ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  385   Monday, June 16, 2014, 09:12 Anders Mjos      In progressEmpty chamber

Monday, June 16, 2014, 09:12: Roughing


Tuesday, June 17, 2014, 14:38: Venting 

  391   Tuesday, July 08, 2014, 09:05 Anders Mjos      In progressEmpty chamber

Tuesday, July 08, 2014, 09:05: Roughing

Tuesday, July 08, 2014, 13:23: Starting turbos

Tuesday, July 08, 2014, 13:30 : Turbos at speed

Tuesday, July 08, 2014, 13:33 : Vacuum at 2.8E-6 T

  395   Wednesday, July 23, 2014, 14:34 Anders Mjos      In progressEmpty chamber

Wednesday, July 23, 2014, 14:34: Roughing
Wednesday, July 23, 2014, 15:03: Starting turbos.
Wednesday, July 23, 2014, 15:11: Turbos at speed
Wednesday, July 23, 2014, 15:13: Vacuum at 7.4E-6 T

  432   Tuesday, March 24, 2015, 09:50 Anders Mjos      In progressEmpty chamber

Roughed down on Friday 20th

Tuesday, March 24, 2015, 09:49: Turbos started

Tuesday, March 24, 2015, 09:59: Turbos at speed. Vacuum at 2.8E-6 T


EPICS could not communicate with devices. Contacted controls (Dave M)

Thursday, April 02, 2015, 14:45: Stopped turbos.

Thursday, April 02, 2015, 15:10: Started venting through turbo pump (to 16 T)

Thursday, April 02, 2015, 15:12: Venting through VV1

  922   Monday, May 02, 2022, 14:10 Aaron Schmidt P2N-SIS     Empty Chamber PS test.

No P2N is loaded. Testing the power supplies.

Tuesday, May 03, 2022, 10:07

In the past few days, the ITS has been reconfigured for P2N operation:

  •  The two ATTS PS were moved to the ITS rack, one on top of the TGHT and the other instead of the COIL
  • AC rewiring was necessary since the breakers were not connected to the wires. Marshall was on it and re-connected
  • Ray has configured the ATTS PLC to be compatible with P2N operation in ITS
  • The controls cables to the MASTER and SLAVE supplies have been configured: the cables come from the front of the PS rack, so we could close the back and top cage if we wanted. One control cable was connected to the relay to send the proper ENABLE signal only when the ITS vacuum and water flow are OK
  • DC cables re-routed for P2N parallel operation:
    MASTER+ = D
    MASTER- = C
    SLAVE+ = E,G 
    SLAVE- = F,H
    TBHT+ = A
    TBHT- = B

Wednesday, May 04, 2022, 07:54: PS main shutoff. IG1 & Turbo pumps off.

  883   Monday, June 28, 2021, 09:22 Aaron Schmidt       Empty Chamber

Monday, June 28, 2021, 09:22: Roughing.

Monday, June 28, 2021, 10:10: TP1B on.

Monday, June 28, 2021, 10:22: TP1A on (Tripped)

Monday, June 28, 2021, 10:30: Both turbo pumps off. Leave it under a rough vacuum.


Fernando

Wednesday, June 30, 2021, 15:09 : Venting

  320   Tuesday, July 16, 2013, 15:39 Anders Mjos       Empty

Tuesday, July 16, 2013, 15:39: Roughing

Tuesday, July 16, 2013, 16:01: Starting turbos.

Tuesday, July 16, 2013, 16:10: Turbos at speed.

Tuesday, July 16, 2013, 16:11: Vacuum at 6.9E-6 T

  545   Tuesday, October 11, 2016, 14:55 Anders Mjos      In progressEmpty

Breaker tripped during roughing. Removed exhaust line during first 2 min.

Tuesday, October 11, 2016, 14:55: Turbos at speed. Vacuum at 1.0E-6 T


Wednesday, October 12, 2016, 12:09: Ion gauge & Turbo pumps off.

Wednesday, October 12, 2016, 13:52: Venting

  531   Friday, August 12, 2016, 14:40 Aaron Schmidt      Problems/SolutionsEmittance scanner communications

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05

Emittance rig communications affected.

Enter 100 on Dac -- Reads: -500

Enter -100 on Dac -- Reads: -500. No response

@ 10V


Friday, August 12, 2016, 15:53: Soft reboot on Emittance rig communications

Calibrate

test scan & park

Enter: 100 on Dac -- Reads 100

Enter: 200 on Dac -- Reads 200

Enter: 0 on Dac -- Reads 0

Enter: -200 on Dac -- Reads -200

Fixed

  517   Friday, June 24, 2016, 08:07 Aaron Schmidt       Emittance scanner check/repair.

Friday, June 24, 2016, 08:06: Ion gauge IG6 OFF. Turbo pumps TP6 and TP2 off.

Friday, June 24, 2016, 09:58: Venting.

Friday, June 24, 2016, 10:17: Remove emittance scanner for inspection.

Friday, June 24, 2016, 10:20: Roughing.

Disassemble, inspect.

Move bearing along screw. Acetone to break down old grease. Wiped clean. Move bearing back and forth, use pick to remove dirt. Re-grease.

Clean, and reassemble.

Test emittance scanner (outside of vacuum) . Draw in OK. Draw out OK.

Friday, June 24, 2016, 13:35: Venting.

Install emittance scanner.

Friday, June 24, 2016, 14:10: Roughing.

Test. Draws in fine. Draw out fails 3/4 of the way back up.

Friday, June 24, 2016, 14:32: Turbo pumps started.

Friday, June 24, 2016, 14:37: Ion gauge on.

Work to continue when more information is found on emittance scanner motor & history.

