  11   Friday, September 23, 2011, 16:42 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8In progressTarget ready to be heatedFriday, September 23, 2011, 16:4: Target
installed and roughing started.
Friday, September 23, 2011, 17:12:
  
  14   Wednesday, September 28, 2011, 14:11 Friedhelm AmesSiC#26 ITETM4   gas system checked and pumpedThe gas system has been checked. The variable
valve opens at about 7.55 very fast. Please
be careful when using it. Stepsize for opening
  
  15   Wednesday, September 28, 2011, 16:33 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8In progressHV conditioningStarted the HV conditioning: TSG:BIAS=30kV   
  16   Thursday, September 29, 2011, 09:27 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8In progressHeaters conditioningStarted the heaters conditioning: TGHT
up to 580A and TBHT up to 230A.
  
  17   Friday, September 30, 2011, 18:03 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8DoneFinished testing SiC#26 at the Test StandToday, did a did a mass scan: plotdump-local-clean.txt
Sep30 11 12-20-08.txt
Optimized a bit the tune with Friedhelm,
  
  18   Monday, October 03, 2011, 10:53 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8DoneTarget is ready to be removed. Turned off the HV and locked up the transformer.
Isolated the ion source box. The target is
under vacuum and the water is still on.
  
  19   Monday, October 03, 2011, 13:56 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneVenting

    

       
            
  
  20   Monday, October 03, 2011, 14:46 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget stored under vacuum

    

       
            
  
  21   Wednesday, October 12, 2011, 13:14 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget removed

    

       
            
  
  84   Monday, May 14, 2012, 16:57 Aurelia Laxdal  ITETM4   SiC#27-HP-SIS installed in the Test StandRick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012
in the Test Stand. Pumping down.
  
  85   Tuesday, May 15, 2012, 07:39 Rick MaharajSic #27HP-SISITETM4  In progressWater on at test standThe vacuum on TSGIG1 reads 2.85e-07. Turing
on water on teststand and observing any changes
in vacuum pressure.
  
  91   Tuesday, May 15, 2012, 10:14 Anders MjosSiC#27HP-SISITETM4  In progresstarget ready to be heated and biased Tuesday, May 15, 2012, 10:13: Turbo
pumps at speed. Vacuum at 1.4E-5.
Tuesday, May 15, 2012, 12:03: Cooling
  
  92   Tuesday, May 15, 2012, 16:18 Aurelia LaxdalSiC#27HP-SISITETM4  In progressTarget/Ion source conditioningDid the HV conditioning up to 30kV and
started to ramp up the heaters to 580A and
230A.
  
  94   Wednesday, May 16, 2012, 18:10 Aurelia Laxdal  ITETM4   SiC#27 cooling downToday: did a mass scan at 580A on TGHT
and 230A on TBHT at 30kV. Found some A/q
units discrepancies on the mass scan page.
  
  96   Thursday, May 17, 2012, 08:36 Anders MjosSiC#27HP-SISITETM4  DoneTarget removedThursday, May 17, 2012, 08:36: Turbo pumps
switched off in preparation of target removal.
Thursday, May 17, 2012, 08:51: Purging
  
  97   Thursday, May 17, 2012, 12:19 Anders MjosSiC#27HP-SISITETM4  Problems/SolutionsLoose chip of insulator material detected

    

       
            
 Chipped_insulator_stand-off.pdf 
  98   Thursday, May 17, 2012, 13:24 John WongSiC#27HP-SISITETM438817-3 Problems/SolutionsSolid residues found on EE Thursday, May 17, 2012, 13:15
After the test-stand, the EE was
removed for inspection.  It was discovered
 SiC#27_after_teststand.pdfSiC#27_clean_EE.pdf 
  180   Thursday, August 23, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  In progressNiO#1 installedThursday, August 23, 2012, 11:38: NiO#1
installed.
Thursday, August 23, 2012, 11:38:
  
  182   Friday, August 24, 2012, 08:28 Anders MjosNiO#1HP-FEBIADITETM4  DoneNiO#1 installed

    

       
            
  
  183   Monday, August 27, 2012, 13:21 Aurelia LaxdalNiO#1HP-FEBIADITETM4  In progressHV conditioning at Test Stand Did HV conditioning up to TSG:BIAS=30kV,
TSH=EE=-600V
Turned off the HV for Kazuya to check
  