304
|
Tuesday, May 21, 2013, 19:38 |
Friedhelm Ames | | | | | | | Problems/Solutions | magnet power supply water leak | The cyclotron operators discovered a water
leak in the magnet power supply. The water
is valved off and the power is off. A fault |
|
59
|
Wednesday, March 07, 2012, 13:48 |
Friedhelm Ames | Nb#6 | | | | | | | high voltage conditioning | High voltage conditioning has been started
by ISAC ops. Einzel lens is unstable below
5 kV., o.k. above this. |
|
262
|
Monday, January 07, 2013, 14:52 |
Sebastian Raeder | RFQ empty | | | | | | | heating target | heating target for RFQ tests. Now the wiring
is insulated with alumina beats and tubing
and the target has the standard Ta alkali |
|
267
|
Monday, January 14, 2013, 13:51 |
Sebastian Raeder | RFQ empty | | | | | | In progress | heating | Started heating the target, now Silica
sleevings are installed for wire insulation
and the gap target -- repeller is now 0.6mm |
|
272
|
Thursday, January 17, 2013, 08:16 |
Sebastian Raeder | RFQ empty | | | | | | In progress | heating | Thursday, January 17, 2013, 08:16: started
heating of the target, vacuum at 2.6E-7T
Thursday, January 17, 2013, |
|
276
|
Friday, January 18, 2013, 16:17 |
Anders Mjos | RFQ empty | | | | | | In progress | heating |
|
|
69
|
Friday, March 09, 2012, 17:25 |
Friedhelm Ames | | | | | | | | heaters and HV power supplies off | heaters and HV power supplies have been
switched off
IG1 5.1e-9 T. |
|
203
|
Thursday, September 13, 2012, 13:05 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | | heater ramping up started | |
|
68
|
Friday, March 09, 2012, 13:30 |
Friedhelm Ames | NB#6 | | | | | | | heater ramping down | Fc0 23 nA
IG1 9.9e-7 T
start automatic heater ramping down |
|
62
|
Thursday, March 08, 2012, 14:08 |
Friedhelm Ames | Nb#6 | | | | | | | heater ramped up | heaters have reached final values TGHT
580 A, TBHT 230 A, some sparking during ramp
up. see strip tool image attached |
|
14
|
Wednesday, September 28, 2011, 14:11 |
Friedhelm Ames | SiC#26 | | ITE | TM4 | | | | gas system checked and pumped | The gas system has been checked. The variable
valve opens at about 7.55 very fast. Please
be careful when using it. Stepsize for opening |
|
44
|
Wednesday, February 29, 2012, 17:26 |
Friedhelm Ames | | | | | | | | gas inlet valves closed | |
|
220
|
Wednesday, October 10, 2012, 10:47 |
Friedhelm Ames | | | | | | | Failed | found teststand tripped off | turbo pumps in source section and all ion
gauges off all optics and heaters tripped.
Reason unknown. |
|
221
|
Wednesday, October 10, 2012, 17:35 |
Aurelia Laxdal | | | | | | | Failed | found teststand tripped off |
|
|
130
|
Thursday, July 05, 2012, 18:02 |
Friedhelm Ames | | | | | | | Problems/Solutions | fluctuations in magnet current | The current at the magnet power supply
TMS:MB1 shows fluctuations every 1-2 minutes.
The same can be seen in the Hall probe read |
|
131
|
Thursday, July 05, 2012, 18:10 |
Friedhelm Ames | | | | | | | Problems/Solutions | fluctuations in magnet current |
|
|
160
|
Friday, August 10, 2012, 15:29 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | | finishing the gas installation and its pump | 1524H Start small pump.
1529H stop the pump.
|
|
199
|
Tuesday, September 11, 2012, 19:48 |
Friedhelm Ames | NB#7 | HP-SIS | | | | | Done | cool down finished, all source power supplies off. | |
|
61
|
Thursday, March 08, 2012, 09:14 |
Friedhelm Ames | Nb#6 | | | | | | | continue target heating | continue target heating up to 580 A. Strip
tool for the heating up to 300A from yesyerday
see below |
|
42
|
Wednesday, February 29, 2012, 15:08 |
Friedhelm Ames | | | | | | | | connected Al(CH3)3 | connected A(CH3)3 instead of He, pumped
line and valve with pump on the high voltage
rack.. Opened regulating valve first response |
|