ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject
  650   Tuesday, March 20, 2018, 09:14 Aaron Schmidt      Problems/SolutionsOptics issue

Tuesday, March 20, 2018, 09:11: TMS:Q5 & TMS:Q2 controllers require repair. Unable to hold a negative voltage.

+ @ 680V

- @ 0V (Should be 680V as well)

Kyle L. & Rod N notified.

 

Tuesday, March 20, 2018, 12:58: The controller was fixed.

  652   Thursday, March 29, 2018, 10:58 Carla Babcock        

Started with Anode at 25V and coil at 0A, bias at 30kV. (attachment 1)

Ramped coil to 60A (0.4V) (attachment 2)

Ramped bias to 51kV, but then TP6 turned off and there was a momentary 0.2A decrease in the TGHT current. No spike in BIAS current seen, maybe TP6 is turning off for another reason? (attachment 3)

At 57kV, a small spark, heard outside the vacuum, sounding like it comes somewhere near the blue racks which hold the power supplies. It has sounded like that to me before. Did not turn anything off but bias current spiked from 110uA to 280uA. (attachment 4)

At 57.5kV another spark, taking down TP1B and TP6, as well as the CB1 steerers and TPS:Q1/2. TGHT current dropped momentarily from 581A to 240A, or so says EPICS. Maybe just a communications effect? Voltage for TBHT also dropped but nothing seen on TBHT. Coil current and voltage also showed small effects. (attachment 5)

After 10mins at 60kV, spike in bias current with slight spike in EE current but no other effects.

After 20mins everything has been stable, will turn the bias back to 30kV. As I turn the bias voltage down, the EE current ramps up. No change to EE voltage... (attachment 6)

Attachment 1: FEBIADsource_29032018_908.PNG
FEBIADsource_29032018_908.PNG
Attachment 2: FEBIAD_striptool_29032018.PNG
FEBIAD_striptool_29032018.PNG
Attachment 3: spark_29032018_1030.PNG
spark_29032018_1030.PNG
Attachment 4: spark_29032018_1054.PNG
spark_29032018_1054.PNG
Attachment 5: spark_29032018_1100.PNG
spark_29032018_1100.PNG
Attachment 6: EEbehaviour_29032018_1145.PNG
EEbehaviour_29032018_1145.PNG
  653   Wednesday, April 11, 2018, 10:19 Aaron Schmidt       Pump down empty chamber

Wednesday, April 11, 2018, 10:19: Roughing

  655   Tuesday, April 17, 2018, 11:02 Aaron Schmidt      DoneRoughing pump issue.

Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.

TSG:CG1A @ 1.515T

TSG:CG1B @ 1.529T.

Tuesday, April 17, 2018, 11:02: TSG:PV1 Closed. Roughing pump off.

Vacuum group notified.


Wednesday, April 18, 2018: Replace pump & adapters. Clean.

Wednesday, April 18, 2018, 08:45: Start TSG:RP1 and open PV1, BV1A  & BV1B

Wednesday, April 18, 2018, 08:55: exhaust pipe/mesh cleared out back

Wednesday, April 18, 2018, 08:57: Turbo pumps on.

RP status ok.


Thursday, April 19, 2018, 08:30: waterlines opened. No response on RGA. Vacuum @ 3.42e-07T

  656   Thursday, April 19, 2018, 12:55 Fernando Maldonado      DoneRe-wiring Anode PS

Thursday, April 19, 2018, 12:52: Pin J1 was reconnected into the anode power supply. All jumpers were put back to remote control.

NOTE: the cable EXTLKT is still not connected. I will ask Carla about this one.

Thursday, April 19, 2018, 18:00: Cable EXTLKT connected.

Thursday, April 19, 2018, 18:12  When turning the transformer on, the Anode PS was not turned on. Neither the TGHT.

Thursday, April 19, 2018, 18:30: I turned off everything. Will check tomorrow with someone. 


Friday, April 20, 2018, 11:01 : Issue fixed. I've attached a picture of the jumpers connection for future references


 

 

Attachment 1: 20180420_104954.jpg
20180420_104954.jpg
  657   Friday, April 20, 2018, 13:20 Carla Babcock      DoneBIAS* fan sounds like it is dying

The fan in the EZL power supply is making a terrible noise - keep an eye on it, it sounds like it might give up soon.


