  1001   Tuesday, April 09, 2024, 15:28 Aaron Schmidt       Set to Anode BIAS Mode & Old gas leak installed.

Switched to Anode mode on March 28 including polarity. The old calibrated leak was also re-installed.

  1003   Monday, April 15, 2024, 14:35 Aaron Schmidt      Problems/SolutionsTSH:EE Issues

Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However it would slowly trickle downward. elog:1002.

Tom H. had a look at it this afternoon & determined the PS is operating, however the signal going to it is peculiar. Controls group as been notified as well. Awaiting further response.


Tuesday, April 16, 2024, 16:09: Full epics & PLC restart needed. All TP & RP shut down.

Tuesday, April 16, 2024, 17:45: Restart RP. TP1B on. TP6 & TP2 on.

Tuesday, April 16, 2024, 17:49: TP1A on.

Tuesday, April 16, 2024, 17:55: Restarted TP6.

Tuesday, April 16, 2024, 18:05: Long sigh* TP6 was in soft start mode. Controller put back to regular start. TP6 started.

Tuesday, April 16, 2024, 18:08: IG1 & IG6 on.


Wednesday, April 17, 2024, 10:25: IG, TP, & RP, off.

Wednesday, April 17, 2024, 13:03: RP on.

Wednesday, April 17, 2024, 13:14: TP1A on.

Wednesday, April 17, 2024, 13:07: TP6, TP2, & TP1B on.

Wednesday, April 17, 2024, 13:23: IG6 & IG1 on.

Wednesday, April 17, 2024, 13:25: EE to -500V. Read back on Epics -500V. PS direct @ -500V

Wednesday, April 17, 2024, 13:26: EE to -1500V. Read back on Epics -1500V. PS direct @ -1500V

Wednesday, April 17, 2024, 14:07: EE was brought back to 0V. ISAC TS closed up & ready for operation.

 

  1013   Wednesday, July 24, 2024, 14:08 Dave Neilson       Beam line window change - DUV installation

Wednesday, July 24, 2024, 14:07   Changed beamline window to DUV window (window at magnet for target source viewing)

  1017   Tuesday, August 06, 2024, 15:50 Aaron Schmidt      Problems/SolutionsTS Troubleshooting - Leak/HV spark issues

Due to HV sparking & possible water leaks on the previous TiC & Ta targets, checks are to be performed.

Chamber is empty. U-Line installed. All waterlines purged. FS#2, 3, 4, & 5 are closed.

Vacuum Group LD #2 - Connected to TP1B backing line

Tuesday, August 06, 2024, 15:50: Vacuum @ 3.38e-06T.

Tuesday, August 06, 2024, 15:52: No He connected. 7.0 E-09 atm-cc. LD TP pressure 1.0e-03T.

Tuesday, August 06, 2024, 16:20: No He connected. 1.1 E-08 atm-cc. LD TP pressure 1.0e-03T.

Tuesday, August 06, 2024, 16:23: Open to chamber. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.

Tuesday, August 06, 2024, 16:26: 20 PSI. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.

Tuesday, August 06, 2024, 16:32: FS#5 Charged with 20 PSI He. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.

Tuesday, August 06, 2024, 16:34: Close FS#5

Tuesday, August 06, 2024, 16:35: FS#4 Charged with 20 PSI He. Increase to 2.5 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.

Tuesday, August 06, 2024, 16:42: While purging FS#4 with HPA, an increase of 8.3 E-08 atm-cc was observed. Vacuum @ 2.75e-06T.

Tuesday, August 06, 2024, 16:50: Re-connected He. FS#3 Charged with 20 PSI He. Increase to from 3.6 to 9.0 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.

Tuesday, August 06, 2024, 16:52: 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.

Tuesday, August 06, 2024, 16:53: Release pressure on FS#3. 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.

Tuesday, August 06, 2024, 16:55: FS#2 Charged with 20 PSI He. Steady @ 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.

Observed increases on FS#3 & FS4.

Tuesday, August 06, 2024, 17:02: All lines purged with HPA. Allow vacuum to continue down.

