps have been restarted after
cooling water is back and running.
 
  
  52   Monday, March 05, 2012, 19:31 Friedhelm Ames      Failedturbo pumps failedBoth turbo pumps at the source box cannot
be started. A fault report has been issued.
  
  2   Wednesday, September 14, 2011, 15:33 John WongTest#1HP-SISITWTM1testtestIn progresstesting elog for test standWednesday, September 14, 2011, 15:33
blah blah blah...
  
  146   Thursday, July 12, 2012, 15:49 Anders Mjos       test stand vented for TP1A replacementsee e-fault 6142   
  9   Friday, September 23, 2011, 15:38 Rick Maharaj       test stand ventedTest stand vented   
  89   Tuesday, May 15, 2012, 08:42 Rick Maharaj       target removed    
  90   Tuesday, May 15, 2012, 09:46 Rick Maharaj       target reinstalled pumping started    
  91   Tuesday, May 15, 2012, 10:14 Anders MjosSiC#27HP-SISITETM4  In progresstarget ready to be heated and biased Tuesday, May 15, 2012, 10:13: Turbo
pumps at speed. Vacuum at 1.4E-5.
Tuesday, May 15, 2012, 12:03: Cooling
  
  253   Tuesday, December 18, 2012, 16:00 Sebastian RaederRFQ empty     Donetarget heatingTuesday, December 18, 2012, ~ 13:00 start
ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56:
 heatint_rfq_dec18_2012.PNGheatint_rfq_dec18_2012_detail.PNG 