650
|
Tuesday, March 20, 2018, 09:14 |
Aaron Schmidt | | | | | | | Problems/Solutions | Optics issue | Tuesday, March 20, 2018, 09:11: TMS:Q5
& TMS:Q2 controllers require repair.
Unable to hold a negative voltage. |
|
652
|
Thursday, March 29, 2018, 10:58 |
Carla Babcock | | | | | | | | | Started with Anode at 25V and coil at 0A,
bias at 30kV. (attachment 1)
Ramped coil to 60A (0.4V) (attachment |
6x |
653
|
Wednesday, April 11, 2018, 10:19 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Wednesday, April 11, 2018, 10:19: Roughing |
|
655
|
Tuesday, April 17, 2018, 11:02 |
Aaron Schmidt | | | | | | | Done | Roughing pump issue. | Tuesday, April 17, 2018, 10:57: Vacuum
not coming down. @ 1.514T . Backing valves
have been closed. |
|
656
|
Thursday, April 19, 2018, 12:55 |
Fernando Maldonado | | | | | | | Done | Re-wiring Anode PS | Thursday, April 19, 2018, 12:52: Pin J1
was reconnected into the anode power supply.
All jumpers were put back to remote control. |
|
657
|
Friday, April 20, 2018, 13:20 |
Carla Babcock | | | | | | | Done | BIAS* fan sounds like it is dying | The fan in the EZL power supply is making
a terrible noise - keep an eye on it, it
sounds like it might give up soon. |
|
661
|
Tuesday, May 22, 2018, 08:48 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:TP1A not running | Pump found off on Tuesday morning.
Tuesday, May 22, 2018, 08:40: Starting
TP1A |
|
662
|
Thursday, May 24, 2018, 08:38 |
Anders Mjos | | | | | | | Problems/Solutions | Venting beamline for IG6 replacement | Thursday, May 24, 2018, 08:38: TPs stopped
Thursday, May 24, 2018, 09:18: Venting
Thursday, May 24, 2018, 14:30: IG6 |
|
663
|
Thursday, May 24, 2018, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured FEBIAD coil for testing new source tray | Thursday, May 24, 2018: Configured coil
to be (-) E&F, (+) G&H. Water should
be supplied to both terminals in either configuration. |
|
665
|
Monday, June 04, 2018, 16:02 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 timeout | Mass separator magnet timed out. Tried
reconfigure. Called Kyle from controls who
power cycled the CANbus card. This resolved |
|
666
|
Wednesday, June 06, 2018, 14:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Emittance scanner (E-rig) communication issues. | Wednesday, June 06, 2018, 13:50:
It was noted yesterday during the
TM2 Source HV tests that the E-rig was not |
|
667
|
Thursday, June 07, 2018, 09:21 |
Aaron Schmidt | | | | | | | Problems/Solutions | Pump down empty chamber. Anode check | TM2 Source tray still in.
Thursday, June 07, 2018, 09:20: Roughing.
Thursday, June 07, 2018, 12:42: Turbo |
|
668
|
Tuesday, June 12, 2018, 11:38 |
Aaron Schmidt | | | | | | | In progress | Source Tray re-installation | Re-installation of the ISAC Test Stand
Source tray. The TM2 ST was removed.
Tuesday, June 12, 2018, 10:15: Disconnect |
|
669
|
Tuesday, June 19, 2018, 10:30 |
Aaron Schmidt | | | | | | | Done | RGA repair | Monday, June 18, 2018, 10:00: RGA removed
from ISAC TS. Handed to Travis C. Communications
issues found |
|
675
|
Monday, July 23, 2018, 14:25 |
Aaron Schmidt | UC#23 | LP-FEBIAD-CTL | ITE | TM2 | | | In progress | Conditioning Heat Shield for UC#23 | Monday, July 23, 2018, 14:20: Roughing.
Monday, July 23, 2018, 14:54: Turbo
pumps on. |
|
677
|
Friday, August 10, 2018, 10:56 |
Aaron Schmidt | | | | | | | Problems/Solutions | New PS installation and Cathode BIAS set | Friday, August 10, 2018, 10:25: Remove
TBHT 500 PS and replace with TBHT 600 PS.
Friday, August 10, 2018, 10:50: Switch |
|
679
|
Tuesday, August 21, 2018, 12:54 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connection configuration | Pin configuration between top 9-pin connector
on Source Tray and terminal in high voltage
rack. Measured 2018-08-21 by Aaron and Anders |
|
681
|
Wednesday, August 29, 2018, 11:36 |
Aaron Schmidt | | | | | | | | Epics / putty crash. | Wednesday, August 29, 2018, 11:35: EPIC's
crashed.... epically.
Unable to restart Putty or TS controls. |
|
682
|
Friday, August 31, 2018, 10:16 |
Aaron Schmidt | | | | | | | Problems/Solutions | RGA connection loss. | Friday, August 31, 2018, 10:10: The RGA
will not re-connect to the computer. Manually
turned it off while under vacuum to protect |
|
685
|
Monday, September 17, 2018, 11:52 |
Aaron Schmidt | UC#25 | LP-SIS | ITW | TM2 | | 42752-9 | In progress | Conditioning Heat Shield for UC#25 | Monday, September 17, 2018, 11:47: Roughing*.
Doors not sealing, help acq'd
Monday, September 17, 2018, 11:51: |
|
|