ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
 |
631
|
Thursday, February 08, 2018, 16:54 |
Carla Babcock | | | | | | | | EZL strange behaviour | Thursday, February 08, 2018, 16:54
Testing the HV bias I found that
the einzel lens was behaving strangely. When |
|
714
|
Tuesday, March 26, 2019, 10:44 |
Aaron Schmidt | | | | | | | Problems/Solutions | EZL PS replaced. Test | EZL checked. OK @ 5kV
BIAS PS issues.
2.3kV on screen. Read back on PS |
|
210
|
Monday, September 24, 2012, 10:31 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS whiteout | Test stand was off this morning and
EPICS controls in "white-out".
Controls is looking into it. |
|
346
|
Wednesday, November 27, 2013, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS whiteout | Since yesterday around 4pm. Due to attempt
to use the TMS:ER0 device.
IOC rebooted this morning. Archivers |
|
376
|
Friday, May 09, 2014, 10:48 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS white-out e-fault 7380 | Monday, May 12, 2014, 10:02: Jane R. power
cycled the hardware. EPICS is back up. Sources
archiver required a restart. |
|
442
|
Tuesday, May 19, 2015, 19:10 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS white out | Likely caused by the PLC. e-fault
8139
Wednesday, May 20, 2015 |
|
440
|
Friday, May 08, 2015, 09:07 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS lost contact with the PLC | Everything shut down, while EPICS showed
everyhing to be on.
Controls group (Dave Morris) has |
|
509
|
Thursday, May 12, 2016, 13:32 |
Aaron Schmidt | SiC | LP-SIS | | | 41077-3 | | | EE new insulator Test, No PE , Dirty EE. | Thursday, May 12, 2016, 13:00: Begin Roughing.
Thursday, May 12, 2016, 13:40: Turbo
Pumps started |
|
508
|
Friday, May 06, 2016, 10:18 |
Aaron Schmidt | SiC | LP-SIS | | | 41077-3 | | | EE new insulator Test (2) No PE | Friday, May 06, 2016, 10:18: Begin roughing
Venting: VCR on HS not closed
Friday, May 06, 2016, 12:58: Roughing |
|
507
|
Monday, May 02, 2016, 16:03 |
Aaron Schmidt | SiC | LP-SIS | | | 41077-3 | | | EE new insulator Test | Monday, May 02, 2016, 16:01: Roughing.
Monday, May 02, 2016, 16:35: Turbos
started -AM |
|
495
|
Tuesday, February 23, 2016, 10:43 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | | EE coating test - no Plasma Electrode | Cleaned up EE and around target tube. Removed
PE
Tuesday, February 23, 2016, 10:40: |
|
494
|
Friday, January 22, 2016, 15:34 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | In progress | EE coating test | Friday, January 22, 2016, 15:30: Turbos
started
Friday, January 22, 2016, 16:14: |
|
234
|
Thursday, November 22, 2012, 12:52 |
Aurelia Laxdal | Test-SiC | HP-FEBIAD | | | | | | E-Fault#6389 re-directed to PS | Evgeniy and Kazuya investigated the problem
with TSH:TGHT readbacks and they came to
the conclusion that the PS is faulty, and |
|
1005
|
Friday, April 19, 2024, 11:33 |
Dave Neilson | - | LP-FEBIAD | | | 44692-4 | 42972-10 | In progress | Development target test - Calibrated leak - Anode mode | Friday, April 19, 2024, 11:32:
assembly installed in test stand.
VV1 closed, pumping down |
|
853
|
Thursday, February 18, 2021, 11:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | DI water pump configuration | https://elog.triumf.ca/TIS/Test-Stand/847
There was a previous DI CU-LCW
pump trip as per the above elog. The CU-LCW |
|
847
|
Tuesday, February 09, 2021, 14:02 |
Aaron Schmidt | | | | | | | Problems/Solutions | DI water loss | Tuesday, February 09, 2021, 13:43: DI water
flow completely stopped.
Control room contacted. DI water |
|
426
|
Tuesday, February 03, 2015, 16:10 |
Anders Mjos | | | | | | | Problems/Solutions | Current read back on TBHT has been corrected to 600 A | By controls group |
|
479
|
Monday, November 16, 2015, 14:52 |
Anders Mjos | | | | | | | In progress | Current measurement | Installed Cu-shunts on TGHT and TBHT terminals.
HS water looped.
Monday, November 16, 2015, |
 |
374
|
Monday, April 28, 2014, 10:23 |
Anders Mjos | | | | | | | In progress | Cu-strip cleaning test - sample #2, cleaned | Monday, April 28, 2014, 10:23: Started
roughing
Monday, April 28, 2014, 10:48: Started |
|
373
|
Wednesday, April 23, 2014, 14:16 |
Anders Mjos | | | | | | | Done | Cu-strip cleaning test - sample #1, not cleaned | Wednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34
: Starting turbos |
 |
|