929
|
Friday, May 27, 2022, 07:19 |
Fernando Maldonado | | | | | | | Done | FEBIAD parameter scan web-app and brief description (with links) | A web-app for systematic FEBIAD parametrizations
has been develop and now includes the
ISAC Test Stand (ITS) : |
|
980
|
Monday, September 25, 2023, 16:31 |
Aaron Schmidt | Ta#66 | LP-SIS | ITW | TM2 | 45220-5 | 45235-9 | Done | Conditioning Ta#66 & HV Tests. | Thermocouples installed on the left end
plate x 2.
Monday, September 25, 2023, 16:23: |
|
987
|
Tuesday, December 12, 2023, 12:41 |
Aaron Schmidt | | | | | | | Done | Source Tray / TS inspection | Tuesday, December 12, 2023, 12:39: Visual
inspection.
Source tray: OK. Minor cracks on |
|
989
|
Thursday, January 18, 2024, 10:44 |
Aaron Schmidt | | | | | | | Done | Thermal tests 2 | December 18 - January 15. Were not logged.
Placed holder. Aurelia's tests. Included
thermocouples in the oven & ionizer. |
|
1000
|
Thursday, April 04, 2024, 10:38 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | Done | Mass marker testing | Thursday, April 04, 2024, 09:49:
Target inserted yesterday, April 3. mass
marker tube connections carefully confirmed. |
|
1012
|
Tuesday, July 23, 2024, 09:43 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | Done | mass marker - reservoir testing | Wednesday, July 22, 2024, 11:41 -
target installed
Wednesday, July 22, 2024, 13:31 - |
|
1020
|
Friday, September 06, 2024, 12:08 |
Dave Neilson | | | | | | | Done | Test Stand repair/update | Friday, September 06, 2024: New TSH:TGHT
power supply has been installed and is now
functional. Magna-Power TSD-900/208. The |
|
1033
|
Tuesday, December 03, 2024, 14:55 |
Dave Neilson | | | | | | | Done | Power supply changed to CATHODE mode (-) | Tuesday, December 03, 2024, 14:55 ANODE/CATHODE
power supply switched to cathode mode, NEGATIVE |
|
1042
|
Tuesday, December 17, 2024, 16:09 |
Dave Neilson | | | | | | | Done | Anode,TGHT, TBHT power supply investigation. Resolved | Note, ground and HVC (high voltage
common) are used interchangeably here.
|
|
1
|
Wednesday, June 29, 2011, 15:30 |
John Wong | | | | | | | | Testing Yield station elog | ABC 123 blah blah blah... |
|
4
|
Thursday, September 15, 2011, 09:20 |
Anders Mjos | | | | | | | | ISAC TestStand old e-log | link
to old e-log |
|
9
|
Friday, September 23, 2011, 15:38 |
Rick Maharaj | | | | | | | | test stand vented | Test stand vented |
|
14
|
Wednesday, September 28, 2011, 14:11 |
Friedhelm Ames | SiC#26 | | ITE | TM4 | | | | gas system checked and pumped | The gas system has been checked. The variable
valve opens at about 7.55 very fast. Please
be careful when using it. Stepsize for opening |
|
22
|
Thursday, October 13, 2011, 12:33 |
Rick Maharaj | Training | | | | | | | Test stand vented | test stand vented |
|
26
|
Tuesday, December 13, 2011, 14:10 |
Aurelia Laxdal | | | | | | | | Test Stand IOC reboot | Evgeniy rebooted the ISAC Test Stand IOC.
Re-started EPICS at the Test Stand.
Found all 4 turbo pumps off and their |
|
27
|
Monday, December 19, 2011, 13:09 |
Aurelia Laxdal | | | | | | | | Test Stand updates | In January Controls will install a new
firewall for ISAC Test Stand. Until then
ISAC Test Stand can be used, but it may require |
|
29
|
Friday, January 20, 2012, 10:37 |
Friedhelm Ames | | | | | | | | vacuum pumps shut off | turbo pumps shut off due to work on
cooling water system |
|
30
|
Tuesday, January 24, 2012, 09:44 |
Friedhelm Ames | | | | | | | | turbo pumps restarted | All turbo pumps have been restarted after
cooling water is back and running.
|
|
37
|
Tuesday, February 28, 2012, 11:04 |
Pierre Bricault | | | | | | | | | Calibrating the gas valve |
|
40
|
Tuesday, February 28, 2012, 16:32 |
Brandon Humphries | | | | | | | | Initial settings for FEBIAD on Test Stand | ISAC Test Stand FEBIAD Ion Source and ISACT
optics screen grabs before practicing tuning.
Tune saved as: data/febiaddata/tune/120228-1620_0.snap |
|