  669   Tuesday, June 19, 2018, 10:30 Aaron Schmidt      DoneRGA repair

Monday, June 18, 2018, 10:00: RGA removed from ISAC TS. Handed to Travis C. Communications issues found

Communications chip replaced.


 Tuesday, June 19, 2018, 08:36: Re-install RGA.

Tuesday, June 19, 2018, 10:29: RGA confirmed operational

  677   Friday, August 10, 2018, 10:56 Aaron Schmidt      Problems/SolutionsNew PS installation and Cathode BIAS set

Friday, August 10, 2018, 10:25: Remove TBHT 500 PS and replace with TBHT 600 PS.

Friday, August 10, 2018, 10:50: Switch wiring in the high voltage cage from and Anode BIAS to Cathode BIAS setting.

Friday, August 10, 2018, 11:32: TBHT limit increased from 500A to 600A by Controls group.

 Friday, August 10, 2018, 11:34: TBHT tested manually. Operation is satisfactory.

  679   Tuesday, August 21, 2018, 12:54 Anders Mjos      Problems/Solutions9-pin connection configuration

Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders

Grounded     X            
Source Tray Side (looking head on) 1 2 3 4 5 6 7 8 9
High Voltage Cage Side 5 4 3 2 1 9 8 7 6

 

  681   Wednesday, August 29, 2018, 11:36 Aaron Schmidt       Epics / putty crash.

Wednesday, August 29, 2018, 11:35: EPIC's crashed.... epically.

Unable to restart Putty or TS controls.

  682   Friday, August 31, 2018, 10:16 Aaron Schmidt      Problems/SolutionsRGA connection loss.

Friday, August 31, 2018, 10:10: The RGA will not re-connect to the computer. Manually turned it off while under vacuum to protect the filament before shutting down the turbo pumps.

Friday, August 31, 2018, 10:15: Ion gauge & turbo pumps off.


Wednesday, September 05, 2018, 10:00: Communications chip replaced by RH (Travis C.)

Wednesday, September 05, 2018, 10:40: Computer restarted to reconnect/reboot.

Wednesday, September 05, 2018, 11:05: RGA started

  689   Monday, October 15, 2018, 14:38 Aaron Schmidt      Problems/SolutionsAnode / Cathode PS to Negative

Monday, October 15, 2018, 13:00-14:00 Anode / Cathode BIAS PS polarity reversed by John Chow.

PS: Negative

  690   Monday, October 22, 2018, 07:18 Aaron Schmidt       TS restart after power outage

Friday, October 19, 2018, 10:00 (Approx): Site wide power outage. TS completely shut down. 

Power brought back Saturday

Monday, October 22, 2018, 07:15: Full white out on screens. To restart PLC.

Monday, October 22, 2018, 07:42: Multiple attempts made to restart the PLC. Controls white out continues

Also attempted restart of the Vacuum. All 4 turbo pumps switch back to red on any restart attempt.

 

The turbo pumps had been manually switched off from the controllers to protect them once the power was switched back on.

Monday, October 22, 2018, 09:28: Turbo pumps restarted.

Monday, October 22, 2018, 11:01: All back except the magnet.

  

  694   Tuesday, November 06, 2018, 08:52 Aaron Schmidt      In progressPump down empty chamber

Tuesday, November 06, 2018, 08:50: Roughing

Tuesday, November 06, 2018, 08:51: Doors sealed.

Tuesday, November 06, 2018, 09:51: Turbo pumps on. 


Thursday, November 08, 2018, 06:45: Ion gauge & Turbo pumps off. 

Thursday, November 08, 2018, 08:36: Venting.

  696   Thursday, November 08, 2018, 14:13 Aaron Schmidt       Ar & Ne gas bottle replacement.

Thursday, November 08, 2018, 14:05: Fresh / recently calibrated Neon & Argon bottles installed.

Leak rates: Argon=2.02E-7 atm*cc/sec

                   Neon=1.75E-7 atm*cc/sec

 

Datasheet attached.

 

Attachment 1: GasLeak_Datasheet.pdf
GasLeak_Datasheet.pdf GasLeak_Datasheet.pdf
  697   Monday, November 19, 2018, 14:22 Aaron Schmidt      Problems/SolutionsVacuum issues.

