  Test-Stand, Page 48 of 49  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Tuesday, February 28, 2012, 16:32, Brandon Humphries, , , , , , , , Initial settings for FEBIAD on Test Stand grab.V13332.pnggrab.m13336.png
Entry  Tuesday, February 28, 2012, 11:04, Pierre Bricault, , , , , , , ,  
Entry  Tuesday, February 28, 2012, 10:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Test FEBIAD at ISAC test statnd 
Entry  Monday, February 27, 2012, 17:39, Friedhelm Ames, , , , , , , In progress, target and tube heaters ramped up 
Entry  Friday, February 17, 2012, 10:27, Aurelia Laxdal, , , , , , , Done, Started the Archivers 
Entry  Thursday, February 16, 2012, 15:59, Anders Mjos, , , , , , , Problems/Solutions, He and Ne installed and gas lines leak checked 
Entry  Wednesday, February 08, 2012, 17:39, Friedhelm Ames, , , , , , , Failed, TSG:TP1B failure 
    Reply  Wednesday, February 08, 2012, 18:16, Friedhelm Ames, , , , , , , Failed, TSG:TP1B and TSG:TP1A failure  
Entry  Tuesday, January 24, 2012, 09:44, Friedhelm Ames, , , , , , , , turbo pumps restarted 
Entry  Friday, January 20, 2012, 10:37, Friedhelm Ames, , , , , , , , vacuum pumps shut off 
Entry  Monday, October 17, 2011, 10:22, Anders Mjos, FEBIAD, , , , , , Problems/Solutions, Variable leak valve replaced F3-649.PDF
    Reply  Monday, November 14, 2011, 15:40, Anders Mjos, , , , , , , Problems/Solutions, Variable leak valve repaired F3-VCR-43_Repair_F3-592.PDF
       Reply  Tuesday, December 20, 2011, 16:09, Anders Mjos, , , , , , , Problems/Solutions, Variable leak valve repaired 
Entry  Monday, December 19, 2011, 13:09, Aurelia Laxdal, , , , , , , , Test Stand updates 
Entry  Tuesday, December 13, 2011, 14:10, Aurelia Laxdal, , , , , , , , Test Stand IOC reboot 
Entry  Thursday, October 13, 2011, 12:33, Rick Maharaj, Training , , , , , , , Test stand vented 
    Reply  Thursday, October 13, 2011, 15:42, Anders Mjos, Training , HP-FEBIAD, , , , , Problems/Solutions, Target ready to be heated 
Entry  Monday, October 03, 2011, 10:53, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target is ready to be removed.  
    Reply  Monday, October 03, 2011, 13:56, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Venting 
       Reply  Monday, October 03, 2011, 14:46, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target stored under vacuum 
          Reply  Wednesday, October 12, 2011, 13:14, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target removed 
Entry  Friday, September 30, 2011, 18:03, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Finished testing SiC#26 at the Test Stand 
Entry  Thursday, September 29, 2011, 09:27, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, Heaters conditioning 
Entry  Wednesday, September 28, 2011, 16:33, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, HV conditioning 
Entry  Wednesday, September 28, 2011, 14:11, Friedhelm Ames, SiC#26, , ITE, TM4, , , , gas system checked and pumped 
Entry  Monday, September 26, 2011, 16:14, Anders Mjos, , , , , , , Problems/Solutions, Fixed leak on water line for HS, added Kapton insulation Water_Leak.pdfKapton.pdf
Entry  Friday, September 23, 2011, 16:40, Anders Mjos, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray 
    Reply  Monday, September 26, 2011, 14:56, John Wong, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray 9-pin-connector.jpg