  830   Friday, December 11, 2020, 15:02 Carla Babcock, Sam McEwen, Aaron Schmidt       Modifications to test stand for TM3 testsTest piece installed with Sam, Aaron and
Alexander. Ended up shimming the support
stand (middle foot) since it seemed to be
 20201211_140703.jpg20201211_140639.jpg20201211_140605.jpg 
  831   Monday, December 14, 2020, 11:50 Alexander Shkuratoff      In progressTM3 service tray prototype HV testsMonday, December 14, 2020, 11:30
Switched off all breakers in HV cage.
Started HV testing of TM3 prototype.
  
  832   Tuesday, December 15, 2020, 11:24 Alexander Shkuratoff       TM3 service tray prototype HV testsTuesday, December 15, 2020, 11:15
Vacuum at 1.0e-6 Torr. Turned bias
power supply on, starting HV ramp at 500
  
  833   Wednesday, December 16, 2020, 10:32 Carla Babcock, Alexander Shkuratoff       TM3 service tray prototype HV testsWednesday, December 16, 2020, 10:30 (Carla)
:
Started ramping up about 45 mins
  
  834   Thursday, December 17, 2020, 08:16 Carla Babcock, Alexander Shkuratoff        Ramping up to 75kV. Started drawing current
at 63.5kV this time.
Now at 75kV, drawing 5uA of current.
  
  835   Monday, December 21, 2020, 07:58 Aaron Schmidt       Shutdown TS Shutting down the ISAC TS for the planned
outage on Dec 22.
Monday, December 21, 2020, 07:50:
  
  836   Monday, January 04, 2021, 08:17 Aaron Schmidt       Restart TSRestarting TS after holidays & planned
power outage.
Monday, January 04, 2021, 08:17:
  
  837   Monday, January 11, 2021, 14:20 Carla Babcock       Test stand wiring reverted to anode bias modeI have rewired the test stand (service
cap wiring only, not power supply wiring)
to anode bias mode as shown in the diagram.
  
  838   Thursday, January 14, 2021, 08:31 Fernando Maldonado      In progressGas delivery system upgrade

    

       
            
 new-gauge.png 
  839   Wednesday, January 20, 2021, 11:30 Fernando Maldonado      DoneCathode bias mode configuration confirmed

    

       
            
  
  840   Thursday, January 21, 2021, 10:10 Fernando Maldonado LP-SIS  44139-1044378-2DoneEnergy spread calibration - SIS with TBHT negatively biased Thursday, January 21, 2021, 10:05:
Anodeless Negative Bias On Surface Ion 
Source, or ANBOSIS (still working on the
  
  841   Thursday, January 21, 2021, 10:55 Fernando Maldonado      DoneUpdated Good Vac value for TSG:IG1On Tuesday the hard good vacuum level was
changed from 7e-6 T to 1e-5 T
to allow larger leak rates when testing FEBIAD.
  
  842   Friday, January 29, 2021, 09:13 Aaron Schmidt LP-SIS  44139-1044378-2In progressTS settings ok.Friday, January 29, 2021, 09:11: CANBUS
controller was replaced. Quick systems check
ok. Sources, HV, & Optics all good.
  
  843   Monday, February 01, 2021, 08:38 Fernando Maldonado LP-SIS  44139-10 44378-2 FailedEnergy spread calibrationMonday, February 01, 2021, 08:38 : The
anode seems to be shorted but we can still
test the  amount of dispersion at the
 ESC_-_Jan_29_start.docxESC_-__Feb_3_start.docxER-580-230-30kV-m7.txtEr-580-230-30kV-m133.txt 
  844   Thursday, February 04, 2021, 18:48 Fernando Maldonado LP-SIS  44139-10 44378-2 Problems/SolutionsEnergy spread calibration with SISThe system was vented to  make clearance
on the waterlines as a very small continuous
discharge was observed.
 6x 
  845   Thursday, February 04, 2021, 19:22 Fernando Maldonado LP-SIS   44139-10 44378-2DoneEnergy spread calibration with SISSee e-log entry: 884:
Thursday, February 04, 2021, 18:45:
Roughing
 ESC_-_Feb_5_Start.docx 
  846   Monday, February 08, 2021, 09:20 Aaron Schmidt LP-SIS  44139-1044378-2FailedEnergy spread calibration with SIS. No PERe-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17:
Roughing.
 ESC_-_Feb_8_Start.docx 
  847   Tuesday, February 09, 2021, 14:02 Aaron Schmidt      Problems/SolutionsDI water lossTuesday, February 09, 2021, 13:43: DI water
flow completely stopped.
Control room contacted. DI water
  
  848   Wednesday, February 10, 2021, 09:49 Aaron Schmidt LP-SIS  44691-844378-2 / 44378-3FailedEnergy spread calibration with SISNote* target has a ring on the TGHT - Right
leg. EE & PE placed. Target to HS OL
- OK.
 spark_inside_chamber_roof.pngspark_inside_chamber_front_view.png 
  849   Friday, February 12, 2021, 12:16 Fernando Maldonado      Problems/SolutionsGrounding collimator cable from outside Friday, February 12, 2021, 12:13:
Since the collimator is not used, Carla and
I installed a BNC short outside the cage.
 20210212_121227.jpg 