730
|
Monday, June 10, 2019, 14:35 |
Aaron Schmidt | | | | | | | Done | Optics Tray / EZL inspection. | Monday, June 10, 2019, 13:00: Optics Tray
removed.
Megger'd @ 1000V on EZL and Collimator. |
|
|
731
|
Tuesday, June 11, 2019, 14:33 |
Aaron Schmidt | Test FEBIAD | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | ISAC Source tray re-installed w/ optics tray. | Tuesday, June 11, 2019, 14:33: Roughing.
Wednesday, June 12, 2019,
08:18: Venting to install FEBIAD. |
|
|
732
|
Thursday, June 13, 2019, 14:05 |
Aaron Schmidt | | | | | | | Done | Spare TGHT PS installed. | Thursday, June 13, 2019, 14:04: Spare TGHT
PS installed / tested. The old one
is to be sent out for repair. |
|
|
734
|
Friday, June 21, 2019, 15:12 |
Aaron Schmidt | P2N - 1 | | | | | | | P2N - 1 - 2019 | Friday, June 21, 2019, 14:48: Roughing.
Friday, June 21, 2019, 15:18: Turbo
pumps on. |
|
|
738
|
Wednesday, June 26, 2019, 11:34 |
Aaron Schmidt | Test Ta | HP-SIS | | TM4 | No Target oven # | 42972-4 | In progress | Test target for TM4 checks | The HP-SIS uses the older center block.
No serial number found.
Loaded with Tantalum. Rough Target |
|
|
742
|
Thursday, July 04, 2019, 15:15 |
Aaron Schmidt | P2N - 1 | | | | | | | P2N - 1 - 2 - 2019 | Screws instead of rivets on target leg.
Insulator changed.
Thursday, July 04, 2019, 15:14: Roughing |
|
|
743
|
Thursday, July 04, 2019, 15:16 |
Aaron Schmidt | | | | | | | Problems/Solutions | TBHT insulator changed | Thursday, July 04, 2019, 15:00: TBHT insulator
was swapped out on the source tray side.
|
|
|
750
|
Friday, August 02, 2019, 13:16 |
Aaron Schmidt | P2N - 1 | | | | | | In progress | p2n heating test 4 | Friday, August 02, 2019: p2n target installed
in the test stand, the ion source was fully
removed to avoid any risk of shorting. The |
|
|
753
|
Thursday, August 08, 2019, 09:12 |
Aaron Schmidt | | LP-FEBIAD | | | | 42752-7 | In progress | P2N Setup - LP-FEBIAD target | Inserted a used (heating) LP-FEBIAD target
with a basic heat shield assembly with no
end plate foil on the window side to observe |
8x |
|
754
|
Tuesday, August 13, 2019, 12:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace RP1 | Tuesday, August 13, 2019, 11:55: Close
PV1. Turn off RP1.
Tuesday, August 13, 2019, 12:02: |
|
|
758
|
Monday, September 23, 2019, 13:30 |
Aaron Schmidt | Ta#59 | LP-SIS | ITE | TM2 | 44062-5 | 42752-10 | In progress | Conditioning Ta#59 Assy | Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38:
Closed BV1A / Opened BV1 A & B to open |
9x |
|
759
|
Thursday, September 26, 2019, 11:30 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace CANBUS board TSG:CB1 | Thursday, September 26, 2019, 11:28: The
control board to TSG:CB1 was removed and
replaced. |
|
|
760
|
Friday, September 27, 2019, 11:54 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-6 | | Conditioning UC#(29) HS | Using broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53:
Roughing. |
|
|
761
|
Wednesday, October 02, 2019, 13:42 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Conditioning UC#(30) HS | Wednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13:
Turbo Pumps started. |
|
|
762
|
Friday, October 18, 2019, 15:01 |
Aaron Schmidt | SiC#38 | HP-FEBIAD | ITE | TM2 | 42464-4 | 42752-1 | In progress | Conditioning SiC#38 HP-FEBIAD | Friday, October 18, 2019, 14:58: Roughing.
Friday, October 18, 2019, 15:30:
Turbo pumps on. |
12x |
|
763
|
Wednesday, October 23, 2019, 09:51 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak in Magnet PS | Wednesday, October 23, 2019, 09:50:
Fault: 12797
WP: C2019-10-23-2 |
|
|
770
|
Friday, November 08, 2019, 14:21 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Nitrogen Bottle leak test | Friday, November 01, 2019, 14:00: Nitrogen
bottle installed. Purged waterlines HS /
FS#5. Purge done in conjunction with SiC#38 |
|
|
771
|
Friday, November 15, 2019, 10:35 |
Aaron Schmidt | | | | | | | | Pump down empty Chamber | Friday, November 15, 2019, 09:35: Roughing.
Friday, November 15, 2019, 10:34:
Turbo pumps on. |
|
|
775
|
Friday, December 20, 2019, 07:59 |
Aaron Schmidt | | | | | | | | Holiday TS shut down | Friday, December 20, 2019, 07:58: Turn
off ion gauges. Shut off turbo pumps TP6,
TP2, TP1A, & TP1B. Close backing valves. |
|
|
777
|
Tuesday, January 21, 2020, 09:38 |
Aaron Schmidt | SiC#40 | LP-SIS | | | 43044-8 | 43515-8 | In progress | Conditioning SiC#40 HS | Was intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34: |
|
|