Tuesday, August 06, 2024, 17:03: Close off LD to TP1B valve. Dropped to 1.7 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.48e-06T. Safe to vent LD.

Tuesday, August 06, 2024, 17:06: LD vented & disconnected.


Wednesday, August 07, 2024, 09:15: Vacuum @ 6.43e-07T. Gradually refill the waterlines. 

Wednesday, August 07, 2024, 09:20: FS#5 open. Vacuum remains steady.

Wednesday, August 07, 2024, 09:28: FS#2 open. Vacuum @ 6.38e-07T.

Wednesday, August 07, 2024, 09:30: FS#4 open. Vacuum @ 6.38e-07T. Wait 5 min.

Wednesday, August 07, 2024, 09:35: Vacuum steady @ 6.36e-07T. Occasional dip to 6.27e-07T.

Wednesday, August 07, 2024, 09:36: FS#3 open. Vacuum steady. Wait 5 min.

Wednesday, August 07, 2024, 09:41: No change to vacuum.

While the helium did get through on yesterdays tests as a minor molecular leak, the water does not appear to have an affect. Moving to an empty HV test.

Wednesday, August 07, 2024, 09:53: Vacuum 6.20e-07T.

Wednesday, August 07, 2024, 10:43: Vacuum 6.20e-07T. IG1 & TP off.   -   venting test stand for target installation

 

Wednesday, August 07, 2024, end of day.  mass marker target installed in test stand with side foil removed so the target is visible through the view port. vacuum roughed, then turbo pumps turned on at end of day for overnight pumping

Thursday, August 08, 2024, 09:19 - vacuum at 6.27e-7T. water cooling was switched on. no effect on vacuum. TGHT and TBHT began ramping at 1A/30s. will test high voltage at low heat and at high heat.

 Thursday, August 08, 2024, 10:04   HV at 35kV. No sparks.  TGHT TBHT at <80A throughout HV ramp and plateau

Thursday, August 08, 2024, 10:14    BIAS down.  TGHT TBHT at 100A. increasing ramp rate to 1.7A/10s. heating up to 480/230

 Thursday, August 08, 2024, 13:59  BIAS has slowly been brought to 28kV . no sparks at all, despite being over 24kV for ~50min. 

Thursday, August 08, 2024, 14:00 increasing TGHT to 580A to attempt to induce sparks. 

Thursday, August 08, 2024, 14:42   at TGHT TBHT 580 230, HV bias at 28kV (with EZL and EE at 0 and 0), no sparks at all over the ramp and over 10 minutes at this condition. 

Thursday, August 08, 2024, 14:43 ramping HV to 30kV

Thursday, August 08, 2024, 15:01  - -  no sparks at 30kV.   bringing up EZL to 13kV  (EE=0)

Thursday, August 08, 2024, 15:11   -  no sparks with EZL at 13kV.  bringing up EE to -2500V

Thursday, August 08, 2024, 15:13  - no sparks with EE at -2500kV

 Thursday, August 08, 2024, 15:22   turned on beam optics to observe beam out, but no beam currently detected on FC0, nor on the wire scanners, nor on FC6. This target commonly has a normal beam output of primarily Na and K

Thursday, August 08, 2024, 15:50  have not been able to deduce reason for lack of beam. increasing BIAS to 50kV.

Thursday, August 08, 2024, 15:51  during ramp up, at 38kV, many optics elements tripped and switched off. however, no spark was registered at the strip tool. not sure of the cause for this.

Thursday, August 08, 2024, 15:54  at 38.8kV, a small spark, only registered on BIAS:RDCUR  (no voltage drop), tripped off beam elements prior to FC0 again.

Thursday, August 08, 2024, 16:00 BIAS at 40kV. no sparks apart from those mentioned immediately above. still have not registered any beam on FC0.

 Thursday, August 08, 2024, 16:02 Vacuum pressure has raised from 6.5e-7 to 1.3e-6 T.

Thursday, August 08, 2024, 16:03  just now, there was a spike drop in pressure and optics elements have shut down again. nothing registered on BIAS, EZL, or EE.

