41
|
Wednesday, February 29, 2012, 09:43 |
Friedhelm Ames | | | | | | | | checking gas inlet valve for FEBIAD |
|
|
42
|
Wednesday, February 29, 2012, 15:08 |
Friedhelm Ames | | | | | | | | connected Al(CH3)3 |
connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve set point at 7.0. |
|
43
|
Wednesday, February 29, 2012, 17:22 |
Friedhelm Ames | | | | | | | | mass scan |
mass scan with valve at 7.2 to let in Al(CH3)3 saved as
plotdump-local-clean.txt_Feb29_12_17-19-20.txt
|
Attachment 1: grab.BI5978.png
|
|
|
44
|
Wednesday, February 29, 2012, 17:26 |
Friedhelm Ames | | | | | | | | gas inlet valves closed |
|
|
45
|
Thursday, March 01, 2012, 17:04 |
Friedhelm Ames | | | | | | | | new mass scan |
bigger mass scan after separator optimization and with finer step size
|
Attachment 1: grab.S19441.png
|
|
|
46
|
Thursday, March 01, 2012, 17:05 |
Friedhelm Ames | | | | | | | | start heater ramping down |
|
|
47
|
Thursday, March 01, 2012, 17:09 |
Friedhelm Ames | | | | | | | | new mass scan |
Friedhelm Ames wrote: |
bigger mass scan after separator optimization and with finer step size
|
total curren on Fc0 183 nA gas valves SV2/5 open leak valve at 7.2 SV1 closed |
|
48
|
Thursday, March 01, 2012, 17:10 |
Friedhelm Ames | | | | | | | | start ramping down of heaters |
|
|
50
|
Friday, March 02, 2012, 13:28 |
Anders Mjos | FEBIAD test | | | | | | | Venting test stand |
Venting for target exchange |
|
51
|
Monday, March 05, 2012, 14:41 |
Friedhelm Ames | | | | | | | | vacuum and optics switched off |
vacuum and optics at teststand switched off to allow work on the water cooling system. |
|
53
|
Tuesday, March 06, 2012, 15:15 |
Pierre Bricault | | HP-SIS | | | | | | ISAC test stand two turbos replaced |
Vac group has replaced the two turbo pumps. |
|
54
|
Tuesday, March 06, 2012, 15:17 |
Pierre Bricault | | | | | | | | ISAC test stand |
Start turbo pumps at 1514H |
|
55
|
Tuesday, March 06, 2012, 15:25 |
Pierre Bricault | | | | | | | | ISAC test stand |
Turbos at full speed. P = 1.5E-05 T |
|
56
|
Tuesday, March 06, 2012, 15:51 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started |
|
|
58
|
Wednesday, March 07, 2012, 10:36 |
Paul Mocock | | | | | | | | HV conditioning begins. |
HV conditioning has begins. Vacuum chamber pressure is currently 3.2e-07 Torr on TSG:IG1. |
|
59
|
Wednesday, March 07, 2012, 13:48 |
Friedhelm Ames | Nb#6 | | | | | | | high voltage conditioning |
High voltage conditioning has been started by ISAC ops. Einzel lens is unstable below 5 kV., o.k. above this. |
|
60
|
Wednesday, March 07, 2012, 17:44 |
Friedhelm Ames | Nb#6 | | | | | | | ramping up heaters |
ramping up heaters has been started by ISAC ops. |
|
61
|
Thursday, March 08, 2012, 09:14 |
Friedhelm Ames | Nb#6 | | | | | | | continue target heating |
continue target heating up to 580 A. Strip tool for the heating up to 300A from yesyerday see below |
Attachment 1: grab.K26109.png
|
|
|
62
|
Thursday, March 08, 2012, 14:08 |
Friedhelm Ames | Nb#6 | | | | | | | heater ramped up |
heaters have reached final values TGHT 580 A, TBHT 230 A, some sparking during ramp up. see strip tool image attached |
Attachment 1: grab.Z27253.png
|
|
|
63
|
Thursday, March 08, 2012, 17:16 |
Friedhelm Ames | Nb#6 | | | | | | | mass scan started |
|