Tuesday, May 21, 2013, 19:38 |
Friedhelm Ames | | | | | | | Problems/Solutions | magnet power supply water leak | The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued to the power supplies group. |
|
303
|
Tuesday, May 21, 2013, 15:50 |
Rick Maharaj | CTL Febiad | | | | | | | Cooling Water Turned On | Cooling water turned on when vacuum reading 5.54e-06 T. Vacuum steadily increasing. Ion gauge reading steadily decreasing now reading 4.48e-06 T. |
|
302
|
Tuesday, May 21, 2013, 15:14 |
Rick Maharaj | CTL Febiad | | | | | | | Turbos Started | Turbos started |
|
301
|
Tuesday, May 21, 2013, 14:58 |
Rick Maharaj | CTL Febiad | | | | | | | CTL Febiad Installed | Ceramic coated coil development target removed. CTL Febiad target installed.
Roughing chamber. |
|
300
|
Tuesday, May 21, 2013, 10:09 |
Rick Maharaj | | | | | | | | Test stand Vented | Turbos stopped, waterlines flushed, chamber vented |
|
299
|
Thursday, May 09, 2013, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | TSGRP1 showing signs of reduced performance | TSG:CG1A and TSG:CG1B shows an increase in vacuum.
See attached archived data for details. |
|
298
|
Wednesday, May 08, 2013, 08:52 |
Anders Mjos | | | | | | | Problems/Solutions | TMS and TPS P/S problems | Wednesday, May 08, 2013, 08:52: TMS:CB5 found off this morning. Switched back on.
Wednesday, May 08, 2013, 12:14: Lost the following devices during a mass scan
TMS:VCB5
TMS:OCT3
TPS:Q4
TPS:Q2
TPS:Q1
TSG:CBC
All devices but TPS:Q1 could be completely restored.
Wednesday, May 08, 2013, 12:49: TPS:Q1 restored by lowering and increasing the voltage
|
|
297
|
Friday, May 03, 2013, 14:32 |
Anders Mjos | | | | | | | Problems/Solutions | Cathode PS cable reconnected |
Sebastian Raeder wrote: |
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off
|
Friday, May 03, 2013
The anode cable has been reconnected to F/T J and the 100k resistor placed between L and J. Q is now grounded to L. See dwg ISK4523
Tuesday, May 07, 2013
The cathode cable has been reconnected to F/T B and the 100k resistor removed between L and J. See dwg ISK4563 Rev 3
|
|
296
|
Thursday, April 25, 2013, 13:32 |
Anders Mjos | Empty | LP-FEBIAD | | | Tube Only | 38307-9 | In progress | FEBIAD Coil test | Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54: Roughing
Thursday, April 25, 2013, 14:25: Started turbos
Thursday, April 25, 2013, 14:33: Turbos at speed
Thursday, April 25, 2013, 14:33: Vacuum at 8.8E-6 T
Friday, April 26, 2013, 08:25: Cooling water supply opened. Vacuum stable at 2.2E-7 T
Friday, April 26, 2013, 13:35: Gas lines evacuated.
Testing Coil current vs Temperature before heating
COIL:RDCUR at 1.95A
COIL:RDVOL at 1.47V
COIL T/C at 86 deg C and still slowly increasing
Tuesday, April 30, 2013
Testing Coil current vs Temperature before heating
COIL:RDCUR at 3.96A
COIL:RDVOL 3.2 V Vacuum starts to increase (base 1.4E-7
COIL:RDVOL 3.8 V T/C at 150 C vacuum at 5E-7
COIL:RDCUR at 3.47A to reduce out-gassing T/C at 175 C
Tuesday, April 30, 2013, 12:39
COIL:RDCUR at 3.96A T/C 225 C
COIL:RDVOL 5.0 V T/C at 250 C vacuum at 6.2E-7
Tuesday, April 30, 2013, 13:00
COIL:RDCUR at 4.25A COIL:RDVOL at 5.7V T/C 290 C
Tuesday, April 30, 2013, 13:10
COIL:RDCUR at 4.15A COIL:RDVOL at 5.75V T/C 310 C
Tuesday, April 30, 2013, 14:53
COIL:RDCUR at 4.15A COIL:RDVOL at 5.85V T/C 320 C
Tuesday, April 30, 2013, 16:30
COIL:RDCUR at 4.15A COIL:RDVOL at 5.89V T/C 328 C
Wednesday, May 01, 2013, 08:16
COIL:RDCUR at 4.15A COIL:RDVOL at 5.95V T/C 350 C - P/S is voltage limited at 5.95V
Ramping down current to 0. T/C logger is required elsewhere.