Monday, April 23, 2018, 10:47: The back panel was opened. Original entry stated EZL power supply issue. Corrected to BIAS PS. High voltage group notified. Fan replacement required.


Monday, May 14, 2018, 13:20: BIAS fans, external an internal were replaced. Re-installed @ TS.

Monday, May 14, 2018, 13:26: BIAS ramped up to 10 kV. Response ok on epics and locally on the PS. No odd noise on the fans either. The issue appears to be fixed.

  661   Tuesday, May 22, 2018, 08:48 Anders Mjos      Problems/SolutionsTSG:TP1A not running

Pump found off on Tuesday morning.

Tuesday, May 22, 2018, 08:40: Starting TP1A

Tuesday, May 22, 2018, 08:47: TP1A at speed


Tuesday, May 22, 2018, 16:33: Source and optics off


Wednesday, May 23, 2018, 08:30: Stopped TP

Wednesday, May 23, 2018, 14:10: Water purged

  662   Thursday, May 24, 2018, 08:38 Anders Mjos      Problems/SolutionsVenting beamline for IG6 replacement

Thursday, May 24, 2018, 08:38: TPs stopped

Thursday, May 24, 2018, 09:18: Venting

Thursday, May 24, 2018, 14:30: IG6 replaced (second attempt) by Anthony. System pumping down

  663   Thursday, May 24, 2018, 15:28 Anders Mjos      Problems/SolutionsReconfigured FEBIAD coil for testing new source tray

Thursday, May 24, 2018: Configured coil to be (-) E&F, (+) G&H. Water should be supplied to both terminals in either configuration.

  665   Monday, June 04, 2018, 16:02 Anders Mjos      Problems/SolutionsMB1 timeout

Mass separator magnet timed out. Tried reconfigure. Called Kyle from controls who power cycled the CANbus card. This resolved the issue


(From the Source tray swap out.) - AS

Tuesday, June 05, 2018, 11:25: BIAS / EZL / EE @ 52 / 24 / 2.8 kV. SPARK *knocked out optics, magnet & Turbo TMS:TP6. IV4 closed/opened/reset. TP6/optics restarted. Magnet still off.

Complete failure of the communications with the magnet.


Wednesday, June 06, 2018, 13:40: Canbus contoller was swapped by Kyle L from Controls group. The old card was dead and replaced with a new one. The magnet is back and running.

  666   Wednesday, June 06, 2018, 14:01 Aaron Schmidt      Problems/SolutionsEmittance scanner (E-rig) communication issues.

Wednesday, June 06, 2018, 13:50:

It was noted yesterday during the TM2 Source HV tests that the E-rig was not running accordingly through the beam.

Upon turning on the PS, there a 45 second or so delay before the needle drops to the right at +500V and the PS no longer responds. (similar issue in August 2016)


Wednesday, June 06, 2018, 14:20: Soft reboot on Emittance rig communication. (Reboot IOC - Kyle LeBlanc)

Wednesday, June 06, 2018, 14:30: Calibrate

test scan & park

Reference parameters. Dac in bottom right corner to control PS.

Enter: 100 on Dac -- Reads 100 - On PS

Enter: 200 on Dac -- Reads 200 - On PS

Enter: 0 on Dac -- Reads 0 - On PS

Enter: -200 on Dac -- Reads -200 - On PS

The reboot fixed the erig/scanner.

  667   Thursday, June 07, 2018, 09:21 Aaron Schmidt      Problems/SolutionsPump down empty chamber. Anode check

TM2 Source tray still in.

Thursday, June 07, 2018, 09:20: Roughing.

Thursday, June 07, 2018, 12:42: Turbo pumps started.


Friday, June 08, 2018, 08:00: Anode run to 15 A. Short still apparent.

Friday, June 08, 2018, 08:12: Ion gauge, Turbos off.

Friday, June 08, 2018, 08:55: Venting.

Friday, June 08, 2018, 09:45: Anode connection investigated. Short found on the bracket once the anode wire was disconnected from the back screw (Picture)

Friday, June 08, 2018, 10:00: Removed 9-pin bracket. (Top connector left connected to TS. (Picture)

New Anode 9-pin connection/wire to be installed on the bracket. Test in the cold lab.

