22
|
Thursday, October 13, 2011, 12:33 |
Rick Maharaj | Training | | | | | | | Test stand vented | test stand vented |
|
21
|
Wednesday, October 12, 2011, 13:14 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target removed |
|
|
20
|
Monday, October 03, 2011, 14:46 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target stored under vacuum |
|
|
19
|
Monday, October 03, 2011, 13:56 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Venting |
|
|
18
|
Monday, October 03, 2011, 10:53 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target is ready to be removed. | Turned off the HV and locked up the transformer.
Isolated the ion source box. The target is
under vacuum and the water is still on. |
|
17
|
Friday, September 30, 2011, 18:03 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Finished testing SiC#26 at the Test Stand | Today, did a did a mass scan: plotdump-local-clean.txt
Sep30 11 12-20-08.txt
Optimized a bit the tune with Friedhelm, |
|
16
|
Thursday, September 29, 2011, 09:27 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | In progress | Heaters conditioning | Started the heaters conditioning: TGHT
up to 580A and TBHT up to 230A. |
|
15
|
Wednesday, September 28, 2011, 16:33 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | In progress | HV conditioning | Started the HV conditioning: TSG:BIAS=30kV |
|
14
|
Wednesday, September 28, 2011, 14:11 |
Friedhelm Ames | SiC#26 | | ITE | TM4 | | | | gas system checked and pumped | The gas system has been checked. The variable
valve opens at about 7.55 very fast. Please
be careful when using it. Stepsize for opening |
|
13
|
Monday, September 26, 2011, 16:14 |
Anders Mjos | | | | | | | Problems/Solutions | Fixed leak on water line for HS, added Kapton insulation |
While testing SiC#26 a leak
was discovered on the water line to the heat
shield. The leak was in the right joint (see |
|
12
|
Monday, September 26, 2011, 14:56 |
John Wong | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray |
|
|
11
|
Friday, September 23, 2011, 16:42 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | In progress | Target ready to be heated | Friday, September 23, 2011, 16:4: Target
installed and roughing started.
Friday, September 23, 2011, 17:12: |
|
10
|
Friday, September 23, 2011, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray | Friday, September 23, 2011, 16:3: The connection
on the 9-pin connector for FEBIAD targets
showed burn marks from the previous FEBIAD |
|
9
|
Friday, September 23, 2011, 15:38 |
Rick Maharaj | | | | | | | | test stand vented | Test stand vented |
|
8
|
Tuesday, September 20, 2011, 19:00 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | Done | Finished testing TaC#1 | Tuesday, September 20, 2011:
Did another mass scan today at 5:40.
Saved as: plotdump-local-clean.txt Sept 20 |
|
7
|
Monday, September 19, 2011, 09:11 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | Started target and tube heaters. | Heaters conditioning went fine: 580A and
230A.
Did a mass scan: |
|
6
|
Friday, September 16, 2011, 12:39 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | HV conditioning | Started the HV conditioning: TSG:BIAS=30kV
and TSH:EE=-700V. |
|
5
|
Thursday, September 15, 2011, 13:46 |
Anders Mjos | FEBIAD Test | HP-FEBIAD | | | | | Failed | FEBIAD Broken Tube | See attached file for photos of the broken
tube |
|
4
|
Thursday, September 15, 2011, 09:20 |
Anders Mjos | | | | | | | | ISAC TestStand old e-log | link
to old e-log |
|
3
|
Wednesday, September 14, 2011, 15:40 |
Anders Mjos | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | TaC#1 installed and pumping down. | Wednesday, September 14, 2011, 15:39: Vacuum
at 1.3e-5 torr
Thursday, September 15, 2011, 08:59: |
|