  ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  650   Tuesday, March 20, 2018, 09:14 Aaron Schmidt      Problems/SolutionsOptics issueTuesday, March 20, 2018, 09:11: TMS:Q5
& TMS:Q2 controllers require repair.
Unable to hold a negative voltage.
  
  652   Thursday, March 29, 2018, 10:58 Carla Babcock        Started with Anode at 25V and coil at 0A,
bias at 30kV. (attachment 1)
Ramped coil to 60A (0.4V) (attachment
 6x 
  653   Wednesday, April 11, 2018, 10:19 Aaron Schmidt       Pump down empty chamberWednesday, April 11, 2018, 10:19: Roughing   
  655   Tuesday, April 17, 2018, 11:02 Aaron Schmidt      DoneRoughing pump issue.Tuesday, April 17, 2018, 10:57: Vacuum
not coming down. @ 1.514T . Backing valves
have been closed.
  
  656   Thursday, April 19, 2018, 12:55 Fernando Maldonado      DoneRe-wiring Anode PSThursday, April 19, 2018, 12:52: Pin J1
was reconnected into the anode power supply.
All jumpers were put back to remote control.
 20180420_104954.jpg 
  657   Friday, April 20, 2018, 13:20 Carla Babcock      DoneBIAS* fan sounds like it is dying The fan in the EZL power supply is making
a terrible noise - keep an eye on it, it
sounds like it might give up soon.
  
  661   Tuesday, May 22, 2018, 08:48 Anders Mjos      Problems/SolutionsTSG:TP1A not runningPump found off on Tuesday morning.
Tuesday, May 22, 2018, 08:40: Starting
TP1A
  
  662   Thursday, May 24, 2018, 08:38 Anders Mjos      Problems/SolutionsVenting beamline for IG6 replacementThursday, May 24, 2018, 08:38: TPs stopped
Thursday, May 24, 2018, 09:18: Venting
Thursday, May 24, 2018, 14:30: IG6
  
  663   Thursday, May 24, 2018, 15:28 Anders Mjos      Problems/SolutionsReconfigured FEBIAD coil for testing new source trayThursday, May 24, 2018: Configured coil
to be (-) E&F, (+) G&H. Water should
be supplied to both terminals in either configuration.
  
  665   Monday, June 04, 2018, 16:02 Anders Mjos      Problems/SolutionsMB1 timeoutMass separator magnet timed out. Tried
reconfigure. Called Kyle from  controls who
power cycled the CANbus card. This resolved
  
  666   Wednesday, June 06, 2018, 14:01 Aaron Schmidt      Problems/SolutionsEmittance scanner (E-rig) communication issues.Wednesday, June 06, 2018, 13:50:
It was noted yesterday during the
TM2 Source HV tests that the E-rig was not
  
  667   Thursday, June 07, 2018, 09:21 Aaron Schmidt      Problems/SolutionsPump down empty chamber. Anode checkTM2 Source tray still in.
Thursday, June 07, 2018, 09:20: Roughing.
Thursday, June 07, 2018, 12:42: Turbo
 20180608_100402.jpg20180608_100835.jpg20180608_100840.jpg20180613_080550.jpg20180613_080605.jpg 
  668   Tuesday, June 12, 2018, 11:38 Aaron Schmidt      In progressSource Tray re-installationRe-installation of the ISAC Test Stand
Source tray. The TM2 ST was removed.
Tuesday, June 12, 2018, 10:15: Disconnect
 TS_Source_Tray_re-installed_2018_-_(Leak_found).docx 
  669   Tuesday, June 19, 2018, 10:30 Aaron Schmidt      DoneRGA repairMonday, June 18, 2018, 10:00: RGA removed
from ISAC TS. Handed to Travis C. Communications
issues found
  
  675   Monday, July 23, 2018, 14:25 Aaron SchmidtUC#23LP-FEBIAD-CTLITETM2  In progressConditioning Heat Shield for UC#23Monday, July 23, 2018, 14:20: Roughing.
Monday, July 23, 2018, 14:54: Turbo
pumps on. 
 UC#23_emit.dat_error.docxTS-2018-07-2-08-07.rgaTS-2018-07-24-07-20.rgaUC#23.docx 
  677   Friday, August 10, 2018, 10:56 Aaron Schmidt      Problems/SolutionsNew PS installation and Cathode BIAS setFriday, August 10, 2018, 10:25: Remove
TBHT 500 PS and replace with TBHT 600 PS.
Friday, August 10, 2018, 10:50: Switch
  
  679   Tuesday, August 21, 2018, 12:54 Anders Mjos      Problems/Solutions9-pin connection configurationPin configuration between top 9-pin connector
on Source Tray and terminal in high voltage
rack. Measured 2018-08-21 by Aaron and Anders
  
  681   Wednesday, August 29, 2018, 11:36 Aaron Schmidt       Epics / putty crash.Wednesday, August 29, 2018, 11:35: EPIC's
crashed.... epically.
Unable to restart Putty or TS controls.
  
  682   Friday, August 31, 2018, 10:16 Aaron Schmidt      Problems/SolutionsRGA connection loss.Friday, August 31, 2018, 10:10: The RGA
will not re-connect to the computer. Manually
turned it off while under vacuum to protect
  
  685   Monday, September 17, 2018, 11:52 Aaron SchmidtUC#25LP-SISITWTM2 42752-9In progressConditioning Heat Shield for UC#25Monday, September 17, 2018, 11:47: Roughing*.
Doors not sealing, help acq'd 
Monday, September 17, 2018, 11:51:
 OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlpTS-2018-09-17-14-10.rgaUC#25.docx 