Friday, June 08, 2018, 10:12: Roughing.

Friday, June 08, 2018, 11:14: Turbo pumps started.

Friday, June 08, 2018, 12:31: Ion gauge on.


Tuesday, June 12, 2018, 06:18: Ion gauge & Turbo pumps off.

Tuesday, June 12, 2018, 07:40: Venting.

Attachment 1: 20180608_100402.jpg
20180608_100402.jpg
Attachment 2: 20180608_100835.jpg
20180608_100835.jpg
Attachment 3: 20180608_100840.jpg
20180608_100840.jpg
Attachment 4: 20180613_080550.jpg
20180613_080550.jpg
Attachment 5: 20180613_080605.jpg
20180613_080605.jpg
  668   Tuesday, June 12, 2018, 11:38 Aaron Schmidt      In progressSource Tray re-installation

Re-installation of the ISAC Test Stand Source tray. The TM2 ST was removed.

Tuesday, June 12, 2018, 10:15: Disconnect Optics Tray. Set blocks.

-Continue with removal of TM2 Tray

Tuesday, June 12, 2018, 10:56: TM2 Tray Removed.

-Continue with installation of ISAC Test Stand Source Tray. Optics reconnect.

Tuesday, June 12, 2018, 11:25: Open line FS#8. No visible leaks found.

Tuesday, June 12, 2018, 11:37: Connect Source tray, optics tray, gas line, etc. Complete.

Tuesday, June 12, 2018, 14:37: Roughing.


Wednesday, June 13, 2018, 06:32: Turbo pumps on.

Wednesday, June 13, 2018, 06:37; Ion Gauge on.


He Leak TEST #1:

Cold Lab Leak detector. RGA unavailable.

Monday, June 18, 2018, 11:00  Vacuum @ 2.15e-06T

LD Base line before opening valve to turbo pumps: 0.0 to 5.6 e-11 atm-cc/sec

LD baseline after opening valve to turbo pumps: 8.e-10 atm-cc/sec

Full open base after five minutes:

Vacuum @ 2.18e-06T.

LD:  8.2e-09 atm-cc/sec

Monday, June 18, 2018, 11:05: Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes

Vacuum @ 2.15e-06T .

LD: 6.6e-09 atm-cc/sec. Purge and close FS#2.

Monday, June 18, 2018, 11:10: Open line FS#3 . Pressurize to 30 PSI.

Drop followed by Major SPIKE into e-04 vacuum.

Vacuum @ 1.5e-05T.

LD:  1.6e-04 atm-cc/sec. Confirmed leak on FS#3

Monday, June 18, 2018, 11:26: Continued Vacuum instability.

Halt leak test!

Monday, June 18, 2018, 11:30: Close port to LD.

Monday, June 18, 2018, 11:34: Vent and shut down LD. Ion gauge and turbos off.


Tuesday, June 19, 2018, 06:40: Venting.

C-seals replaced with O-rings on line FS#3 (E)(G)

Tuesday, June 19, 2018, 08:36: Re-install RGA

Continue C-Seal replacement. (F)(H)(K).

Tuesday, June 19, 2018, 09:00: Roughing.

Tuesday, June 19, 2018, 10:15: Turbo pumps on.

Tuesday, June 19, 2018, 10:19: Ion gauge on.

Tuesday, June 19, 2018, 10:28: RGA operational.


Thursday, June 21, 2018, 14:28 Vacuum @ 4.95e-07T

LD Base line before opening valve to turbo pumps: 0.0 e-11 atm-cc/sec

LD baseline after opening valve to turbo pumps: 3.3e-10 atm-cc/sec

Full open base after five minutes:

Vacuum @ 4.95e-07T. RGA ok

LD:  3.3e-08 atm-cc/sec

Thursday, June 21, 2018, 14:33 : Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes

Vacuum @ 4.76e-07T . RGA ok

LD: 3.3e-08 atm-cc/sec. Purge and close FS#4.

Thursday, June 21, 2018, 14:38: Open line FS#5 . Pressurize to 30 PSI.

Vacuum @ 4.76e-07T. RGA ok

LD:  3.6e-08 atm-cc/sec. 