 

 

Thursday, August 08, 2024, 16:11   a spark occurred at 43.3 kV

 

 Thursday, August 08, 2024, 16:23  this spark was audible at the test stand --- ie, not inside

 

 

 Thursday, August 08, 2024, 16:51  Saw no indication overall of the same HV sparking issues that we saw with the previous two targets. However, we were unable to generate beam  register any beam output on FC0, FC6, or wire scanners.  And we don't mean 'low signal'. Actually nothing at all.

 

Thursday, August 08, 2024, 16:54   Ramping down TGHT TBHT now

Friday, August 09, 2024, 08:05   turbo pumps off and spinning down in preparation to vent. will remove the inner foil from the target to observe if a change in shine from the target induces sparking as before. 

Friday, August 09, 2024, 08:58   turbo pumps no longer spinning. venting now.

Friday, August 09, 2024, 10:26    foil stripped off the target. there was a hole in the source for gas (febiad/mass marker). This hole is now plugged. reinstalled, roughing.

Friday, August 09, 2024, 11:59   vacuum at 1.2e-5T.  turning on water cooling lines.  no effect on vacuum.

Friday, August 09, 2024, 12:50 heating TGHT TBHT at 1A/30s

Friday, August 09, 2024, 13:47 increasing heating rate to 1.7A/10s, up to 580/230A

Friday, August 09, 2024, 14:42  TGHT TBHT at 550 230,  increasing BIAS to 30kV 

Friday, August 09, 2024, 15:03   BIAS at 30kV.  no sparks other than a single small one at 25kV. No beam detected at FC0, FC6, or wire scanners.

 Friday, August 09, 2024, 15:18 increased BIAS again. there was one spark at 35kV, then it was stable for 8 minutes with no sparks. still no signal on FC0.  This lack of signal is highly irregular, and should not be the case despite being an empty target. Will have to compare to the next target in the test stand. To attempt to correct, we have:

- manually adjusted gain

- reset bias

- flipped polarity back and forth

- confirmed FC in position

- confirmed no flagged power supply issue

- confirmed clear beam line to FC0

- confirmed upsteam optics are tuned appropriately

 

Friday, August 09, 2024, 15:23  cooling target and ramping down HV

 Friday, August 09, 2024, 16:06 TGHT TBHT at 0. turbo pumps off and spinning down.

 

 

  1019   Tuesday, August 13, 2024, 09:31 Dave Neilson      Problems/SolutionsTroubleshooting HV sparks and FC0 signal

Monday, August 12, 2024, 17:00   EOD. target installed, roughed, turbos on. No effect on vacuum from turning on water cooling lines. TGHT TBHT slowly brought to 230A/230A overnight. 

Tuesday, August 13, 2024, 09:28.  Vacuum at 9.9e-7T.  TGHT TBHT at 210/210. accelerating heating to 230/230. bringing up HV EZL EE to 30 / 2.5 / 13   kV

Tuesday, August 13, 2024, 09:51.  with EZL 13kV, EE 2.5kV. When increasing BIAS from 17.0 to 17.5kV.  Signal becomes detectable on FC0, at 7.75e-10A

Tuesday, August 13, 2024, 10:13  at BIAS 30kV. FC0 and wire scanners appear to be working correctly. FC0 reading 2.66e-8A 

Tuesday, August 13, 2024, 10:13  turning on all beam optics for FC6 mass scan.

 Tuesday, August 13, 2024, 10:31   mass scan procedure is doing a very poor job of recording the background noise. filename  2024-08-13_10-44 Ksalt mm 230-230

Tuesday, August 13, 2024, 10:46   increasing tght to 330

Tuesday, August 13, 2024, 10:59    FC0 at 2.1e-8A

Tuesday, August 13, 2024, 11:12  running mass scan at TGHT TBHT = 330/230 A.   filename 2024-08-13_11-21 Ksalt mm 330-230

Tuesday, August 13, 2024, 11:23 increasing TGHT to 430

Tuesday, August 13, 2024, 11:29  three sparks within 2 min at TGHT 378A.  (no sparks at all previous to this). TGHT ramp aborted. 

Tuesday, August 13, 2024, 11:36  resuming TGHT increase after 6 minutes of no sparks.  