1) When opening FC0 a spike occurs in the vacuum on IG6 & IG1 (though not as bad). This spike trips off the optics, and if left unchecked, will trip off the TGHT / TBHT / Sources.

2) RGA is also unresponsive

3) Leak rates also noted in the Ar gas bottle for the FEBIAD source. Previous trips had occurred in the most recent FEBIAD tests.


 

Optics tripped during FC0 removal. Vacuum spikes also detected on IG1 & IG6. No response on RGA.

Monday, November 19, 2018, 11:17: RGA providing no data. Stop, restart, multiple times. 

Monday, November 19, 2018, 11:25: RGA shut down. No response from and attempt to restart. 

Monday, November 19, 2018, 11:30: FC0 opened. Optics tripped. Vacuum increased on IG6 up to 7.9e-06T & IG1 increased to 4.4e-06T. Shut again to avoid tripping the entire system as the vacuum climbed.

Monday, November 19, 2018, 11:34: Auto-cooling @ 2A per min. Ramp down & trouble shoot after.

Monday, November 19, 2018, 14:11: Tap down HV on sources to 0V. Close & reset IV4. After closing IV4, spike in Vacuum on IG6 noted. Drop in vacuum on IG1 noted.

Monday, November 19, 2018, 14:33: FC0 opened/closed. Vacuum Spike on IG6 noted from 1.5e-06T to 1.02e-05T and back down to 1.5e-06T. IG1 unaffected with IV4 closed.


Source gas lines remain off. Setup for LD on FC0.

Tuesday, November 20, 2018, 08:30: Pump switched on. Convectron gauge @ 18.6 mTorr, spiked to 125 mTorr after opening the valve to the pump. IG1 @ 3.0e-07T.

Allow time for the small pump to pump lines down before re-opening.

Tuesday, November 20, 2018, 08:38: Small vacuum spike noticed on IG1 up to 4.0e-07T after reopening line to the small pump. Convectron gauge spiked to 1.75T.

Tuesday, November 20, 2018, 09:05: Opened valve to the small pump. Small vacuum spike noticed on IG1 up to 5.77e-07T after reopening line to the small pump. Convectron gauge spiked to 3.55 Torr from 125 mTorr.

The small leak in SV5 allows the lines to 'pump down into the mTorr range, however upon opening the line to the pump, the line pressure increases.

Tuesday, November 20, 2018, 10:44: Opened valve to the small pump. Small vacuum spike noticed on IG1 up to 5.02e-07T after reopening line to the small pump. Convectron gauge spiked to 3.25 Torr from 18.6 mTorr.

Pump ineffective at pumping out the gas lines. Replace

Tuesday, November 20, 2018, 10:48: Small pump shut off. Move forward with LD of FC0

Tuesday, November 20, 2018, 13:21 : Valve opened w/ LD connected. Base:

IG6: 1.91e-06T

Leak rate: 7.4e-09 atm-cc/sec.

Apply He around FC0 (cup in):

IG6: 1.91e-06T

Leak rate: 5.5e-05 atm-cc/sec. Wait for leak rate stablization.

Tuesday, November 20, 2018, 13:48:

Apply He around FC0 (cup out):

IG6: 2.75e-05T

Leak rate: 9.9e-05 atm-cc/sec. Wait for leak rate stabilization. Bellows specifically will max out the LD.

-Leak confirmed on the bellows of FC0 as suspected. Submitting a fault report.

-RGA scans checked and taken. No response/noted 'noise'. No error messages displayed, however we will check/swap out the filament for a new one to confirm.


Monday, November 26, 2018, 08:10: Turbos & ion gauges off.

Monday, November 26, 2018, 09:32: Quick vent shot & hold.

  698   Wednesday, December 05, 2018, 10:22 Aaron Schmidt      Problems/SolutionsRGA Filament & Ionizer replacement

RGA Ionizer & Filament replaced as per SRS RGA manual.

The ionizer was found to be dirty and the previous RGA filament was broken. Initially the  old filament appeared to have warped and looked stuck to the anode grid/cage.

Both were replaced with clean parts. the support rods were also cleaned with acetone & methanol.

