Monday, April 15, 2024, 14:35, Aaron Schmidt, , , , , , , Problems/Solutions, TSH:EE Issues
|
Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However
it would slowly trickle downward. elog:1002.
|
Wednesday, July 24, 2024, 14:08, Dave Neilson, , , , , , , , Beam line window change - DUV installation
|
Wednesday, July 24, 2024, 14:07 Changed beamline window to DUV window (window at magnet for target source viewing) |
Tuesday, August 06, 2024, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TS Troubleshooting - Leak/HV spark issues
|
Due to HV sparking & possible water leaks on the previous TiC & Ta targets, checks are to be performed.
Chamber is empty. U-Line installed. All waterlines purged. FS#2, 3, 4, & 5 are closed.
Vacuum Group LD #2 - Connected to TP1B backing line |
Tuesday, August 13, 2024, 09:31, Dave Neilson, , , , , , , Problems/Solutions, Troubleshooting HV sparks and FC0 signal
|
Monday, August 12, 2024, 17:00 EOD. target installed, roughed, turbos on. No effect on vacuum from turning on water cooling lines. TGHT TBHT
slowly brought to 230A/230A overnight.
Tuesday, August 13, 2024, 09:28. Vacuum at 9.9e-7T. TGHT TBHT at 210/210. accelerating heating to 230/230. bringing up HV EZL |
Friday, September 06, 2024, 12:08, Dave Neilson, , , , , , , Done, Test Stand repair/update
|
Friday, September 06, 2024: New TSH:TGHT power supply has been installed and is now functional. Magna-Power TSD-900/208. The TSH:TBHT power supply
has also been cleaned, and the COIL power supply replaced with a duplicate that should function identically.
|
Monday, October 07, 2024, 09:54, Aaron Schmidt, , , , , , , , Pump down empty chamber / IG6 fix
|
Monday, October 07, 2024, 09:54: Roughing. U-Line installed on HS waterline.
Monday, October 07, 2024, 10:34: Vent Chamber. TP6 & TP2 off. |
Tuesday, October 29, 2024, 18:25, Aaron Schmidt, UC#46 (assembly only), LP-IG-LIS, ITW, TM4, , 42972-6 / 39956-1, In progress, Conditioning UC#46 Assembly
|
42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20: Roughing.
Tuesday, October 29, 2024, 18:52: TP1B on. |
Thursday, October 31, 2024, 13:53, Aaron Schmidt, , , , , , , In progress, Chamber empty & Fix IG6
|
Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.
Monday, November 04, 2024, 11:40: Vent beamline.
Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section. |
Tuesday, November 05, 2024, 16:40, Brady Borrmann, UC #24D (Assembly only), LP-IG-LIS, , , , 44972-5 / 42972-9, In progress, Conditioning UC#24D Assembly
|
42972-5 Base / 42972-9 Lid
Tuesday, November 05, 2024, 16:30: Roughing.
Tuesday, November 05, 2024, 17:04: TP1B on. |
Tuesday, November 19, 2024, 14:25, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Tuesday, November 19, 2024, 14:25: Roughing |
Thursday, November 28, 2024, 11:47, Isaiah Rabuka, , , , , , , In progress, Heating Stage Pellet Testing and Development
|
Opened the ATTS, placed what I will call “Cast Alumina Sample #1” into the ATTS and activated the roughing then turbo pumps. Currently sample
is in slow heating progress to 1000 degrees Celsius, process is expected to take some time, so I'll revisit after lunch.
|
Thursday, November 28, 2024, 13:47, Isaiah Rabuka, , , , , , , ,
|
November 28, 2024 1:46PM
Checked in on sample in ATTS. |
Tuesday, December 03, 2024, 14:55, Dave Neilson, , , , , , , Done, Power supply changed to CATHODE mode (-)
|
Tuesday, December 03, 2024, 14:55 ANODE/CATHODE power supply switched to cathode mode, NEGATIVE |
Tuesday, December 03, 2024, 15:49, Isaiah Rabuka, , , , , , , ,
|
Tuesday, December 03, 2024, 15:48
Switched out pellets in ATTS, brought pressures down to ~10 uTorr, heated and cooled sample. |
Wednesday, December 04, 2024, 15:43, Isaiah Rabuka, , , , , , , ,
|
Wednesday, December 04, 2024, 15:42 Depressurized the ATTS |
Thursday, December 05, 2024, 11:08, Aaron Schmidt, , , , , , , Problems/Solutions, Swap RP1 & Inspection (ITS Pumps)
|
Thursday, December 05, 2024, 11:04: RP1 was struggling to pump down. RP SN: MY20055A02 removed. Tip seal replacement likely req'd.
Swapped with a new roughing pump SN: MY2340SA06 (Voltage set to 115V. Shipping locks loosened prior to install)
Ballast filter installed. |
Thursday, December 05, 2024, 14:06, Isaiah Rabuka, , , , , , , ,
|
Thursday, December 05, 2024, 14:05 Pressurized ATTS with argon, swapped out samples, and repressurized and heated chamber. |
Friday, December 06, 2024, 16:03, Isaiah Rabuka, , , , , , , ,
|
Friday, December 06, 2024, 16:03 Heated and cooled a sample in the ATTS
3x |
Tuesday, December 10, 2024, 14:38, Isaiah Rabuka, , , , , , , ,
|
Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched
out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.
|
Tuesday, December 17, 2024, 09:46, Dave Neilson, , , , , , 45235-26, In progress, SIS P2N source cup testing
|
Monday, December 16, 2024, 3:34 Target loaded in test stand. Confirmed correct connection to mass marker power supply through multipin. Bottom
left pin (5 PS - ) connected to grounded side of the filament, top right pin (2, PS +) connected to top end of filament.
|
|