Friday, May 03, 2013, 12:07: Pumping out gas line through vacuum chamber.
The anode cable has been reconnected (see e-log entry 297)
Friday, May 03, 2013, 14:17: BIAS and EE to 30kV and -800V
Friday, May 03, 2013, 14:24: Started heating TBHT to 280A at 1A/min
Monday, May 06, 2013, 08:46: TBHT @ 276A, Voltage limiting at 2.5V. Increased limit to 2.7V. TGHT to 280A and 2.52V. COIL temp ~100C
Monday, May 06, 2013, 09:48: COIL:RDCUR at 2.93A
Monday, May 06, 2013, 10:34: Coil temp ~240C. Increasing COIL:RDCUR to 3.52A COIL:RDVOL at 4.1V
Monday, May 06, 2013, 11:48: Coil temp 330C COIL:RDCUR at 3.52A RDVOL at 4.9V
Monday, May 06, 2013, 11:54: COIL:RDCUR at 3.9A
Monday, May 06, 2013, 12:56: RDVOL at 5.9V. Coil temp ~380C
Monday, May 06, 2013, 13:47: Cooling down target to correct anode connection.
Tuesday, May 07, 2013, 08:47: De-biased
Tuesday, May 07, 2013, 10:06: Corrected el. connections to cathode floating. Started tube heating to 280A
Wednesday, May 08, 2013, 12:12: De-biased
Wednesday, May 08, 2013, 12:12: Cooling down cathode 1A/min
Thursday, May 09, 2013, 15:22: TPS:IV4 closed |
|
295
|
Thursday, April 18, 2013, 13:50 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Ta#40 stored under vacuum | Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs
Thursday, April 18, 2013, 13:48: Rouging
Thursday, April 18, 2013, 14:11: Starting turbos
Thursday, April 18, 2013, 14:20 : Turbos at speed
Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T
Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T
Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.
Monday, April 22, 2013, 09:32: Turbos off.
Monday, April 22, 2013, 10:57: Venting
Monday, April 22, 2013, 12:25: Vented
Monday, April 22, 2013, 14:09: Roughing
Monday, April 22, 2013, 14:31: Started Turbos
Monday, April 22, 2013, 14:40: Turbos at speed
Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T
Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday
Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.
Thursday, April 25, 2013, 13:27: Venting |
|
294
|
Tuesday, April 16, 2013, 08:59 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP2 found in timeout / fault state | Tuesday, April 16, 2013, 08:59
The turbo was found in fault state this morning. Based on data from IG6 the pump stopped around midnight.
An attempt to restart the pump will be made after the conditioning of Ta#40 is complete later today.
The TP has recently been replaced:
https://elog.triumf.ca/TIS/Test-Stand/280
Tuesday, April 16, 2013, 16:23: TMS:TP2 restarted I=1.0A P=21W T=29C @ 42kRPM
Wednesday, April 17, 2013, 16:19: TMS:TP2 I=0.8A P=14W T=29C @ 42kRPM |
|
293
|
Thursday, April 11, 2013, 08:49 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 Power Supply operational |
Anders Mjos wrote: |
Tuesday, April 09, 2013:
Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.
Wednesday, April 10, 2013:
Removed the remaining water in the P/S rack.
|
Thursday, April 10, 2013:
The power supply is again operational. See e-fault entry above for details. |
|
292
|
Wednesday, April 10, 2013, 12:14 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Conditioning Ta#40 | Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.
Wednesday, April 10, 2013, 13:05: Venting
Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.
Wednesday, April 10, 2013, 13:37: Roughing
Wednesday, April 10, 2013, 13:58: Started turbos
Wednesday, April 10, 2013, 14:07: Turbos at speed
Wednesday, April 10, 2013, 14:08: Vacuum at 9.2E-6 Torr
Thursday, April 11, 2013, 08:26: Opened cooling water. Vacuum stable at 2.2E-7 Torr
Monday, April 15, 2013, 08:40: HV conditioned to 30kV TSG:BIAS:RDCUR at 37 uA
Monday, April 15, 2013, 08:46: Started Target Heat Ramp 580A / 230A
Monday, April 15, 2013, 13:30: Target at temperature TGHT:RDCUR=574A, TBHT:RDCUR=230A
Monday, April 15, 2013, 15:10: Mass scan
Monday, April 15, 2013, 16:21: Target will be left at temperature overnight.