Tuesday, August 13, 2024, 11:51  FC0 reading 1.6e-8.  FC0 signal fluctuating throughout test. rises during ramp and drops during static TGHT TBHT level.

Tuesday, August 13, 2024, 11:53  running mass scan at TGHT TBHT 430/230 A .  filename 2024-08-13_12-16 Ksalt mm 430-230 

Tuesday, August 13, 2024, 12:17  increasing TGHT to 530A.  

Tuesday, August 13, 2024, 12:31  FC0 at 3.03e-8 A

Tuesday, August 13, 2024, 12:31  beginning mass scan   -  filename   2024-08-13_13-02 Ksalt mm 530-230

Tuesday, August 13, 2024, 13:02 increasing TGHT to 580A 

Tuesday, August 13, 2024, 13:13   FC0 at 3.58e-8A.  beginning mass scan - filename  2024-08-13_13-35 Ksalt mm 580-230

Tuesday, August 13, 2024, 13:37    increasing bias to test sparking

Tuesday, August 13, 2024, 13:58   at 37kV, a number of optics elements prior to FC0 went down. no voltage or current spikes

Tuesday, August 13, 2024, 13:59  at 42.4kV, a couple sparks, seem to involve TGHT and BIAS. these dropped a few optics elements. when I brought them back up, they went down again, at a time with no voltage or current spikes.

Tuesday, August 13, 2024, 14:30 at 43.6kV, the sparking frequency became regular, with HV bias sparks occurring approximately every 5 minutes

Tuesday, August 13, 2024, 17:00 considerable time was spent until end of day manipulating the bias and the TGHT current level in an effort to discover the location of the regular sparking

increases in HV were found to increase the frequency of sparking, and eventually the HV increase was found to hit a threshold where the current would increase noticeably, with a stable voltage. this was accompanied by a buzzing coming from the feedthroughs on top of the cage. seemed to be coming from the TGHT(+) feedthrough. At no time did there appear to be sparking within the chamber of the test stand. In one instance, with HV just below the threshold of buzzing, increasing TGHT seemed to induce the buzzing state.

 

Wednesday, August 14, 2024, 11:16  ramping up bias to HV. intending to push HV today to find the source of these sparks and buzzing. initially, will be observing this with TGHT TBHT at 180/180 A

Wednesday, August 14, 2024, 11:47 at BIAS = 32.6kV (with EE 2.5 kV and EZL 13 kV), HV appears to be stable. Yesterday, we observed a fluctuating BIAS current which seemed to culminate in regular sparking activity (although this was at voltages of >40kV)

 Wednesday, August 14, 2024, 12:26 at bias = 38.8kV, there was a significant accompanying increase in BIAS current, but no evidence of sparking or buzzing

 Wednesday, August 14, 2024, 12:46  at BIAS = 49.2kV, the buzzing begins.  On the strip tool this is also seen as a large jump in current, with stable voltage

Wednesday, August 14, 2024, 12:49  dropping the bias by ~1kV stopped the buzzing. ramping up quickly again caused a spark and more buzzing.  increasing the voltage to attempt to locate the source.

 

 

Wednesday, August 14, 2024, 13:18   at bias of 49.2kV, buzzing began. dropping the bias stopped it. to attempt to locate the source, we increased the bias significantly. At 53kV, the bias power supply began to current limit. when this was increased, a spark caused the putty connection at the test stand to disconnect and two turbo pumps to trip off. once restored, another increase of the bias eventually caused a large spark when trying to locate the buzzing sound. Again, it seems to be at the feedthroughs of TGHT TBHT. My guess is TGHT+, but there is nothing visual to confirm it is coming from there. This buzzing state is also accompanied by a drop in EZL current to 0 and a large increase in EZL voltage readback.