Thursday, June 21, 2018, 14:43: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes

Vacuum @ 4.95e-07T . RGA ok

LD: 3.7e-08 atm-cc/sec.

Purge and close FS#3.

Thursday, June 21, 2018, 14:48: Open line all lines . Pressurize to 30 PSI. Record after 5 minutes

Vacuum @ 4.95e-07T . RGA ok

LD: 4.0e-08 atm-cc/sec.

Thursday, June 21, 2018, 14:53: Close port to LD.

Vent and shut down LD.

Purge He, Open with water.

Thursday, June 21, 2018, 14:58: Vacuum @ 5.04e-07T . RGA ok.

Thursday, June 21, 2018, 15:00: Power/sources on. Vacuum @ 5.04e-07T . RGA ok.


See Target  Heating - TS Elog 670.*

Monday, June 25, 2018, 09:10: Auto-cooling at 2A/min - AS.

Attachment 1: TS_Source_Tray_re-installed_2018_-_(Leak_found).docx
  669   Tuesday, June 19, 2018, 10:30 Aaron Schmidt      DoneRGA repair

Monday, June 18, 2018, 10:00: RGA removed from ISAC TS. Handed to Travis C. Communications issues found

Communications chip replaced.


 Tuesday, June 19, 2018, 08:36: Re-install RGA.

Tuesday, June 19, 2018, 10:29: RGA confirmed operational

  675   Monday, July 23, 2018, 14:25 Aaron SchmidtUC#23LP-FEBIAD-CTLITETM2  In progressConditioning Heat Shield for UC#23

Monday, July 23, 2018, 14:20: Roughing.

Monday, July 23, 2018, 14:54: Turbo pumps on. 


Tuesday, July 24, 2018, 06:40: Ion gauge on. Vacuum slowly decreasing

Tuesday, July 24, 2018, 07:20: RGA on.

Tuesday, July 24, 2018, 07:27: Waterlines opened. No response on RGA. Vacuum stable @ 2.24e-06T

Tuesday, July 24, 2018, 07:29: Power/sources on.

Tuesday, July 24, 2018, 07:34: Opening gas lines slowly.

Tuesday, July 24, 2018, 07:36: SV2 & SV5 Open.

Tuesday, July 24, 2018, 07:43: SV3 Open. 

Tuesday, July 24, 2018, 07:47: SV4 Open. 

Tuesday, July 24, 2018, 09:00: Turn off sources/power and check 9-pin in the back of the TS. OK

Tuesday, July 24, 2018, 09:20: Restart sources/power. Gases open.

Tuesday, July 24, 2018, 13:39: Auto-ramping TGHT / TBHT to 500 / 275 A @ 2A per min.

Tuesday, July 24, 2018, 13:45: BIAS / EZL / EE @ 30  / 13 / -1.5 kV.

Tuesday, July 24, 2018, 13:46: IV4 opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.4 3.92
 TBHT 26.9 3.08
 COIL + EE 26.1 5.00
 TGHT  26.5 5.64

Tuesday, July 24, 2018, 13:48: Optics set.


Note* Approx 10 sparks noted during auto-ramping. All occurred between 12:30am - 4:00am today.

Wednesday, July 25, 2018, 06:35: Auto-ramping is ongoing since it was started yesterday. Auto-ramping TGHT / TBHT to 500 / 275 A @ Vacuum limited rate

TGHT / TBHT @ 310 / 275. Significant out gassing noted adjusting the ramping rate.

Wednesday, July 25, 2018, 06:40: Auto-ramp halted. Auto-ramping TGHT / TBHT to 580 / 285 (290 w/ direct readout) A @ Vacuum limited rate. Restart auto-ramp.

Wednesday, July 25, 2018, 11:25: Increased good ramping limit to 2E-6 Torr - AM

Wednesday, July 25, 2018, 11:28: ANODE voltage to 200 V, 11 mA current read back


Thursday, July 26, 2018, 08:08: RGA Restarted

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 35.6 3.86
 TBHT 26.8 3.06
 COIL + EE 26.5 5.03
 TGHT 28.6 5.65

Thursday, July 26, 2018, 08:13: EZL to 13.4 kV

Thursday, July 26, 2018, 08:19: Coil @ 20 A.