Tuesday, April 16, 2013, 08:40: Mass scan
Tuesday, April 16, 2013, 13:08: Started Target Cooling Sequence
Wednesday, April 17, 2013, 08:43: High voltage BIAS to zero
Wednesday, April 17, 2013, 08:47: Turbos off
Wednesday, April 17, 2013, 16:20: Target will likely be removed tomorrow Thursday.
Thursday, April 18, 2013, 11:13 : Venting
Thursday, April 18, 2013, 11:17: Water lines purged
Thursday, April 18, 2013, 11:29: Chamber vented. Target Removed |
|
291
|
Tuesday, April 09, 2013, 16:21 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak at MB1 Power Supply |
Tuesday, April 09, 2013:
Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.
Wednesday, April 10, 2013:
Removed the remaining water in the P/S rack. |
|
290
|
Tuesday, April 02, 2013, 15:19 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak at MB1 Power Supply | See Cyclotron e-fault 6637
|
|
289
|
Thursday, March 28, 2013, 13:55 |
Anders Mjos | Empty | | | | | | In progress | Pumping down empty chamber | Thursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36: Starting turbos (vacuum at ~0.100 T)
Thursday, March 28, 2013, 14:44: Both turbos at speed
Thursday, March 28, 2013, 14:46: Vacuum at 5.2E-6 Torr |
|
288
|
Monday, March 25, 2013, 16:50 |
Sebastian Raeder | | | | | | | Problems/Solutions | RFQ powersupplies removed - Anode PS still connected to ground | The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off |
|
287
|
Monday, March 25, 2013, 11:39 |
Anders Mjos | Ta#39 | LP-SIS | ITW | TM1 | | | Done | Ta#39 commissioning | Target installed with 130 in lbs torque on all bolts.
Monday, March 25, 2013, 11:36: Roughing
Monday, March 25, 2013, 11:54: Starting turbos
Monday, March 25, 2013, 12:02: Both turbos at speed
Monday, March 25, 2013, 12:04: Vacuum at 2E-5 Torr
Tuesday, March 26, 2013, 08:03: Opened water supply. Vacuum stable at 3E-7 Torr
Tuesday, March 26, 2013, 09:11
All P/S switched on.
ISAC Ops will condition this target as a training exercise.
ISAC ops e-log
ISAC ops e-log 2
Wednesday, March 27, 2013, 13:41: ISAC ops called to inform that the target has been cooled down and bias is off.
Thursday, March 28, 2013, 08:22: Closed TPS:IV4 and switched off turbos.
Thursday, March 28, 2013, 13:27: Venting
Thursday, March 28, 2013, 13:33: Water purged |
|
286
|
Thursday, March 21, 2013, 15:05 |
Sebastian Raeder | SiC#28 | | ITE | TM4 | | | Done | 2nd heating of SiC#28 LP-RFQ - short resolved |
Anders Mjos wrote:
|
Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
Target SiC#28 LP-RFQ inserted
By Sebastian (SR) & Henning
modification of 9 Pin connector needed to match wiring in TM4 (see separate e-log entry)
Tuesday, March 19, 2013, 18:32 : started roughing - SR
Tuesday, March 19, 2013, 18:52: started turbos - SR
Tuesday, March 19, 2013, 18:57: TSGIP1 on - SR
Tuesday, March 19, 2013, 19:00: turbos at speed - SR
Tuesday, March 19, 2013, 19:02: vacuum at 1.68E-5T
By Anders
Wednesday, March 20, 2013, 08:18: Opened cooling water. Vacuum stable at 6.8E-7 Torr
By Sebastian (SR) & Henning
Wednesday, March 20, 2013, 11:39: 9PIN connector in HV cage connected
4,5,6,9 on GND 1,2 to RF, 7,8,RFoffest,Source for now also on GND
RF: 800kHz, 20Vampl, 0.128mA
HV cage locked up for heating
Wednesday, March 20, 2013, 16:42: heating is taken care of by ISAC operations, now at 300A / 3V TGHT and 250A / 1.47V TBHT reading on the panel is really close
Friedhelm restarted some of the CANBUS ports, since not all optics were working properly
Thursday, March 21, 2013, 10:53 start cooling down
Vacuum not perfect was around 2E-6T, over nigth not full current
Suppression tested yesterday: full beam (SRC +3V, others GND) was 40nA, while no signal on FB0B with SRC +3V, IGOffset&Exit +25V
!!!!! but short on #7 --> 2nd Repeller, was OK when tested, after some minutes on 25V short was there, reading now (Thursday, March 21, 2013, 10:58 ) <1OHM, will be checked while heating down