 Wednesday, August 14, 2024, 15:05 dropped the HV and removed the cage to investigate any issues. we propose that this likely involves jumping to the einzel lens and are curious if raising the EZL voltage significantly would prevent this state from recurring. cage back on, raising HV

 

Resuming testing after TGHT TBHT power supply updates:

 

Friday, September 06, 2024, 12:09:   Ramped up TGHT and TBHT to ~170A at 1A/30s.  Increasing ramp rate to 1.7A/10s up to 580A/230A

 Friday, September 06, 2024, 14:11  slowly increasing BIAS, EE and EZL to 30kV, 2.5kV, 13kV

Friday, September 06, 2024, 15:53  appears that FC0 and wire scanners are working normally. However, there is a threshold reading problem with FC6. seems that a negative readout is present on FC6 if there is no substantial signal, and then nothing is recorded to the mass scans.

Friday, September 06, 2024, 15:54  increasing voltage to test high voltage sparking (BIAS AND EZL)

Friday, September 06, 2024, 16:23  after resetting the FC6 polarity and the FC6 bias, the background signal began showing up.

Tuesday, September 10, 2024, 12:19  Test stand vented, target removed.

Attachment 1: temp_8-13.PNG
temp_8-13.PNG
  1020   Friday, September 06, 2024, 12:08 Dave Neilson      DoneTest Stand repair/update

Friday, September 06, 2024:  New TSH:TGHT power supply has been installed and is now functional. Magna-Power TSD-900/208. The TSH:TBHT power supply has also been cleaned, and the COIL power supply replaced with a duplicate that should function identically.

 

  1024   Monday, October 07, 2024, 09:54 Aaron Schmidt       Pump down empty chamber / IG6 fix

 Monday, October 07, 2024, 09:54: Roughing. U-Line installed on HS waterline.

Monday, October 07, 2024, 10:34: Vent Chamber. TP6 & TP2 off.

  1025   Wednesday, October 09, 2024, 13:29 Dave Neilson    44691-8 45235-26  Retainer tests - with mass marker target

Wednesday, October 09, 2024, 11:28   Target loaded, remote power supply added for mass marker, negative channel on pin 5, positive channel on pin 7.

Wednesday, October 09, 2024, 11:50   roughing

 Wednesday, October 09, 2024, 12:51   Turbo pumps TP1A TP1B on

 Thursday, October 10, 2024, 09:27:   Water cooling turned on. no effect on vacuum (2.6e-6T)

Thursday, October 10, 2024, 09:45:   Increasing TGHT TBHT to 150/150A at 1A/30s

Thursday, October 10, 2024, 11:07    TGHT TBHT at 120/120A  .   increasing TGHT TBHT to 580/230 at 1A/10s 

Thursday, October 10, 2024, 12:29   during the current increase, when TBHT was at 230 and TGHT reached ~460, the TBHT current began decreasing. Upon inspection, the TBHT voltage is higher than normal and hitting its limit. It may be that there is another current path. that is, it may be shorted. 

as TGHT increases, TBHT voltage continues to increase.   TGHT voltage is similarly higher than usual, at 6V to deliver 500A.

on another note, the vacuum value has been increasing slowly throughout heating, possibly due to the presence of indium within the mass marker reservoir, or simply because this target has not been hot for some time. Leaving TGHT at 502A for the time being.

Thursday, October 10, 2024, 13:34    Increasing BIAS/EE/EZL to 30/2.5/13 kV. 

Thursday, October 10, 2024, 14:27  beginning mass scan - reservoir at 0 A. (reservoir contains solid Indium)    - mass scan res In 0A

 Thursday, October 10, 2024, 15:19   increased current through reservoir with magnet sitting at mass 115 - noticeable increase in Indium presence in beam beginning at ~2.5A. Brought res current to 3.0A, waited for FC6 current to plateau.- at 5e-10A

Thursday, October 10, 2024, 15:27   mass scan run again

Thursday, October 10, 2024, 15:57   res current decreased to 0A

Thursday, October 10, 2024, 15:57  dropping voltages to 0V 

Thursday, October 10, 2024, 16:12  voltages at 0, decreasing TGHT TBHT at 1A/30s 

  1027   Thursday, October 31, 2024, 13:53 Aaron Schmidt      In progressChamber empty & Fix IG6

 Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.


Monday, November 04, 2024, 11:40: Vent beamline. 

Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section.

Monday, November 04, 2024, 13:51: TMS:TP2 on. 

