  629   Wednesday, February 07, 2018, 08:46 Aaron Schmidt       BIAS Power supply installationWednesday, February 07, 2018, 08:40: A
75 kV Glassman power supply was installed
in the rack for use in further HV testing.
 BIAS_PS_off_top_switch.jpgBIAS_PS_70kV_rear_bottom.jpgBIAS_PS_70kV_Front_bottom.jpg 
  630   Thursday, February 08, 2018, 14:44 Carla Babcock      DoneConditioning station power supply integrated into EPICSThe 75kV power supply is now in EPICS under
the usual TSG:BIAS controls. The upper limit
has been set to 70kV to protect the transformer.
  
  631   Thursday, February 08, 2018, 16:54 Carla Babcock       EZL strange behaviourThursday, February 08, 2018, 16:54
Testing the HV bias I found that
the einzel lens was behaving strangely. When
  
  632   Friday, February 09, 2018, 08:57 Carla Babcock       TSGBIASSAFETY ok interlockFriday, February 09, 2018, 08:25   
Disconnected the AC power chain from the
old bias supply but now cannot turn on the
  
  633   Tuesday, February 13, 2018, 12:17 Carla Babcock       Ramping up bias to 60kV with conditioning station supplyRamped up to 60kV with the new power supply,
same as what we did last time with the standard
test stand bias supply (see entry #627 ).
 vacuumbias_13022018.PNG 
  634   Tuesday, February 13, 2018, 16:47 Carla Babcock       Ramping to 63kV - some sparksSparks at 62kV on the bias.
Turned it down, turned it back up
and got a spark at 60kV.
  
  635   Friday, February 16, 2018, 15:21 Carla Babcock       Cleaned HV cage - trying bias againI vacuumed inside the HV cage, though it
has many small areas that are difficult to
access so I am not sure how great a job I
  
  636   Monday, February 19, 2018, 08:30 Carla Babcock       TMSTP6 offFound TMSTP6 off, restarted it, seems fine
now (drawing 0.8A)
  
  637   Monday, February 19, 2018, 14:01 Carla Babcock       Attempts to get to higher voltages, summarized.The test stand holds up to 63kV, however
at voltages over 54kV there are small discharges,
rising to a continuous level around 60kV.
  
  638   Tuesday, February 20, 2018, 09:04 Carla Babcock       Trying HV with rubber corona shieldTuesday, February 20, 2018, 09:01: Sparks
at 62.5kV after a couple minutes. Sounds
like they were in the EE spark gap but don't
  
  639   Friday, February 23, 2018, 08:50 Aaron Schmidt       New Al Corona Friday, February 23, 2018, 08:50    
  640   Monday, February 26, 2018, 09:13 Carla Babcock       Running list of changes to the ISAC test stand for >60kV operation1. Al corona shield installed over end
of the HV duct to suppress discharges from
the sharp edge of the duct.
 6x 
  641   Wednesday, February 28, 2018, 11:50 Aaron Schmidt       HV Test NpNew parts installed. Corona Shield, brackets,
and board/spark gap orientation.
Wednesday, February 28, 2018, 11:48:
 2018_HV_test_Np.docx 
  642   Thursday, March 01, 2018, 10:05 Carla Babcock       HV tests with corona discharge problems solvedTurning up bias, no corona discharge at
60kV but a spark at 61.5kV bias, 31kV EZL,
-800V EE
 01032018_10am_61kVspark.PNG 
  643   Tuesday, March 06, 2018, 10:55 Carla Babcock       Trying HV without electronicsI have removed the resistor/varistor combinations
that go between the poles of the target and
tube heaters, and between those two supplies.
 spark_06032018.PNGnospark_06032018_1410.PNG 
  644   Thursday, March 08, 2018, 17:47 Carla Babcock       Change of electronics on target and tube power suppliesThe resistor/varistor combinations across
the target + / -, tube + / - and target-
/ tube + have been remade and moved to the
 IMG_20180308_152637.jpgIMG_20180308_152645.jpgTargetNeg.jpgTubeNegPos.jpg 
  645   Friday, March 09, 2018, 08:57 Carla Babcock       HV test with electronics moved to rackFirst attachment: BIAS/EE/EZL = 63.25/-1.5/31
So far no issues.
Second attachment: BIAS/EE/EZL =
 09032018_830.PNG09032018_835.PNG09032018_850.PNG09032018_855.PNG 
  646   Monday, March 12, 2018, 10:07 Aaron Schmidt       HV Test w-gasMonday, March 12, 2018, 09:45: Gas lines
opened. Leak rate set. Vacuum @ 1.16e-06T
Monday, March 12, 2018, 10:00: RGA
  
  647   Monday, March 12, 2018, 10:44 Carla Babcock       Bringing up HV with gas onPressure:
Previous HV tests done at 2e-7
pressure.
Current pressure 1.1e-6
 8x 
  650   Tuesday, March 20, 2018, 09:14 Aaron Schmidt      Problems/SolutionsOptics issueTuesday, March 20, 2018, 09:11: TMS:Q5
& TMS:Q2 controllers require repair.
Unable to hold a negative voltage.
  
ELOG V2.9.2-2455