  236   Thursday, November 29, 2012, 16:21 Anders Mjos       Pumping downThursday, November 29, 2012, 16:21: Roughing   
  237   Friday, November 30, 2012, 10:42 Anders Mjos       Venting    
  240   Tuesday, December 04, 2012, 11:05 Anders Mjos       VentedIn preparation for RFQ target and leak
troubleshooting.
Tuesday, December 04, 2012, 11:04:
  
  243   Thursday, December 06, 2012, 08:41 Anders Mjos       Opened cooling waterVacuum stable at 2.8E-7 T   
  244   Tuesday, December 11, 2012, 13:27 Sebastian Raeder       9 PIN connectorA Sub D 9 Pin connector on a HV insulator
was installed on Port Q of the target box
at the teststand. The insulator is leak tested
  
  247   Thursday, December 13, 2012, 14:38 Anders Mjos       Pumping down empty chamberThursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56
: Starting turbos
  
  248   Friday, December 14, 2012, 14:24 Sebastian RaederRFQ empty      VentingFriday, December 14, 2012, 14:24 Stop Turbopumps
and prepare venting to insert RFQ target
  
  251   Monday, December 17, 2012, 22:35 Sebastian RaederRFQ empty      wire connection for RFQ testOverview over the connections of the new
9Pin connector inside the vacuum and in the
HV cage
  
  252   Tuesday, December 18, 2012, 12:51 Sebastian Raeder       Anode powersupply connected to HV-commonThe anode PS is turned off and connected
to HV common.
the Target is connected to a -18V
  
  257   Thursday, December 20, 2012, 14:19 Anders Mjos       Power down for holidays    
  262   Monday, January 07, 2013, 14:52 Sebastian RaederRFQ empty      heating targetheating target for RFQ tests. Now the wiring
is insulated with alumina beats and tubing
and the target has the standard Ta alkali
 RFQ_with_signal_total.PNGRFQ_with_signal.PNG 
  264   Wednesday, January 09, 2013, 14:13 Anders MjosEmpty      RougingWednesday, January 09, 2013, 14:12: Roughing
empty chamber
  
  266   Friday, January 11, 2013, 11:02 Anders MjosRFQ empty      Target installed, pumping downTarget installed with 120 in lbs torque
on target legs and on central support.
Friday, January 11, 2013, 11:01:
  
  268   Monday, January 14, 2013, 18:18 Friedhelm Ames       TMS:CBC1 not workingThe optics at the teststand has been switched
on, but TMS:CBC1 is not working. A fault
report has been send to controls.
  
  269   Tuesday, January 15, 2013, 15:12 Sebastian RaederRFQ empty      Start coolingStart cooling of Target RFQ empty   
  270   Tuesday, January 15, 2013, 16:10 Anders MjosRFQ empty      Turbos off

    

       
            
  
  271   Wednesday, January 16, 2013, 01:06 Sebastian RaederRFQ empty      Target installed - pumping downRFQ empty target installed
Wednesday, January 16, 2013, 01:05:
roughing started
  
  273   Friday, January 18, 2013, 11:28 Sebastian RaederRFQ empty      stop turbosFriday, January 18, 2013, 11:28: turbos
stopped
  
  274   Friday, January 18, 2013, 15:34 Anders Mjosempty      Pumping down empty chamberStarted roughing
Friday, January 18, 2013, 15:25:
Started turbos
  
  277   Monday, January 28, 2013, 12:56 Anders MjosEmpty      Venting For conductor bolt work
Monday, January 28, 2013, 12:56:
Turbos off
  