Monday, November 04, 2024, 13:57: TMS:TP6 on. TMS:IG6 on.


Tuesday, November 05, 2024, 15:00: Venting Chamber

Tuesday, November 05, 2024, 15:19: IG6 still displaying issues. Contacted Edi, 

Tuesday, November 05, 2024, 15:35: Controller replaced. Switch to Filament 2. IG6 on. Reading 3.73e-07T. 


Wednesday, November 13, 2024, 09:16: IG6 is tripped again. 

Wednesday, November 13, 2024, 09:17: Reset & switched back to Filament 2. There is no filament 1. Reading 3.91e-07T.

  1030   Tuesday, November 19, 2024, 14:25 Aaron Schmidt       Pump down empty chamber

 Tuesday, November 19, 2024, 14:25: Roughing

  1031   Thursday, November 28, 2024, 11:47 Isaiah Rabuka      In progressHeating Stage Pellet Testing and Development

Opened the ATTS, placed what I will call “Cast Alumina Sample #1” into the ATTS and activated the roughing then turbo pumps. Currently sample is in slow heating progress to 1000 degrees Celsius, process is expected to take some time, so I'll revisit after lunch.

 

  1032   Thursday, November 28, 2024, 13:47 Isaiah Rabuka        

 November 28, 2024 1:46PM

Checked in on sample in ATTS.

  1033   Tuesday, December 03, 2024, 14:55 Dave Neilson      DonePower supply changed to CATHODE mode (-)

Tuesday, December 03, 2024, 14:55  ANODE/CATHODE power supply switched to cathode mode, NEGATIVE

  1034   Tuesday, December 03, 2024, 15:49 Isaiah Rabuka        

  Tuesday, December 03, 2024, 15:48

Switched out pellets in ATTS, brought pressures down to ~10 uTorr, heated and cooled sample.

  1035   Wednesday, December 04, 2024, 15:43 Isaiah Rabuka        

  Wednesday, December 04, 2024, 15:42 Depressurized the ATTS

  1036   Thursday, December 05, 2024, 11:08 Aaron Schmidt      Problems/SolutionsSwap RP1 & Inspection (ITS Pumps)

 Thursday, December 05, 2024, 11:04: RP1 was struggling to pump down. RP SN: MY20055A02 removed. Tip seal replacement likely req'd.

Swapped with a new roughing pump SN: MY2340SA06 (Voltage set to 115V. Shipping locks loosened prior to install)

Ballast filter installed.

Thursday, December 05, 2024, 11:05: Roughing.

Thursday, December 05, 2024, 11:10: Vacuum pressure dropping optimally. Down below 1T already

Thursday, December 05, 2024, 11:47: TP & other RP ok. Note TP1A is getting louder on startup. Will likely need a change out in Q1 - 2025.


Additional source tray inspection:

Monday, December 16, 2024, 15:30: OK

Images attached.

Attachment 1: Media.jpg
Media.jpg
Attachment 2: Media_(2).jpg
Media_(2).jpg
Attachment 3: Media_(1).jpg
Media_(1).jpg
Attachment 4: Media_(3).jpg
Media_(3).jpg
Attachment 5: Media_(4).jpg
Media_(4).jpg
  1037   Thursday, December 05, 2024, 14:06 Isaiah Rabuka        

 Thursday, December 05, 2024, 14:05 Pressurized ATTS with argon, swapped out samples, and repressurized and heated chamber.

  1039   Friday, December 06, 2024, 16:03 Isaiah Rabuka        

  Friday, December 06, 2024, 16:03 Heated and cooled a sample in the ATTS 3x

  1040   Tuesday, December 10, 2024, 14:38 Isaiah Rabuka        

  Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.

 

  1041   Tuesday, December 17, 2024, 09:46 Dave Neilson     45235-26In progressSIS P2N source cup testing

Monday, December 16, 2024, 3:34   Target loaded in test stand. Confirmed correct connection to mass marker power supply through multipin. Bottom left pin (5 PS - ) connected to grounded side of the filament, top right pin (2, PS +) connected to top end of filament.