 

Parts used from the Replacement Ionizer Kit - SRS# O100RI

 

Repeller Cage - SRS Part# 7-00592

Anode Grid - SRS Part# 7-00591

Focus & Plate - SRS Part# 7-00590

ThO2/Ir Filament - SRS Part# 7-00611-720

 

Wednesday, December 05, 2018, 10:16: Roughing.

Probe bake out & RGA tuning required.

Wednesday, December 05, 2018, 11:08: Turbo pump on.

Wednesday, December 05, 2018, 11:13: Ion gauge on.

Wednesday, December 05, 2018, 13:38: TSG:BV1A Randomly shut off? TP1A tripped. Restarted.

Wednesday, December 05, 2018, 13:40: RGA switched on including the filament.


Thursday, December 06, 2018, 10:17: Vacuum @ 5.68e-07T on IG1 before Degas. Begin degas cycles 200 sec each, 1 min apart, 3 times.

Thursday, December 06, 2018, 10:30: Degas complete. Minimal change in IG1 Vac @ 5.70e-07T.

 

Attachment 1: 20181205_RGA-Old_I&F.jpg
20181205_RGA-Old_I&F.jpg
Attachment 2: 20181205_RGA-Old_I&F-2.jpg
20181205_RGA-Old_I&F-2.jpg
Attachment 3: 20181205_RGA-Old_I&F-Anode_view.jpg
20181205_RGA-Old_I&F-Anode_view.jpg
Attachment 4: 20181205_RGA-OLD_I&F-Broken_Filament_&_Dirty_Anode.jpg
20181205_RGA-OLD_I&F-Broken_Filament_&_Dirty_Anode.jpg
Attachment 5: 20181205_RGA-Old_I&F-Dirty_Anode-Focus_Plate.jpg
20181205_RGA-Old_I&F-Dirty_Anode-Focus_Plate.jpg
Attachment 6: 20181205_RGA-Old_I&F-Dirty.jpg
20181205_RGA-Old_I&F-Dirty.jpg
Attachment 7: 20181205_RGA-New_A&R.jpg
20181205_RGA-New_A&R.jpg
Attachment 8: 20181205_RGA-New_Anode_&_Filament.jpg
20181205_RGA-New_Anode_&_Filament.jpg
Attachment 9: 20181205_RGA-New_Anode_&_Repeller_cages.jpg
20181205_RGA-New_Anode_&_Repeller_cages.jpg
Attachment 10: 20181205_RGA-New_Filament_&_Ionizer_assy.jpg
20181205_RGA-New_Filament_&_Ionizer_assy.jpg
Attachment 11: 20181205_RGA-New_Filament_&_Ionizer_assy-2.jpg
20181205_RGA-New_Filament_&_Ionizer_assy-2.jpg
Attachment 12: TS-2018-12-05-13-40_RGA_Check.rga
  699   Thursday, December 06, 2018, 11:02 Aaron Schmidt      Problems/SolutionsFC0 Bellows Replacement.

Thursday, December 06, 2018, 11:02: Turbo pumps (TP6 & TP2) off on beamline side. IG6 off.

Thursday, December 06, 2018, 14:06: Turbo pumps restarted. FC0 bellows replacement to occur Monday.


Monday, December 10, 2018, 11:00: Vented on beam side of IV4. Turbo pumps & backing valves closed preemptively on chamber side due to shared airlines.

Pulled FC0, disassemble, check, clean, remove / install bellows, Re-align, assemble.

Monday, December 10, 2018, 12:52: Re-installed repaired FC0. Roughing beam side. Chamber side turbos back on.

Monday, December 10, 2018, 13:48: Turbo pumps on.

Monday, December 10, 2018, 13:51: Ion gauge on. IG6 @ 5.73e-06T and still dropping.


Tuesday, December 11, 2018, 09:26: IG6 Vacuum @ 3.56e-07T. Connected cables.

Tuesday, December 11, 2018, 09:27: Drive out FC0. Vacuum @ 3.75e-07T. Ok. Setup LD & drive FC0 back in.

Tuesday, December 11, 2018, 09:32:  LD baseline before opening valve to beam line turbo & RP pumps: below 0.0e-09 T-l/sec

Tuesday, December 11, 2018, 09:36: Full open base, FC0 in:

Vacuum @ 3.56e-07T.

LD:  0.0e-09 atm-cc/sec

Spray w/ He:

No change.

