  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  462   Friday, September 11, 2015, 11:43 Anders MjosTa#46HP-SISITETM4  DoneTa#46 conditioningEE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0:
Roughing
 Ta#46.docx 
  463   Monday, September 14, 2015, 08:38 Anders Mjos      Problems/SolutionsRP2 increased pressure e-fault submitted and vacuum group
(Edi) notified.
Monday, September 14, 2015, 09:33:
  
  464   Thursday, September 17, 2015, 14:05 Anders MjosTest TargetLP-SIS    In progressNew centre block test 

    
        
  
  465   Friday, September 18, 2015, 11:35 Anders Mjos      Problems/SolutionsTMS:TP6 nor workingfound in fault state this morning. Edi
consulted and fault report submitted.
  
  466   Wednesday, September 30, 2015, 16:28 Anders MjosTest Target wrapped with heat shieldsLP-SIS    In progressNew centre block test 

    
        
  
  467   Friday, October 02, 2015, 08:35 Anders Mjos      Problems/SolutionsVenting beam line for TP exchange Friday, October 02, 2015, 08:35:
Turbo stopped
  
  468   Wednesday, October 07, 2015, 11:16 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09
Turbos started
 SiC#32.docx 
  469   Tuesday, October 13, 2015, 07:47 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Target was pumped down on Friday.

Tuesday, October 13, 2015,
07:47: Opened water for HS. No response on
 SiC#32-2.docx 
  470   Tuesday, October 13, 2015, 16:04 Anders Mjos      Problems/SolutionsIV4 timed outContacted Graham W. (controls) to have
a look. It turned out to be a limit switch
problem. Removed and reinstalled limit switch
  
  471   Tuesday, October 13, 2015, 17:23 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07:
Started turbos.
 SiC#32-3.docxEmittance.zipNeEfficiecy.xlsx 
  472   Wednesday, October 14, 2015, 16:13 Anders Mjos      Problems/SolutionsTMS:RP2 replaced by vacuum group. The pump was making
more noise than usual.
  
  473   Thursday, October 15, 2015, 11:19 Anders Mjos      Problems/SolutionsRight side TGHT connector block removedThe keensert has been worn out and will
be replaced.
The keensert was re-tapped and the
 Photo_2015-10-16_11_57_45_AM.jpgPhoto_2015-10-16_11_57_51_AM.jpg 
  475   Monday, October 19, 2015, 09:45 Anders Mjos      Problems/SolutionsIG1 filament deadWill went chamber to replace the filament.
See e-fault 8501 
Monday, October 19, 2015, 09:43:
  
  476   Monday, October 19, 2015, 15:39 Anders Mjos      Problems/SolutionsExhaust came off the new RP2

    

       
            
  
  477   Monday, November 02, 2015, 12:47 Anders Mjos      Problems/SolutionsRemoved Swagelok T from rioght TGHT water linesMico replaced the T's with copper tube
and leak checked.
Monday, November 02, 2015, 12:46:
  
  479   Monday, November 16, 2015, 14:52 Anders Mjos      In progressCurrent measurementInstalled Cu-shunts on TGHT and TBHT terminals.
HS water looped.
 Monday, November 16, 2015,
 2015-11-17_High_Current_Test.png2015-11-17_Current_vs_Voltage_TGHT_and_TBHT.xlsx 
  480   Tuesday, November 17, 2015, 11:27 Anders Mjos      Problems/SolutionsRan RP2 with gas ballast for 15 minTo recover performance  2015-11-17_RP2_performance.png 
  481   Wednesday, December 02, 2015, 14:50 Anders Mjos      Problems/SolutionsNitrogen supply for venting temporarely from bottleNo supply of N through the piping due to
work on the N tanks. Confirmed with Geoff
Hodgson. ISIS supply is shut off. Using a
  
  482   Wednesday, December 02, 2015, 15:30 Anders Mjos LP-SIS     New centre block testNew 2x 9-pin connector grounding tool with
gripper installed.
Wednesday, December 02, 2015, 15:30:
  
  483   Friday, December 18, 2015, 11:44 Anders Mjos      Problems/SolutionsIG6 not reading correctlyThe new controller (XGS-600) installed
for IG6 use a different voltage to pressure
conversion than the previous models. This
  