 

Tuesday, December 17, 2024, 09:30 Turbo pumps on

 

Tuesday, December 17, 2024, 16:21  water cooling on. No effect on vacuum. Vacuum stable at 1.18e-6T

Tuesday, December 17, 2024, 16:41   ramping TGHT TBHT at 1A/30s

 

Wednesday, December 18, 2024, 10:00  slowly increasing BIAS/EE/EZL to 30/2.5/13 kV

Wednesday, December 18, 2024, 11:40   BIAS EE EZL at 30 2.5 13 kV. 1 spark at 28kV, and there was a downward spike in the TGHT current when bias was at 28.5 kV  

Wednesday, December 18, 2024, 11:41   FC0 reading 1.6E-10 A. quite low for total beam, but this is likely due to this target being hot so many times.

Wednesday, December 18, 2024, 11:51 wire scans taken (RPM0)

Wednesday, December 18, 2024, 11:54 FC) extracted for mass scan - mass scan beginning now . Background record appears to be functioning well, although it is high. comparatively to old tests. It could be that those old tests were recording irregularly low background, given the temporary solution that was implemented.

Wednesday, December 18, 2024, 12:13   it seems that a spark took down many optics elements. Going to allow conditioning at 30kV for a while before restarting .     - optics elements down due to pressure sensor TMS:IG6 timing out. Vacuum group notified. Will likely bypass the interlock temporarily if it cannot be fixed fast. This should get a more permanent solution as it has failed a number of times before.

 Wednesday, December 18, 2024, 13:06    sparks are occurring on average approximately once every 10 minutes. they don't seem to be tripping of any supplies or optics (after IG6). but this spark frequency is significantly higher than observed on other targets lately.

Wednesday, December 18, 2024, 13:24   restarting Mass scan with IG6 interlock forced by.   scan name - 2024-12-18_13-47 SISP2N mmOFF.txt

Wednesday, December 18, 2024, 13:51   put FC0 back in, preparing to heat up mass marker.  will plan to ramp to 3A to match previous MM tests.     also, no sparks in the past 40 minutes, it appears they have subsided.    additionally, IG6 has been fixed by vacuum group

 Wednesday, December 18, 2024, 14:15   mass marker power supply is not connecting. When attempting to write to its IP address it times out. Had to drop the HV in order to investigate. Have enlisted controls group to aid as it appears to be connected and should be functional.  

Wednesday, December 18, 2024, 14:30   had to reset the computer connection to the network 192.168.5. by unplugging and plugging in the usb ethernet connection at computer. situation resolved.

Wednesday, December 18, 2024, 14:40   HV back up and now increasing the mass marker current from 0A to 3A, at 0A, FC0 current is 1.4e-10, very close to previously recorded FC0 mm0A value.

Wednesday, December 18, 2024, 14:56 with mm current at 3.0A, requiring 6V, FC0 current is 2.1e-10 A.   

Wednesday, December 18, 2024, 14:58  withdrawing FC0 to take mass scan

Wednesday, December 18, 2024, 15:25   mass scan complete:  filename 2024-12-18 15-23 SISP2N mmON.txt

Wednesday, December 18, 2024, 15:27   further increasing mm current to 4.0A.  FC0 current increasing noticeably. waiting for plateau. FC0 at 6.6e-10A.   wire scans taken

Wednesday, December 18, 2024, 15:39  new mass scan:  2024-12-18 15-53 SISP2N mmON 4A.txt

Wednesday, December 18, 2024, 15:52  mm power supply turned off. 0A.

Wednesday, December 18, 2024, 15:53  rescan of high mass region. still a residual indium mass peak present. will scan again after cooling more.

Wednesday, December 18, 2024, 16:10   mass scan captured that shows the indium peak almost masked in background 

 

Given that the indium peak for 3A was significantly lower than with a regular SIS source cup, i recommend that this target is heated up with the regular source cup again to compare.

 

 Wednesday, December 18, 2024, 16:11 dropping HV EE EZL to 0V

Wednesday, December 18, 2024, 16:13 cooling target to 0/0A at 1A/30s

 

 

 

 

 

 

 