Tuesday, December 11, 2018, 09:42: FC0 out:

Vacuum @ 3.60e-07T.

LD: 0.0e-09 atm-cc/sec.

Spray w/ He:

No Change. Sprayed all flanges and seals all around FC0 and it's connection to the beam line. OK.

Tuesday, December 11, 2018, 09:46: Closed FC0 & line to the turbo & RP pumps. LD off.

FC0 Bellows replacement a success.

More pictures uploaded to Docushare.

 Home  --->  ISAC Test Stand  Contains  Test Stand Refurbishing  Contains  FC0 Bellows Replacement Listing

Attachment 1: 20181206_Old_Bellows.jpg
20181206_Old_Bellows.jpg
Attachment 2: 20181210_112528.jpg
20181210_112528.jpg
Attachment 3: 20181210_115310.jpg
20181210_115310.jpg
Attachment 4: 20181211_New_Bellows_installed.jpg
20181211_New_Bellows_installed.jpg
  704   Wednesday, January 09, 2019, 09:10 Aaron Schmidt       Cathode to Anode. PS to Positive

Wednesday, January 09, 2019, 09:09: Upper HV cage set to Anode / Positive as per dwg ISK4523D Rev 6.


Thursday, January 10, 2019, 10:00: Switch Anode PS to positive

Thursday, January 10, 2019, 11:29: Anode switched on. Short discovered. 10 V = 0 V & 100 mA.

  705   Thursday, January 10, 2019, 11:38 Aaron Schmidt       Power outtage prep

Thursday, January 10, 2019, 11:32: Power down TS. Lock out.

Thursday, January 10, 2019, 11:36: RGA switched off full.

Thursday, January 10, 2019, 11:38: All ion gauge and turbos off. BV's closed.


Friday, January 11, 2019, 07:30: Vent TS.

Friday, January 11, 2019, 08:10: Purge FS#5 waterlines and close off main supply / return.

Friday, January 11, 2019, 08:12: Closed PV1 & PV2. Shut off the roughing pumps.

  706   Monday, January 14, 2019, 09:47 Aaron Schmidt       TS restart after power outage

Monday, January 14, 2019, 09:00: Epics white out

Ref: Fault report  11993 (11981 & 11817)

Monday, January 14, 2019, 09:35: Vacuum page came back. Restarted Roughing pumps. All other pages still in whiteout state.


Wednesday, January 16, 2019, 14:05: FEBIAD installed. Turbo pumps on for Beamline side. Roughing Chamber. Vacuum contols working. All else still in 'whiteout'


Monday, January 21, 2019, 10:30: Epics whiteout state ended. IOC Power cycled by Rod N. IG6 timing out? Contact vacuum group.

  707   Monday, January 21, 2019, 10:55 Aaron Schmidt       2019 Anode tests FM-1

Monday, January 21, 2019, 10:50: RGA on.

Monday, January 21, 2019, 10:54: Waterlines opened. No response on RGA. Vacuum ok @ 8.4e-07. IG6 not responding. Ok for this test.

Monday, January 21, 2019, 11:00: Power / Sources on.

Monday, January 21, 2019, 11:03: Anode to 300 V - 0.000 mA.

Monday, January 21, 2019, 11:05: Auto-ramping TGHT to 300 A @ 2 A per min.


Tuesday, January 22, 2019, 08:10: Auto-ramping TGHT to 580 A @ 2 A per min.


FM

Tuesday, January 22, 2019, 09:43 : Lowering the voltage to turn off Anode PS in order to replace the multimeter battery.

Tuesday, January 22, 2019, 09:51: Multimeter battery replaced. Turning on Anode PS and increasing the voltage to 300 V.

Tuesday, January 22, 2019, 10:46 : Auto-ramping TBHT to 200 A @ 2 A per min. Vaccum ok @1.29e-6 T

Tuesday, January 22, 2019, 13:08 :  Auto-ramping TBHT to 270 A @ 2 A per min. Vaccum ok @1.56e-6 T

Tuesday, January 22, 2019, 15:18 : Auto-ramping TBHT to 290 A @ 2 A per min. Vaccum ok @1.67e-6 T

Tuesday, January 22, 2019, 16:00: Manually-ramping  TBHT to 295 A @ 2 A per min. Vaccum ok @1.76e-6 T