  520   Wednesday, July 06, 2016, 10:42 Anders Mjos      Problems/SolutionsEmittance scanner check/repair.

Dave Morris increased the current from ~ 1 A to ~2.5 A. This seem to solve the problem with the in/out drive of the emittance meter

  666   Wednesday, June 06, 2018, 14:01 Aaron Schmidt      Problems/SolutionsEmittance scanner (E-rig) communication issues.

Wednesday, June 06, 2018, 13:50:

It was noted yesterday during the TM2 Source HV tests that the E-rig was not running accordingly through the beam.

Upon turning on the PS, there a 45 second or so delay before the needle drops to the right at +500V and the PS no longer responds. (similar issue in August 2016)


Wednesday, June 06, 2018, 14:20: Soft reboot on Emittance rig communication. (Reboot IOC - Kyle LeBlanc)

Wednesday, June 06, 2018, 14:30: Calibrate

test scan & park

Reference parameters. Dac in bottom right corner to control PS.

Enter: 100 on Dac -- Reads 100 - On PS

Enter: 200 on Dac -- Reads 200 - On PS

Enter: 0 on Dac -- Reads 0 - On PS

Enter: -200 on Dac -- Reads -200 - On PS

The reboot fixed the erig/scanner.

  788   Wednesday, March 04, 2020, 17:15 Fernando Maldonado      Problems/SolutionsEmittance rig communication

Wednesday, March 04, 2020, 17:13: EPICS page indicated a sucesful scan but data was empty.

Wednesday, March 04, 2020, 17:13: Power suppply didn't respond to the voltage sweep

Wednesday, March 04, 2020, 17:14: Problem most likely similar to elog entry 531.

Wednesday, March 04, 2020, 17:14: Keiko contacted for a soft reboot.

Wednesday, March 04, 2020, 17:14: Emittance power supply now  responds.

  863   Wednesday, March 10, 2021, 14:57 Aaron Schmidt HP-FEBIAD   42752-5In progressEmittance meter test with FEBIAD

Wednesday, March 10, 2021, 14:54: Roughing.

Wednesday, March 10, 2021, 14:57: BV1A open.


Thursday, March 11, 2021, 09:41: TP1B on. 

Thursday, March 11, 2021, 09:44: TP1A on. 

Thursday, March 11, 2021, 09:52: IG1 on. 


Monday, March 15, 2021, 07:50: Vacuum @ 6.91e-07T. Open waterlines.

Monday, March 15, 2021, 07:52: Vacuum ok.

Monday, March 15, 2021, 07:55: Power / sources on.

Monday, March 15, 2021, 07:56: TGHT / TBHT @ 10 A.

Monday, March 15, 2021, 07:57: BIAS / EE / EZL @ 1 / 0.5 / 1 kV. Anode @ 25 V. Coil @ 5 A.

Monday, March 15, 2021, 08:02: All sources ok. Set back to 0. Ready for remote operation. Await word from MCR on Cu DI water system.

ref: https://elog.triumf.ca/TIS/Test-Stand/864


Tuesday, March 16, 2021, 09:53: IV4 Open

  359   Wednesday, February 05, 2014, 11:27 Anders Mjos      Problems/SolutionsEmittance Rig installation

Wednesday, February 05, 2014, 11:27 : Stopped turbos

  • 2x spacers ITD0468 1/8" THK installed to shift the wire scanner screen closer to the wire scanner. (ITD0469 1/16" THK spacers not used).
  • Emittance Rig installed. Manually actuated from out -> in -> out position. No interference observed.
  • Replaced two insulators on wire scanner screens that broke in the installation process. New insulators kindly donated from ISIS.

By Anders and Ayan.

Wednesday, February 05, 2014, 16: Roughing


Thursday, February 06, 2014, 08:42: Turbos started

Thursday, February 06, 2014, 08:50: Turbos at speed. IG6 6.2E-6 T, IG1 1.3 E-6 T

  366   Friday, March 21, 2014, 14:12 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2

The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.

E-fault 7258.

 

  383   Thursday, June 12, 2014, 09:28 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2

Anders Mjos wrote:

The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.

E-fault 7258.

 

 Edi replaced the backing pump on June 5th.

  631   Thursday, February 08, 2018, 16:54 Carla Babcock       EZL strange behaviour

Thursday, February 08, 2018, 16:54

Testing the HV bias I found that the einzel lens was behaving strangely. When I tried to put it higher than 1kV, the current would start spiking from 12uA to > 100uA. The voltage would jump around quite a bit as well (+/- 100V). Everything seems the way it was before, except the EZL power supply is still connected in parallel with the old bias power supply, which is no longer powered. Maybe one of the transorbs connecting line and neutral on the bias side is fried? I will unhook the connection to the old PSU and try again.

 

 

  714   Tuesday, March 26, 2019, 10:44 Aaron Schmidt      Problems/SolutionsEZL PS replaced. Test

EZL checked. OK @ 5kV

BIAS PS issues.

2.3kV on screen. Read back on PS 3kV. Direct measurement reads 5.8 kV

Readback does not increase with the controls. Stops at 2.4kV & the current climbs very quickly.

Tuesday, March 26, 2019, 11:00: EZL PS routed to TS BIAS, but still controlled via EZL controls. EZL line grounded.

Brought up to 20kV, no sparks. 

New EZL PS confirmed ok. BIAS PS has issues.

  210   Monday, September 24, 2012, 10:31 Anders Mjos      Problems/SolutionsEPICS whiteout

 Test stand was off this morning and EPICS controls in "white-out". Controls is looking into it.

Update  13:51:

Controls have reestablished contact with the PLC.