ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  385   Monday, June 16, 2014, 09:12 Anders Mjos      In progressEmpty chamberMonday, June 16, 2014, 09:12: Roughing

Tuesday, June 17, 2014, 14:38:
Venting 
  
  391   Tuesday, July 08, 2014, 09:05 Anders Mjos      In progressEmpty chamberTuesday, July 08, 2014, 09:05: Roughing
Tuesday, July 08, 2014, 13:23: Starting
turbos
  
  395   Wednesday, July 23, 2014, 14:34 Anders Mjos      In progressEmpty chamberWednesday, July 23, 2014, 14:34: Roughing
Wednesday, July 23, 2014, 15:03: Starting
turbos.
  
  432   Tuesday, March 24, 2015, 09:50 Anders Mjos      In progressEmpty chamberRoughed down on Friday 20th
Tuesday, March 24, 2015, 09:49: Turbos
started
  
  922   Monday, May 02, 2022, 14:10 Aaron Schmidt P2N-SIS     Empty Chamber PS test.No P2N is loaded. Testing the power supplies.
Tuesday, May 03, 2022, 10:07
In the past few days, the ITS has
  
  883   Monday, June 28, 2021, 09:22 Aaron Schmidt       Empty ChamberMonday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B
on.
  
  320   Tuesday, July 16, 2013, 15:39 Anders Mjos       EmptyTuesday, July 16, 2013, 15:39: Roughing
Tuesday, July 16, 2013, 16:01: Starting
turbos.
  
  545   Tuesday, October 11, 2016, 14:55 Anders Mjos      In progressEmptyBreaker tripped during roughing. Removed
exhaust line during first 2 min.
Tuesday, October 11, 2016, 14:55:
  
  531   Friday, August 12, 2016, 14:40 Aaron Schmidt      Problems/SolutionsEmittance scanner communicationsWednesday, July 27, 2016, 16:06:  Spark
around 15:10 or 16:05
Emittance rig communications affected.
  
  517   Friday, June 24, 2016, 08:07 Aaron Schmidt       Emittance scanner check/repair.Friday, June 24, 2016, 08:06: Ion gauge
IG6 OFF. Turbo pumps TP6 and TP2 off.
Friday, June 24, 2016, 09:58: Venting.
  
  520   Wednesday, July 06, 2016, 10:42 Anders Mjos      Problems/SolutionsEmittance scanner check/repair.Dave Morris increased the current from
~ 1 A to ~2.5 A. This seem to solve the problem
with the in/out drive of the emittance meter
  
  666   Wednesday, June 06, 2018, 14:01 Aaron Schmidt      Problems/SolutionsEmittance scanner (E-rig) communication issues.Wednesday, June 06, 2018, 13:50:
It was noted yesterday during the
TM2 Source HV tests that the E-rig was not
  
  788   Wednesday, March 04, 2020, 17:15 Fernando Maldonado      Problems/SolutionsEmittance rig communicationWednesday, March 04, 2020, 17:13: EPICS
page indicated a sucesful scan but data was
empty.
  
  863   Wednesday, March 10, 2021, 14:57 Aaron Schmidt HP-FEBIAD   42752-5In progressEmittance meter test with FEBIADWednesday, March 10, 2021, 14:54: Roughing.
Wednesday, March 10, 2021, 14:57:
BV1A open.
  
  359   Wednesday, February 05, 2014, 11:27 Anders Mjos      Problems/SolutionsEmittance Rig installationWednesday, February 05, 2014, 11:27 : Stopped
turbos

    2x spacers ITD0468 1/8"
 Spacers_Installed.jpgEmittance_Rig_Inside.jpgEmittance_Rig_Outside.jpg 
  366   Friday, March 21, 2014, 14:12 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2The performance of the roughing pump has
gradually gone down. Notably after the system
has been vented. See attached screenshot
 TMSCG2_2014-03-21.png 
  383   Thursday, June 12, 2014, 09:28 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2

    

       
            
  
  631   Thursday, February 08, 2018, 16:54 Carla Babcock       EZL strange behaviourThursday, February 08, 2018, 16:54
Testing the HV bias I found that
the einzel lens was behaving strangely. When
  
  714   Tuesday, March 26, 2019, 10:44 Aaron Schmidt      Problems/SolutionsEZL PS replaced. TestEZL checked. OK @ 5kV
BIAS PS issues.
2.3kV on screen. Read back on PS
 New_EZL_PS_testing_-_2019.docx 
  210   Monday, September 24, 2012, 10:31 Anders Mjos      Problems/SolutionsEPICS whiteout Test stand was off this morning and
EPICS controls in "white-out".
Controls is looking into it.
  