FM

Wednesday, January 23, 2019, 09:35 : Manually-ramping  TBHT to 300 A @ 2 A per min. Vaccum ok @1.21e-6 T

Wednesday, January 23, 2019, 10:49 : Auto-ramping TBHT to 310A @ 2 A per min. Vaccum ok @1.12e-6 T

Wednesday, January 23, 2019, 12:07 : Manually-cooling TBHT to 270A @ 2 A per min. Vaccum ok @1.12e-6 T

Wednesday, January 23, 2019, 14:25:   Auto-ramping TBHT to 330A @ 2 A per min. Vaccum ok @1.03e-6 T

Wednesday, January 23, 2019, 16:23: Anode drain current was in runaway situation. When decreasing the TBHT current, the increment was set to 10 instead of 1 so there was a 10 A decrease from 330 to 320 A. This large decrease was unintended

Wednesday, January 23, 2019, 16:25:  Manually-cooling TBHT to 300A @ 2 A per min. Vaccum ok @1.12e-6 T

Wednesday, January 23, 2019, 17:18 : Manually-cooling TBHT to 290A@ 2 A per min. Vaccum ok @1.12e-6 T


 FM

Thursday, January 24, 2019, 13:18:  Manually-cooling TBHT to 270A@ 2 A per min. Vaccum ok @9.02e-7 T

Thursday, January 24, 2019, 15:28 :  Manually-cooling TBHT to 250A@ 2 A per min. Vaccum ok @8.67e-7 T


FM

Friday, January 25, 2019, 14:59 : Manually-cooling TBHT to 240A@ 2 A per min. Vaccum ok @7.04e-7 T

Friday, January 25, 2019, 16:26 : Manually-cooling TBHT to 230A@ 2 A per min. Vaccum ok @5.18e-7 T


FM

Monday, January 28, 2019, 10:27:  Auto-ramping TBHT to 290A @ 2 A per min. Vaccum ok @4.91e-7 T

Monday, January 28, 2019, 11:32:   Manually-cooling TGHT to 570A@ 2 A per min. Vaccum ok @5.10e-7 T

Monday, January 28, 2019, 14:43:  Auto-ramping TBHT to 300A @ 2 A per min. Vaccum ok @5.46e-7 T

Monday, January 28, 2019, 15:57 : Manually-cooling TBHT to 290A@ 2 A per min. Vaccum ok @5.54e-7 T


FM

Tuesday, January 29, 2019, 15:42 : Manually-cooling TGHT to 560A@ 2 A per min. Vaccum ok @5.54e-7 T


FM

Wednesday, January 30, 2019, 17:23:  Manually-cooling TGHT to 550A@ 2 A per min. Vaccum ok @4.65e-7 T


FM

Friday, February 01, 2019, 14:45:   Manually-cooling TGHT to 540A@ 2 A per min. Vaccum ok @4.74e-7 T

Friday, February 01, 2019, 16:49: Auto cooling TGHT to 0A@2 A per min. 

Friday, February 01, 2019, 22:22:  Auto cooling TBHT to 0A@2 A per min. 


FM

Saturday, February 02, 2019, 10:07:   Auto-ramping TBHT to10A  and TGHT to 10A@ 2 A per min. Vacuum ok @3.13e-7 T


AS

Monday, February 04, 2019, 09:20: Restarted RGA. TGHT, TBHT, Anode, off. Prep to open gas lines.

Monday, February 04, 2019, 09:24: Open / Close SV4 only. Vacuum spike t0 5.5e-05T. Alternate between SV4 & SV5 to fully open Argon.

Monday, February 04, 2019, 09:48: Vacuum Stable @ 5.3e-07T

Monday, February 04, 2019, 09:49: Anode to 200 V. TBHT & TGHT on.

Monday, February 04, 2019, 09:51: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

FM

Tuesday, February 05, 2019, 12:01 :  Power / Sources on.

Tuesday, February 05, 2019, 12:02 : BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.

Tuesday, February 05, 2019, 12:10 : Cancelled! I need to remove first the multimeter in order to have high voltage.

Tuesday, February 05, 2019, 12:10 : Auto-cooling.


Wednesday, February 06, 2019, 07:55: Reset IV4. -AS

FERNANDO! CALL ME OR CHECK YOUR EMAIL BEFORE YOU CONTINUE.

