  ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  730   Monday, June 10, 2019, 14:35 Aaron Schmidt      DoneOptics Tray / EZL inspection.Monday, June 10, 2019, 13:00: Optics Tray
removed.
Megger'd @ 1000V on EZL and Collimator.
 20190610_135100.jpg20190610_135926.jpg20190610_135045.jpg20190610_135517.jpg 
  731   Tuesday, June 11, 2019, 14:33 Aaron SchmidtTest FEBIADLP-FEBIAD  395530-342752-5In progressISAC Source tray re-installed w/ optics tray.Tuesday, June 11, 2019, 14:33: Roughing.

Wednesday, June 12, 2019,
08:18: Venting to install FEBIAD.
  
  732   Thursday, June 13, 2019, 14:05 Aaron Schmidt      DoneSpare TGHT PS installed.Thursday, June 13, 2019, 14:04: Spare TGHT
PS installed /  tested. The old one
is to be sent out for repair.
  
  734   Friday, June 21, 2019, 15:12 Aaron SchmidtP2N - 1      P2N - 1 - 2019Friday, June 21, 2019, 14:48: Roughing.
Friday, June 21, 2019, 15:18: Turbo
pumps on.
  
  738   Wednesday, June 26, 2019, 11:34 Aaron SchmidtTest TaHP-SIS TM4No Target oven #42972-4In progressTest target for TM4 checksThe HP-SIS uses the older center block.
No serial number found. 
Loaded with Tantalum. Rough Target
  
  742   Thursday, July 04, 2019, 15:15 Aaron SchmidtP2N - 1      P2N - 1 - 2 - 2019Screws instead of rivets on target leg.
Insulator changed.
Thursday, July 04, 2019, 15:14: Roughing
  
  743   Thursday, July 04, 2019, 15:16 Aaron Schmidt      Problems/SolutionsTBHT insulator changedThursday, July 04, 2019, 15:00: TBHT insulator
was swapped out on the source tray side. 
  
  750   Friday, August 02, 2019, 13:16 Aaron SchmidtP2N - 1     In progressp2n heating test 4Friday, August 02, 2019: p2n target installed
in the test stand, the ion source was fully
removed to avoid any risk of shorting. The
  
  753   Thursday, August 08, 2019, 09:12 Aaron Schmidt LP-FEBIAD   42752-7In progressP2N Setup - LP-FEBIAD targetInserted a used (heating) LP-FEBIAD target
with a basic heat shield assembly with no
end plate foil on the window side to observe
 8x 
  754   Tuesday, August 13, 2019, 12:03 Aaron Schmidt      Problems/SolutionsReplace RP1Tuesday, August 13, 2019, 11:55: Close
PV1. Turn off RP1.
Tuesday, August 13, 2019, 12:02:
 vac.PNGcurr.PNG 
  758   Monday, September 23, 2019, 13:30 Aaron SchmidtTa#59LP-SISITETM244062-542752-10In progressConditioning Ta#59 AssyMonday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38:
Closed BV1A / Opened BV1 A & B to open
 9x 
  759   Thursday, September 26, 2019, 11:30 Aaron Schmidt      Problems/SolutionsReplace CANBUS board TSG:CB1Thursday, September 26, 2019, 11:28: The
control board to TSG:CB1 was removed and
replaced.  
  
  760   Friday, September 27, 2019, 11:54 Aaron Schmidt LP-SIS  41790-943515-6 Conditioning UC#(29) HSUsing broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53:
Roughing.
  
  761   Wednesday, October 02, 2019, 13:42 Aaron Schmidt LP-SIS  41790-943515-9In progressConditioning UC#(30) HSWednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13:
Turbo Pumps started.
 UC#30.docx 
  762   Friday, October 18, 2019, 15:01 Aaron SchmidtSiC#38HP-FEBIADITETM242464-442752-1In progressConditioning SiC#38 HP-FEBIADFriday, October 18, 2019, 14:58: Roughing.
Friday, October 18, 2019, 15:30:
Turbo pumps on.
 12x 
  763   Wednesday, October 23, 2019, 09:51 Aaron Schmidt      Problems/SolutionsWater leak in Magnet PSWednesday, October 23, 2019, 09:50:
Fault: 12797 
WP: C2019-10-23-2
  
  770   Friday, November 08, 2019, 14:21 Aaron Schmidt LP-SIS  41790-943515-9In progressNitrogen Bottle leak testFriday, November 01, 2019, 14:00: Nitrogen
bottle installed. Purged waterlines HS /
FS#5. Purge done in conjunction with SiC#38
  
  771   Friday, November 15, 2019, 10:35 Aaron Schmidt       Pump down empty ChamberFriday, November 15, 2019, 09:35: Roughing.
Friday, November 15, 2019, 10:34:
Turbo pumps on.
  
  775   Friday, December 20, 2019, 07:59 Aaron Schmidt       Holiday TS shut downFriday, December 20, 2019, 07:58: Turn
off ion gauges. Shut off turbo pumps TP6,
TP2, TP1A, & TP1B. Close backing valves.
  
  777   Tuesday, January 21, 2020, 09:38 Aaron SchmidtSiC#40LP-SIS  43044-843515-8In progressConditioning SiC#40 HSWas intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34:
 SiC#40.docxSiC#40_-_HS_Out_gassing.docxTS-2020-01-21-11-10.rga 