ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
670
|
Thursday, June 21, 2018, 16:32 |
Anders Mjos | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Heating target | Thursday, June 21, 2018, 16:30: Short between
ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping |
|
|
351
|
Wednesday, December 18, 2013, 12:04 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Wednesday, December 18, 2013, 12:04:
Turbos stopped
Wednesday, December 18, 2013, 13:19: |
|
|
354
|
Tuesday, January 14, 2014, 08:58 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Tuesday, January 14, 2014, 08:57: Stopping
turbos. Vacuum at 1.2E-7 T
Tuesday, January 14, 2014, 13:32: |
|
|
1031
|
Thursday, November 28, 2024, 11:47 |
Isaiah Rabuka | | | | | | | In progress | Heating Stage Pellet Testing and Development | Opened the ATTS, placed what I will call
“Cast Alumina Sample #1” into
the ATTS and activated the roughing then |
|
|
16
|
Thursday, September 29, 2011, 09:27 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | In progress | Heaters conditioning | Started the heaters conditioning: TGHT
up to 580A and TBHT up to 230A. |
|
|
158
|
Friday, August 10, 2012, 13:48 |
Anders Mjos | | | | | | | Problems/Solutions | He line leak checked - leak fixed | A major leak was found on the connection
to the regulation valve on the He bottle.
Ferrule replaced. System leak checked. |
|
|
33
|
Thursday, February 16, 2012, 15:59 |
Anders Mjos | | | | | | | Problems/Solutions | He and Ne installed and gas lines leak checked | New supply of He and Ne was installed yesterday
and gas lines leak checked. The He bottle
is currently closed. |
|
|
95
|
Wednesday, May 16, 2012, 19:55 |
Friedhelm Ames | | | | | | | Problems/Solutions | Hall probe reading wrong | During the mass scan today it was discovered,
that the mass calibration was off. Further
investigation showed, that the Hall probe |
|
|
329
|
Wednesday, August 28, 2013, 11:28 |
Anders Mjos | | | | | | | Problems/Solutions | Hall probe controller for MB1 removed | Jens Lassen provided a new controller for
the Hall prove. With the help from Graham
from controls it was reconfigured and is |
|
|
335
|
Wednesday, September 18, 2013, 14:54 |
Anders Mjos | | | | | | | Problems/Solutions | Hall probe calibration | New calibration of the m/q based on
the hall probe after exchanging the controller(MASSOVERQ2).
Based on NiO#2-HP-FEBIAD with Ne supplied |
|
|
642
|
Thursday, March 01, 2018, 10:05 |
Carla Babcock | | | | | | | | HV tests with corona discharge problems solved | Turning up bias, no corona discharge at
60kV but a spark at 61.5kV bias, 31kV EZL,
-800V EE |
|
|
645
|
Friday, March 09, 2018, 08:57 |
Carla Babcock | | | | | | | | HV test with electronics moved to rack | First attachment: BIAS/EE/EZL = 63.25/-1.5/31
So far no issues.
Second attachment: BIAS/EE/EZL = |
|
|
627
|
Wednesday, January 31, 2018, 12:58 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | In progress | HV test 4 | Wednesday, January 31, 2018, 12:53: Power/sources
on.
Wednesday, January 31, 2018, 12:58: |
|
|
625
|
Tuesday, January 30, 2018, 06:51 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 3 | Tuesday, January 30, 2018, 06:50: BIAS
/ EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: |
|
|
623
|
Friday, January 26, 2018, 13:59 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 1 | Friday, January 26, 2018, 14:00: BIAS/EZL/EE
ramp up.
Friday, January 26, 2018, 14:06: |
|
|
984
|
Monday, October 30, 2023, 16:01 |
Aaron Schmidt | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, October 30, 2023, 16:00
Roughing
Tuesday, October 31, 2023, |
|
|
986
|
Monday, November 27, 2023, 16:09 |
Ferran Boix Pamies | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, November 27, 2023, 16:09
Roughing
Monday, November 27, 2023, 17:22 |
|
|
411
|
Friday, December 12, 2014, 13:11 |
Anders Mjos | | | | | | | Problems/Solutions | HV inspection and cleaning | by Ray D and Anders in preparation for
60kV test. Rack insulators and f/t insulators
cleaned with windex |
|
|
412
|
Friday, December 12, 2014, 13:11 |
Anders Mjos | | | | | | | Problems/Solutions | HV inspection and cleaning | by Ray D and Anders in preparation for
60kV test. Rack insulators and f/t insulators
cleaned with windex |
|
|
58
|
Wednesday, March 07, 2012, 10:36 |
Paul Mocock | | | | | | | | HV conditioning begins. | HV conditioning has begins. Vacuum chamber
pressure is currently 3.2e-07 Torr on TSG:IG1. |
|