Magnet had wrong polarity - so no mass scans yesterday evening, Friedhelm looked into this this morning
Mass scan only for good transmission mode (SRC +3V) this morning - see attached scan (seen Na, Al, K, Ca, Cr, Rb, Sr, Cs and Ba)
Thursday, March 21, 2013, 12:26: stopped turbos
#7 still short
By Anders
Thursday, March 21, 2013, 13:25: Venting
|
Thursday, March 21, 2013, 14:46: started roughing
Target was out, visibly inspected, nothing to be seen, no short on the target - wiring of the 9Pin connector shows short circuit inside vacuum chamber
Wires removed - short could be reproduced with the strandings of the shielding from the kapton twisted pairs going into the peek connector
wire shieldings now fixed to position further away with Cu wire
all wires against ground and each other tested for holding 250V - all fine
everything reconnected and target put in, torcked w 120 inch pounds
Thursday, March 21, 2013, 15:05 : turbos started
Thursday, March 21, 2013, 15:14: turbos at speed
Thursday, March 21, 2013, 15:17: vacuum at 1.4E-5T
Thursday, March 21, 2013, 18:01: vacuum at 1.45E-6T opening water lines - vacuum is stable
Thursday, March 21, 2013, 19:19 : vacuum at 8.6E-7T - start ramping heater to 580A / 250 A
Friday, March 22, 2013, 00:08: target is heated full way up
setpoint 570A and 7.250V voltage limit
readback 564.1A and 7.201V --> needs more voltage than the normal target !
vacuum at 1.2E-6T
Friday, March 22, 2013, 15:15: vacuum at 5.4E-7T
preparing for HV test and mass scan
transmission mode: Source +3V, everything else on GND: 12nA - mass scan see attachment
suppression mode 1: Source -15V, everything else on GND: 20pA - mass scan see attachment
suppression mode 2: Source +3V, everything else on +25V: <1pA - FC0 current while biasing see attachment
NOTE: the legs of the target are glowing differently, the left leg (view from the lid side onto the target unit) glows brighter, this side was open during the sintering process of the SiC and needed more alignment at the jig --> see attached picture
NOTE2: there is a slight increase in TGHT voltage over time: in ~ 22h from 7.201V to 7.216V
Friday, March 22, 2013, 21:33 : vacuum at 4.8E-7, start ramping down
Friday, March 22, 2013, 22:47: heaters down and turned off, vacuum at 2.7E-7T
Monday, March 25, 2013, 00:15: vacuum at 1.4E-7T, IG off, turbos off
By Anders
Monday, March 25, 2013, 08:18: Venting
Monday, March 25, 2013, 08:33: Purging water lines
Monday, March 25, 2013, 08:42: Target removed |
|
285
|
Tuesday, March 19, 2013, 19:13 |
Sebastian Raeder | | | | | | | Problems/Solutions | 9 Pin connector rewired to match wiring in TM4 | The 9 Pin connector was rewired in the ISAC teststand to match the wiring in TM4
The wiring from the connection board in the HV cage to the connector (view from the target unit onto module) is now the following
---------------------------
\ 4 8 9 7 6 /
\ 5 1 2 x /
-----------------
with the pairs of wires
1,2 (kapton wire twisted pair all way)
4,5 (kapton wire twisted pair all way)
6,7 (kapton wire twisted pair inside the vacuum chamber, other twisted pair from top of vacuum chamber to HV cage)
8,9 (kapton wire twisted pair inside the vacuum chamber, other twisted pair from top of vacuum chamber to HV cage)
___ for completeness the wiring on top of the vacuum chamber (view from top onto the feedthrough)
---------------------------
\ 1 2 x 4 5 /
\ 6 7 8 9 /
-----------------
NOTE: with this rewiring the metal screws on the PEEK 9Pin connector have been grounded using Ta foil
Thursday, March 21, 2013: there was a short in one of the lines - most probably due to a shielding strand into the connector, has been resolved by fixation of the shielding in a position further away with Cu wire
|
|