184
|
Monday, August 27, 2012, 15:21 |
Aurelia Laxdal | | | | | | | In progress | Xantrex PS 10-600 for TSH:TGHT is not working | When turned ON it was not going higher than 3.6A (EPICS/front panel). Kazuya checked the connections at the back and also the EPICS/PLC/PS input/output signals. He compared these values with the similar once of the TSH:TBHT PS (which is also a Xantrex PS 10-600). E-Fault 6275
It turned out to be the connections on the top of the ion source box: the target heater was not connected and the power supply was not seeing the load. Tomorrow we'll check all the top connections, with the corresponding power supplies. |
183
|
Monday, August 27, 2012, 13:21 |
Aurelia Laxdal | NiO#1 | HP-FEBIAD | ITE | TM4 | | | In progress | HV conditioning at Test Stand | Did HV conditioning up to TSG:BIAS=30kV, TSH=EE=-600V
Turned off the HV for Kazuya to check the connection/output of the TSG:TGHT Xantrex power supply. |
182
|
Friday, August 24, 2012, 08:28 |
Anders Mjos | NiO#1 | HP-FEBIAD | ITE | TM4 | | | Done | NiO#1 installed |
Anders Mjos wrote: |
Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing.
Thursday, August 23, 2012, 12:12 : Starting turbos.
Thursday, August 23, 2012, 12:16 : TP1B at speed.
Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.
Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5
Thursday, August 23, 2012, 12:22: Vacuum at 2E-5
Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7
|
Friday, August 24, 2012, 08:28: Opened water lines. No response in vacuum. Stable at 3.1E-7 |
181
|
Thursday, August 23, 2012, 11:59 |
Anders Mjos | | | | | | | Problems/Solutions | Roughing blows the fuse for both roughing pumps. | The fuse for both roughing pumps blows when roughing the chamber. With the help from Edi: disconnect the exhaust port on the roughing pump for the first few hundred torrs of roughing. Reconnect and continue.
Seems the roughing pump RP1 pushes air towards the exhaust of RP2 which blows the fuse |
180
|
Thursday, August 23, 2012, 11:39 |
Anders Mjos | NiO#1 | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 installed | Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing.
Thursday, August 23, 2012, 12:12 : Starting turbos.
Thursday, August 23, 2012, 12:16 : TP1B at speed.
Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.
Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5
Thursday, August 23, 2012, 12:22: Vacuum at 2E-5
Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7 |
179
|
Thursday, August 23, 2012, 10:40 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced TMSRP2 | Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49: TMSRP2 replaced and started. |
178
|
Thursday, August 23, 2012, 10:11 |
Anders Mjos | | | | | | | In progress | Venting - installation of NiO#1 | Thursday, August 23, 2012, 10:10: Vacuum 2.1E-7
Thursday, August 23, 2012, 10:10: Stopped both turbos.
Thursday, August 23, 2012, 10:20: Water purged.
Thursday, August 23, 2012, 10:53: Venting |
177
|
Friday, August 17, 2012, 12:53 |
Pierre Bricault | | | | | | | Done | | Test completed.
exel file on My Documents in folder FEBIAD Test Aout2012/TestFEBIAD
Edited by Anders 2012-09-19, file attached. |
Attachment 1: TestFEBIAD.xlsx
|
176
|
Friday, August 17, 2012, 10:09 |
Pierre Bricault | | | | | | | In progress | FEBIAD test cathode bias | Backing pressure on the bender section is quite large. TMSIG6 reads 5.09E-7 T and TMS:CG2B reads 0.249 T! |
175
|
Friday, August 17, 2012, 08:30 |
Pierre Bricault | | | | | | | In progress | FEBIAD test with cathode biased | Yesterday Ray Dube has changed the configuration in order to run the FEBIAD with the cathode on negative bias.
There were a short between the gas line and the common. The box has been opened and the short removed.
This morning I am turning on the cathode heater to 290 A. |
174
|
Thursday, August 16, 2012, 16:56 |
Anders Mjos | | | | | | | In progress | Pumping down after troubleshooting | Thursday, August 16, 2012, 17:04 : Starting turbos
Thursday, August 16, 2012, 17:09 : TP1B at speed
Thursday, August 16, 2012, 17:13 : TP1A at speed (after 1 time out)
Thursday, August 16, 2012, 17:14 : Vacuum at 1.8E-5 |
173
|
Thursday, August 16, 2012, 16:56 |
Anders Mjos | | | | | | | Problems/Solutions | Target heater PS disconnected from controls. | As per Ray Dube for the FEBIAD anode bias test. The PS will need to be reconnected before a target is run. |
172
|
Thursday, August 16, 2012, 16:54 |
Anders Mjos | | | | | | | Problems/Solutions | Short between gas line and heat shield | There was a short between the gas line and the heat shield - as the gas line insulator was not tied to the heat shield. A Ta-wire was used to tie the gas line and keep it from touching the heat shield. |
171
|
Thursday, August 16, 2012, 15:30 |
Anders Mjos | | | | | | | Problems/Solutions | Venting to investigate short between anode - cathode | Thursday, August 16, 2012, 15:29: Turbos off
Thursday, August 16, 2012, 15:50 : Venting |
170
|
Thursday, August 16, 2012, 10:41 |
Pierre Bricault | | | | | | | In progress | Test FEBIAD | Ray is finishing the electrical modifications for the FEBIAD with the biased cathode.
We found the source of the sparks. The disconnected target heater cables were resting on the Einzel lens cap.
|
169
|
Monday, August 13, 2012, 14:56 |
Pierre Bricault | | | | | | | In progress | FEBIAD test | One thing that seems to be strange regarding this FEBIAD is the best results are without any current in the coil.
Normally for the neon ionization the on-line source wanted to be at around 50 to 80 Amp. Not this one.
Is there anything special about this coil?
|
168
|
Monday, August 13, 2012, 14:26 |
Pierre Bricault | | | | | | | In progress | FEBIAD test | I am done with the FEBIAD test (anode biased)
We will swap the bias now to the cathode and change the polarity to negative. |
167
|
Monday, August 13, 2012, 10:59 |
Pierre Bricault | | | | | | | Problems/Solutions | Test FEBIAD | This morning I try to contact PS group no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel and reconfigure MB1 power supply.
This worked.
|
166
|
Monday, August 13, 2012, 08:39 |
Anders Mjos | | | | | | | Problems/Solutions | Started Archivers | Archivers not running this morning. Started both ISACT and SOURCES |
165
|
Sunday, August 12, 2012, 22:07 |
Pierre Bricault | | | | | | | In progress | FBIAD test | The reset restored the control.
But magnet supply does not put any amperage out.
Try turning it off and on. No chance.
I gave up. See tomorrow. |
|