  26   Tuesday, December 13, 2011, 14:10 Aurelia Laxdal       Test Stand IOC rebootEvgeniy rebooted the ISAC Test Stand IOC.
Re-started EPICS at the Test Stand.
Found all 4 turbo pumps off and their
  
  27   Monday, December 19, 2011, 13:09 Aurelia Laxdal       Test Stand updatesIn January Controls will install a new
firewall for ISAC Test Stand. Until then
ISAC Test Stand can be used, but it may require
  
  29   Friday, January 20, 2012, 10:37 Friedhelm Ames       vacuum pumps shut offturbo pumps shut off due to work on
cooling water system
  
  30   Tuesday, January 24, 2012, 09:44 Friedhelm Ames       turbo pumps restartedAll turbo pumps have been restarted after
cooling water is back and running.
 
  
  37   Tuesday, February 28, 2012, 11:04 Pierre Bricault         Calibrating the gas valve   
  40   Tuesday, February 28, 2012, 16:32 Brandon Humphries       Initial settings for FEBIAD on Test StandISAC Test Stand FEBIAD Ion Source and ISACT
optics screen grabs before practicing tuning. 
Tune saved as: data/febiaddata/tune/120228-1620_0.snap
 grab.V13332.pnggrab.m13336.png 
  41   Wednesday, February 29, 2012, 09:43 Friedhelm Ames       checking gas inlet valve for FEBIAD    
  42   Wednesday, February 29, 2012, 15:08 Friedhelm Ames       connected Al(CH3)3connected A(CH3)3 instead of He, pumped
line and valve with pump on the high voltage
rack.. Opened regulating valve first response
  
  43   Wednesday, February 29, 2012, 17:22 Friedhelm Ames       mass scan mass scan with valve at 7.2 to let in Al(CH3)3
saved as
plotdump-local-clean.txt_Feb29_12_17-19-20.txt


 grab.BI5978.png 
  44   Wednesday, February 29, 2012, 17:26 Friedhelm Ames       gas inlet valves closed    
  45   Thursday, March 01, 2012, 17:04 Friedhelm Ames       new mass scanbigger mass scan after separator optimization
and with finer step size
 
 grab.S19441.png 
  46   Thursday, March 01, 2012, 17:05 Friedhelm Ames       start heater ramping down    
  47   Thursday, March 01, 2012, 17:09 Friedhelm Ames       new mass scan


   
        
            
  
  48   Thursday, March 01, 2012, 17:10 Friedhelm Ames       start ramping down of heaters    
  50   Friday, March 02, 2012, 13:28 Anders MjosFEBIAD test      Venting test standVenting for target exchange   
  51   Monday, March 05, 2012, 14:41 Friedhelm Ames       vacuum and optics switched offvacuum and optics at teststand switched
off to allow work on the water cooling system.
  
  53   Tuesday, March 06, 2012, 15:15 Pierre Bricault HP-SIS     ISAC test stand two turbos replacedVac group has replaced the two turbo pumps.   
  54   Tuesday, March 06, 2012, 15:17 Pierre Bricault       ISAC test standStart turbo pumps at 1514H   
  55   Tuesday, March 06, 2012, 15:25 Pierre Bricault       ISAC test standTurbos at full speed. P = 1.5E-05 T   
  56   Tuesday, March 06, 2012, 15:51 Friedhelm Ames       turbopumps in mass separator section started    