  ID Datedown Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  64   Thursday, March 08, 2012, 17:39 Friedhelm Ames      Problems/SolutionsTPS:Q2 amd TMS:MB1 failedTPS:Q2 and TMS:MB1 failed during the scan.
-> restarted.
  
  63   Thursday, March 08, 2012, 17:16 Friedhelm AmesNb#6      mass scan started    
  62   Thursday, March 08, 2012, 14:08 Friedhelm AmesNb#6      heater ramped upheaters have reached final values TGHT
580 A, TBHT 230 A, some sparking during ramp
up. see strip tool image attached
 grab.Z27253.png 
  61   Thursday, March 08, 2012, 09:14 Friedhelm AmesNb#6      continue target heatingcontinue target heating up to 580 A. Strip
tool for the heating up to 300A from yesyerday
see below
 grab.K26109.png 
  60   Wednesday, March 07, 2012, 17:44 Friedhelm AmesNb#6      ramping up heatersramping up heaters has been started by
ISAC ops.
  
  59   Wednesday, March 07, 2012, 13:48 Friedhelm AmesNb#6      high voltage conditioningHigh voltage conditioning has been started
by ISAC ops. Einzel lens is unstable below
5 kV., o.k. above this.
  
  58   Wednesday, March 07, 2012, 10:36 Paul Mocock       HV conditioning begins.HV conditioning has begins. Vacuum chamber
pressure is currently 3.2e-07 Torr on TSG:IG1.
  
  57   Wednesday, March 07, 2012, 09:27 Friedhelm AmesNb#6     Donewater cooling startedwater cooling line valves opened. No response
on vacuum TSG:IG1 3.5e-7 T
  
  56   Tuesday, March 06, 2012, 15:51 Friedhelm Ames       turbopumps in mass separator section started    
  55   Tuesday, March 06, 2012, 15:25 Pierre Bricault       ISAC test standTurbos at full speed. P = 1.5E-05 T   
  54   Tuesday, March 06, 2012, 15:17 Pierre Bricault       ISAC test standStart turbo pumps at 1514H   
  53   Tuesday, March 06, 2012, 15:15 Pierre Bricault HP-SIS     ISAC test stand two turbos replacedVac group has replaced the two turbo pumps.   
  52   Monday, March 05, 2012, 19:31 Friedhelm Ames      Failedturbo pumps failedBoth turbo pumps at the source box cannot
be started. A fault report has been issued.
  
  51   Monday, March 05, 2012, 14:41 Friedhelm Ames       vacuum and optics switched offvacuum and optics at teststand switched
off to allow work on the water cooling system.
  
  50   Friday, March 02, 2012, 13:28 Anders MjosFEBIAD test      Venting test standVenting for target exchange   
  49   Friday, March 02, 2012, 08:53 Anders MjosFEBIAD test     Problems/SolutionsTube heater insulator glowing   The insulator for the tube
heater was observed to be glowing with a
blue shine when the target was on high voltage.
 glowing_insulator.jpg 
  48   Thursday, March 01, 2012, 17:10 Friedhelm Ames       start ramping down of heaters    
  47   Thursday, March 01, 2012, 17:09 Friedhelm Ames       new mass scan


   
        
            
  
  46   Thursday, March 01, 2012, 17:05 Friedhelm Ames       start heater ramping down    
  45   Thursday, March 01, 2012, 17:04 Friedhelm Ames       new mass scanbigger mass scan after separator optimization
and with finer step size
 
 grab.S19441.png 