Thursday, July 26, 2018, 08:29: Coil @ 30 A. TBHT @ 300A.

Thursday, July 26, 2018, 08:35: Coil @ 40 A.

Thursday, July 26, 2018, 08:41: Coil @ 50 A.

Thursday, July 26, 2018, 14:33: auto-cooling @ 2 A per min

Thursday, July 26, 2018, 14:45: Coil @ 0 A.


Friday, July 27, 2018, 08:29: Gas lines closed

Friday, July 27, 2018, 08:32: Sources off.

Friday, July 27, 2018, 08:34: RGA off. IV4 closed

Friday, July 27, 2018, 08:36: Ion gauge & turbos off.

Friday, July 27, 2018, 08:39: Power off. Waterlines purged.

Attachment 1: UC#23_emit.dat_error.docx
Attachment 2: TS-2018-07-2-08-07.rga
Attachment 3: TS-2018-07-24-07-20.rga
Attachment 4: UC#23.docx
  677   Friday, August 10, 2018, 10:56 Aaron Schmidt      Problems/SolutionsNew PS installation and Cathode BIAS set

Friday, August 10, 2018, 10:25: Remove TBHT 500 PS and replace with TBHT 600 PS.

Friday, August 10, 2018, 10:50: Switch wiring in the high voltage cage from and Anode BIAS to Cathode BIAS setting.

Friday, August 10, 2018, 11:32: TBHT limit increased from 500A to 600A by Controls group.

 Friday, August 10, 2018, 11:34: TBHT tested manually. Operation is satisfactory.

  679   Tuesday, August 21, 2018, 12:54 Anders Mjos      Problems/Solutions9-pin connection configuration

Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders

Grounded     X            
Source Tray Side (looking head on) 1 2 3 4 5 6 7 8 9
High Voltage Cage Side 5 4 3 2 1 9 8 7 6

 

  681   Wednesday, August 29, 2018, 11:36 Aaron Schmidt       Epics / putty crash.

Wednesday, August 29, 2018, 11:35: EPIC's crashed.... epically.

Unable to restart Putty or TS controls.

  682   Friday, August 31, 2018, 10:16 Aaron Schmidt      Problems/SolutionsRGA connection loss.

Friday, August 31, 2018, 10:10: The RGA will not re-connect to the computer. Manually turned it off while under vacuum to protect the filament before shutting down the turbo pumps.

Friday, August 31, 2018, 10:15: Ion gauge & turbo pumps off.


Wednesday, September 05, 2018, 10:00: Communications chip replaced by RH (Travis C.)

Wednesday, September 05, 2018, 10:40: Computer restarted to reconnect/reboot.

Wednesday, September 05, 2018, 11:05: RGA started

  685   Monday, September 17, 2018, 11:52 Aaron SchmidtUC#25LP-SISITWTM2 42752-9In progressConditioning Heat Shield for UC#25

Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd 

Monday, September 17, 2018, 11:51: Roughing. Doors sealed

Monday, September 17, 2018, 12:30: Turbo pumps started.

Monday, September 17, 2018, 14:09: RGA on.


Tuesday, September 18, 2018, 09:01: Waterlines opened. No response on RGA. Vacuum ok @ 5.92e-07T.

Tuesday, September 18, 2018, 09:02: Power on

Tuesday, September 18, 2018, 09:05: Sources on.

Tuesday, September 18, 2018, 09:08: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.8 4.02
 TBHT 24.4 3.11
 COIL + EE 24.6 5.15
 TGHT  24.6 5.79

 


Wednesday, September 19, 2018, 08:14: Vacuum @ 7.73e-07T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 34.8 4.02
 TBHT 24.7 3.10
 COIL + EE 24.9 5.13
 TGHT  26.8 5.77

 Wednesday, September 19, 2018, 14:30: Auto-cooling @ 2A per min.


Friday, September 21, 2018, 07:52: Power / Sources off.

Friday, September 21, 2018, 07:53: RGA off. Ion Gauge off. Turbo pumps off.

Friday, September 21, 2018, 07:56: Waterlines purged. TS locked out.

 

 

Attachment 1: OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlp
Attachment 2: TS-2018-09-17-14-10.rga
Attachment 3: UC#25.docx