913
|
Monday, March 21, 2022, 13:59 |
Carla Babcock | | | | | | | | 3rd mass marker test | 3rd version of the mass marker target has
been installed. This one is further back
on the heat shield, and has a longer ceramic |
|
|
914
|
Monday, April 04, 2022, 20:44 |
Carla Babcock | | | | | | | | Change from 9-pin connectors to 5-pin connectors | Swapped the old 9pin connectors out and
replaced with 2 5-pin connectors, same as
on the modules. |
|
|
915
|
Monday, April 04, 2022, 20:56 |
Carla Babcock | | | | | | | | wiring reverted for cathode-bias FEBIAD | Wiring which was changed to run the mass
marker tests has been reverted:
anode bias cable connected |
|
|
917
|
Thursday, April 07, 2022, 11:19 |
Aaron Schmidt | Test FEBIAD TM2-2022 | | ITW | TM2 | | 42752-5 | | Test FEBAID & TS operation | Gas system switched on manually to
use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25: |
|
|
918
|
Monday, April 11, 2022, 14:52 |
Aaron Schmidt | | | | | | | Problems/Solutions | TP6 controller | Monday, April 11, 2022, 13:58: Controller
for TP6 is dead. Literally smokes if you
try to use it. |
|
|
919
|
Wednesday, April 13, 2022, 07:46 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak | Wednesday, April 13, 2022, 07:38: Appears
to have a water leak. Vacuum @ 8.48e-06T.
All power / sources shut off. (Had already |
|
|
920
|
Wednesday, April 20, 2022, 13:42 |
Aaron Schmidt | | | | | | | | Vent Beamline half | Aurelia to do a visual test later.
Wednesday, April 20, 2022, 13:41:
IG6 Off. TP6 & TP2 off. |
|
|
921
|
Thursday, April 21, 2022, 13:38 |
Aaron Schmidt | | | | | | | Problems/Solutions | Leak checks | https://elog.triumf.ca/TIS/Test-Stand/919
Vacuum Group LD#1
(A) Top feed through fittings upgraded |
|
|
929
|
Friday, May 27, 2022, 07:19 |
Fernando Maldonado | | | | | | | Done | FEBIAD parameter scan web-app and brief description (with links) | A web-app for systematic FEBIAD parametrizations
has been develop and now includes the
ISAC Test Stand (ITS) : |
|
|
930
|
Tuesday, May 31, 2022, 13:35 |
Aaron Schmidt | UCx HS | | ITW | TM2 | | 44378-19 | In progress | Conditioning UC#38 assembly | Using a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B |
|
|
933
|
Monday, June 20, 2022, 11:49 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Monday, June 20, 2022, 11:49: Water line
loop installed. Roughing.
Thursday, June 23, 2022, |
|
|
935
|
Thursday, June 30, 2022, 13:50 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Thursday, June 30, 2022, 13:46: Roughing.
Thursday, July 07, 2022,
15:00: Venting. |
|
|
937
|
Sunday, July 10, 2022, 22:19 |
Aaron Schmidt | | | | | | | Problems/Solutions | TP2 Trip / TMS:RP2 issue | Sunday, July 10, 2022, 22:19: A trip
was noted on TP2. the backing pressure is
quite high. Shutting off the turbo pumps |
|
|
938
|
Monday, July 11, 2022, 09:17 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber | Monday, July 11, 2022, 09:15: Roughing. |
|
|
939
|
Tuesday, August 30, 2022, 13:58 |
Aaron Schmidt | | | | | 44062-7 | 44378-25 | In progress | Conditioning UC#40 assembly | Conditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only). |
|
|
941
|
Thursday, September 29, 2022, 13:50 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber | Water loop installed.
Thursday, September 29, 2022, 13:50:
Roughing |
|
|
943
|
Wednesday, October 19, 2022, 12:16 |
Aaron Schmidt | | | | | | | | Test Stand controls changed | genepicsas.triumf.ca
x11 enabled.
Then use login credentials. |
|
|
945
|
Tuesday, November 15, 2022, 15:32 |
Sam Gupta | | | | | | | | ATTS tantalum Bracket Heating test | Heated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature |
|
|
946
|
Wednesday, November 16, 2022, 13:28 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:TP1A Replaced | See elog 944
Wednesday, November 16, 2022, 13:23:
TP1 A replaced |
|
|
947
|
Wednesday, November 23, 2022, 13:52 |
Aaron Schmidt | | | | | | 44378-14 | In progress | FEBIAD Coil Tests | Sam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51 |
|