  Test-Stand, Page 1 of 51  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  2   Wednesday, September 14, 2011, 15:33 John WongTest#1HP-SISITWTM1testtestIn progresstesting elog for test standWednesday, September 14, 2011, 15:33
blah blah blah...
  
  748   Sunday, July 28, 2019, 14:22 Luca EgoritiP2N - 1HP-FEBIADITETM2p2n - test1p2n - test1Problems/Solutionsp2n heating test 3Friday. July 26th 2019 
A new electrical configuration of
the test stand was decided and installed.
 20190728_-_p2n_heating_3.PNG 
  156   Friday, August 10, 2012, 11:29 Pierre BricaultNA   N ANAIn progressTest FEBIADThe helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out
  
  157   Friday, August 10, 2012, 12:44 Pierre BricaultNALP-FEBIAD  NANAIn progressFEBIAD testRick put the helium bottle back in the
rack.
Waiting for status of the gas lines.
  
  160   Friday, August 10, 2012, 15:29 Pierre BricaultNALP-FEBIAD  NANA finishing the gas installation and its pump1524H Start small pump.
1529H stop the pump.
 
  
  162   Saturday, August 11, 2012, 13:34 Pierre BricaultNALP-FEBIAD  NANAIn progressTest FEBIAD anode bias 120 V    
  756   Thursday, August 29, 2019, 14:47 Fernando Maldonado     Ferran's heat shieldProblems/SolutionsRewiring-Baking outThursday, August 29, 2019, 14:47 : Changing
back to the nominal wiring 
Thursday, August 29, 2019, 17:01:
  
  923   Thursday, May 05, 2022, 14:43 Aaron Schmidt P2N-SIS  45241-145240-1In progressP2N assembly conditioning.Thursday, May 05, 2022, 14:43: Roughing.
Open BV1B
Thursday, May 05, 2022, 14:46: Upper
  
  925   Tuesday, May 10, 2022, 10:09 Aaron Schmidt P2N-SISITETM445241-145240-1In progressP2N assembly conditioning - 2 Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed
  
  926   Wednesday, May 11, 2022, 10:05 Aaron Schmidt P2N-SISITETM444812-245240-1 P2N assembly conditioning - 3Target oven #45241-1 swapped out. SS bolts
were in use on the legs.
Molybdenum screws in the legs on
  
  927   Thursday, May 12, 2022, 10:50 Aaron Schmidt P2N-SISITETM444812-245240-1In progressP2N assembly conditioning - 4PE shimmed & extended 1mm due to likely
ion source contact.
Thursday, May 12, 2022, 10:41: Roughing.
  
  980   Monday, September 25, 2023, 16:31 Aaron SchmidtTa#66LP-SISITWTM245220-545235-9DoneConditioning Ta#66 & HV Tests.Thermocouples installed on the left end
plate x 2.
Monday, September 25, 2023, 16:23:
 Ta#66_HV_Test_1.docxTa#66_HV_test_2.docxTa#66_Conditioning.docx 
  966   Tuesday, May 09, 2023, 10:40 Aaron SchmidtSiC#45HP-SISITETM444692-345235-8In progressConditioning SiC#45Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B
on. 
 SiC#45_Conditioning..docx 
  958   Tuesday, January 31, 2023, 10:42 Aaron Schmidt LP-SIS  44062-1-SK45235-7In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39:
  
  969   Wednesday, May 31, 2023, 15:19 Aaron SchmidtSiCHP-SIS  44692-245235-6In progressConditioning SiC#2023A (Spare) - No salts(Spare HP-SIS SiC)
Wednesday, May 31, 2023, 15:18: Roughing.

Thursday, June 01, 2023,
 SiC#2023A_-_No_Salts.docx 
  944   Tuesday, November 15, 2022, 11:24 Aaron SchmidtUC#41 assemblyLP-SISITETM445220-845235-4In progressConditioning UC#41 assembly LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00:
 UC#41_assembly_conditioning.docx 
  975   Wednesday, August 09, 2023, 14:29 Aaron Schmidt LP-SIS  45220-645235-3In progressGraphite target test 1 (C2023A)Graphite
experiment 2: ID Gr-230601, WO#45220-6 (
 Graphite_target_45220-6.docxGraphitetesting_Aug102023.xlsx 
  976   Monday, August 14, 2023, 12:11 Aaron Schmidt LP-SIS  45220-1145235-3 Graphite target test 2 (C2023B)Graphite experiment insert 1: ID GR-230515,
WO#45220-11. https://elog.triumf.ca/TIS/Evaporator_2/622
New disc form. End caps expanded,
 Graphitetesting_Aug102023.xlsx 
  1000   Thursday, April 04, 2024, 10:38 Dave Neilson LP-SIS  44691-845235-26DoneMass marker testing Thursday, April 04, 2024, 09:49:
Target inserted yesterday, April 3. mass
marker tube connections carefully confirmed.
  
  1006   Wednesday, April 24, 2024, 16:21 Dave Neilson LP-SIS  44691-845235-26   Wednesday, April 24, 2024, 16:20: 
   Target assembly installed.
Wednesday, April 24, 2024, 16:20: 
  