Wednesday, February 06, 2019, 09:35: Cage off. Multimeter removed. Cage replaced.

Wednesday, February 06, 2019, 09:48: Power on. Gas lines (Ar) open

Wednesday, February 06, 2019, 10:00: Sources on.

Wednesday, February 06, 2019, 10:10: Anode 200 V. BIAS / EZL / EE @ 30 / 13 / -1.5 kV.

Wednesday, February 06, 2019, 10:11: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

Wednesday, February 06, 2019, 10:12: IV4 open. Optics on.

Wednesday, February 06, 2019, 10:16: Optics set.


FM

Thursday, February 07, 2019, 09:59 : Mass scan attempted  and nothing shows. The current needs to be inverted. This was noted also by checking previous runs and the magnetic field on the epics optics window shows a negative magnetic field, while  now is showing a positive value.

Thursday, February 07, 2019, 12:55: MB1 set from Reverse to Normal manually. Auto range 'On'  FC6. Use 'Prepare down" & 'Down' to scan. - AS

Thursday, February 07, 2019, 16:55 : Auto-ramping TBHT to 310 A @ 2A per min.


FM

Friday, February 08, 2019, 09:04: FC0 current stable. Starting measurements of ion curres as a function of coil current, anode voltage, and possibly tbht. I'll be looking argon and CO.


FM

Friday, February 15, 2019, 15:38 Auto cooling TGHT/TBHT to 0A @ 2A/min


Tuesday, February 19, 2019, 08:34: BIAS / EZL/ EE @ 0 kV. Power to HV also turned off. - AS

Tuesday, February 19, 2019, 14:36 : Starting vacuum peak tests: For this I will close the valve and wait untill the vacuum has stabilized, then I will open the valve to see the maximum vacuum peak obtained.


Thursday, February 21, 2019, 11:58: Restart RGA - AS

Thursday, February 21, 2019, 14:05: SV5 closed, then SV3 & SV4

Thursday, February 21, 2019, 14:15: Mini pump started. Vacuum ok

Thursday, February 21, 2019, 14:20: Valve from mini pump opened. Vacuum jumped to 8.30e-07T after 2 minutes.

Thursday, February 21, 2019, 14:25: SV4 & SV3 opened. Vacuum @ 9.0e-07T with mini pump running.

Thursday, February 21, 2019, 14:30: Mini pump valve closed. Mini pump off. SV5 opened.  Vacuum to 3.1e-06T

  708   Thursday, January 24, 2019, 08:42 Aaron Schmidt       IG6 fix (w/ instruction)

TMS:IG6 had continued communication errors post power outage & would not switch on. After a power loss, IG6 switches automatically to Filament 1. Filament 1 is burnt out.

Thursday, January 24, 2019, 08:14: TMS:IG6 fixed. Switched from Filament 1 to Filament 2. FIL2 runs ok.

Instructions from Edi:

-Using the + / - keys move the cursor on the control box to select FIL2. The control box is located above the beam line turbo pump control boxes / inside the black cabinets under the TS.

-Press ok to switch FL2 : ON

-Turn IG6 on with the computer (EPICS) before it times out.

-Now IG6 is connected and can be switched on / off from the computer.

  712   Monday, March 11, 2019, 13:56 Aaron Schmidt      DoneTGHT PS replaced

Monday, March 11, 2019, 13:55: The TGHT PS was replaced.

Brought up to 20 A. Operation. ok.

  713   Thursday, March 21, 2019, 08:33 Aaron Schmidt       Pump down TS

Thursday, March 21, 2019, 08:32: Roughing.

  714   Tuesday, March 26, 2019, 10:44 Aaron Schmidt      Problems/SolutionsEZL PS replaced. Test

EZL checked. OK @ 5kV

BIAS PS issues.

2.3kV on screen. Read back on PS 3kV. Direct measurement reads 5.8 kV

Readback does not increase with the controls. Stops at 2.4kV & the current climbs very quickly.

Tuesday, March 26, 2019, 11:00: EZL PS routed to TS BIAS, but still controlled via EZL controls. EZL line grounded.

Brought up to 20kV, no sparks. 

New EZL PS confirmed ok. BIAS PS has issues.

Attachment 1: New_EZL_PS_testing_-_2019.docx