ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  244   Tuesday, December 11, 2012, 13:27 Sebastian Raeder       9 PIN connectorA Sub D 9 Pin connector on a HV insulator
was installed on Port Q of the target box
at the teststand. The insulator is leak tested
  
  245   Tuesday, December 11, 2012, 13:40 Sebastian RaederRFQ empty     DoneHeating test for Ion guide Laser ion sourcenew ion guide laser ion source installed.
Pure target container without targetmaterial
and without surface ion source.
 heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG 
  248   Friday, December 14, 2012, 14:24 Sebastian RaederRFQ empty      VentingFriday, December 14, 2012, 14:24 Stop Turbopumps
and prepare venting to insert RFQ target
  
  250   Friday, December 14, 2012, 20:34 Sebastian RaederRFQ empty     Donepumping downFriday, December 14, 2012, ~ 17:00: start
roughing pumps
Friday, December 14, 2012, 20:33:
  
  251   Monday, December 17, 2012, 22:35 Sebastian RaederRFQ empty      wire connection for RFQ testOverview over the connections of the new
9Pin connector inside the vacuum and in the
HV cage
  
  252   Tuesday, December 18, 2012, 12:51 Sebastian Raeder       Anode powersupply connected to HV-commonThe anode PS is turned off and connected
to HV common.
the Target is connected to a -18V
  
  253   Tuesday, December 18, 2012, 16:00 Sebastian RaederRFQ empty     Donetarget heatingTuesday, December 18, 2012, ~ 13:00 start
ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56:
 heatint_rfq_dec18_2012.PNGheatint_rfq_dec18_2012_detail.PNG 
  254   Wednesday, December 19, 2012, 09:44 Sebastian Raeder      In progressventingventing and inspect the target
Wednesday, December 19, 2012, 09:43:
vqacuum at 1.9E-7T, stop turbos
  
  256   Wednesday, December 19, 2012, 16:22 Sebastian Raeder      Problems/Solutionsstatus after power outageWednesday, December 19, 2012, 16:24:
After long power outage, everything
is off except the roughing pumps. Two turbo
  
  262   Monday, January 07, 2013, 14:52 Sebastian RaederRFQ empty      heating targetheating target for RFQ tests. Now the wiring
is insulated with alumina beats and tubing
and the target has the standard Ta alkali
 RFQ_with_signal_total.PNGRFQ_with_signal.PNG 
  267   Monday, January 14, 2013, 13:51 Sebastian RaederRFQ empty     In progressheatingStarted heating the target, now Silica
sleevings are installed for wire insulation
and the gap target -- repeller is now 0.6mm
  
  269   Tuesday, January 15, 2013, 15:12 Sebastian RaederRFQ empty      Start coolingStart cooling of Target RFQ empty   
  271   Wednesday, January 16, 2013, 01:06 Sebastian RaederRFQ empty      Target installed - pumping downRFQ empty target installed
Wednesday, January 16, 2013, 01:05:
roughing started
  
  272   Thursday, January 17, 2013, 08:16 Sebastian RaederRFQ empty     In progressheatingThursday, January 17, 2013, 08:16: started
heating of the target, vacuum at 2.6E-7T
 Thursday, January 17, 2013,
  
  273   Friday, January 18, 2013, 11:28 Sebastian RaederRFQ empty      stop turbosFriday, January 18, 2013, 11:28: turbos
stopped
  
  284   Tuesday, March 19, 2013, 17:25 Sebastian Raeder      Problems/Solutionsnew turbo installedEdi replaced the faulty turbo pump in the
mass separator section.
Roughing and turbo started
  
  285   Tuesday, March 19, 2013, 19:13 Sebastian Raeder      Problems/Solutions9 Pin connector rewired to match wiring in TM4The 9 Pin connector was rewired in the
ISAC teststand to match the wiring in TM4
The wiring from the connection board
  
  286   Thursday, March 21, 2013, 15:05 Sebastian RaederSiC#28 ITETM4  Done2nd heating of SiC#28 LP-RFQ - short resolved 

    
 20130322_heating.png20130322_massscan_transmission.png20130322_massscan_suppression1.png20130322_suppression2.pnglegs.JPG 
  288   Monday, March 25, 2013, 16:50 Sebastian Raeder      Problems/SolutionsRFQ powersupplies removed - Anode PS still connected to groundThe powersupplies added to the teststand
for operation of the IGLIS source have been
removed from the HV cage as well as the RFQ
  
  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating testHeated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature
  