Entry  Tuesday, May 21, 2013, 19:38, Friedhelm Ames, , , , , , , Problems/Solutions, magnet power supply water leak 
The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued
to the power supplies group.
Entry  Wednesday, March 07, 2012, 13:48, Friedhelm Ames, Nb#6, , , , , , , high voltage conditioning 
High voltage conditioning has been started by ISAC ops. Einzel lens is unstable below 5 kV., o.k. above this.
Entry  Monday, January 07, 2013, 14:52, Sebastian Raeder, RFQ empty, , , , , , , heating target RFQ_with_signal_total.PNGRFQ_with_signal.PNG
heating target for RFQ tests. Now the wiring is insulated with alumina beats and tubing and the target has the standard Ta alkali element mixture
 
Unfortunately I deleted some entries, so here a short summary in combination with a screenshot of the striptool
Entry  Monday, January 14, 2013, 13:51, Sebastian Raeder, RFQ empty, , , , , , In progress, heating 
Started heating the target, now Silica sleevings are installed for wire insulation and the gap target -- repeller is now 0.6mm (was 0.25mm)
Entry  Thursday, January 17, 2013, 08:16, Sebastian Raeder, RFQ empty, , , , , , In progress, heating 
Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T
 Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T
Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down
    Reply  Friday, January 18, 2013, 16:17, Anders Mjos, RFQ empty, , , , , , In progress, heating Test_Stand_cooling_temp_data_2013-01-16.pdfTest_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG
 

    
        
            Sebastian Raeder wrote:
        
        
            
Entry  Friday, March 09, 2012, 17:25, Friedhelm Ames, , , , , , , , heaters and HV power supplies off 
heaters and HV power supplies have been switched off
IG1 5.1e-9 T.
Entry  Thursday, September 13, 2012, 13:05, Friedhelm Ames, Nb#7, LP-SIS, , , , , , heater ramping up started 
 
Entry  Friday, March 09, 2012, 13:30, Friedhelm Ames, NB#6, , , , , , , heater ramping down 
Fc0 23 nA
IG1 9.9e-7 T
start automatic heater ramping down
Entry  Thursday, March 08, 2012, 14:08, Friedhelm Ames, Nb#6, , , , , , , heater ramped up grab.Z27253.png
heaters have reached final values TGHT 580 A, TBHT 230 A, some sparking during ramp up. see strip tool image attached
Entry  Wednesday, September 28, 2011, 14:11, Friedhelm Ames, SiC#26, , ITE, TM4, , , , gas system checked and pumped 
The gas system has been checked. The variable valve opens at about 7.55 very fast. Please be careful when using it. Stepsize for opening around this
value should be 0.01. Gas lines have been pumped with pump in the high voltage rack. Ne leak was opened to release pressure.
Entry  Wednesday, February 29, 2012, 17:26, Friedhelm Ames, , , , , , , , gas inlet valves closed 
 
Entry  Wednesday, October 10, 2012, 10:47, Friedhelm Ames, , , , , , , Failed, found teststand tripped off 
turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.
    Reply  Wednesday, October 10, 2012, 17:35, Aurelia Laxdal, , , , , , , Failed, found teststand tripped off 


    
        
            Friedhelm Ames wrote:
        
        
            
            turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.
Entry  Thursday, July 05, 2012, 18:02, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current TMSMB1_2012_07_05.PNG
The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall probe read back and in the beam
current at Fc6.
    Reply  Thursday, July 05, 2012, 18:10, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current 


    
        
            Friedhelm Ames wrote:
        
        
            
            The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall
Entry  Friday, August 10, 2012, 15:29, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, , finishing the gas installation and its pump 
1524H Start small pump.
1529H stop the pump.
 
Entry  Tuesday, September 11, 2012, 19:48, Friedhelm Ames, NB#7, HP-SIS, , , , , Done, cool down finished, all source power supplies off. 
 
Entry  Thursday, March 08, 2012, 09:14, Friedhelm Ames, Nb#6, , , , , , , continue target heating grab.K26109.png
continue target heating up to 580 A. Strip tool for the heating up to 300A from yesyerday see below
Entry  Wednesday, February 29, 2012, 15:08, Friedhelm Ames, , , , , , , , connected Al(CH3)3 
connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve
set point at 7.0.