|
ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
|
670
|
Thursday, June 21, 2018, 16:32 |
Anders Mjos | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Heating target | Thursday, June 21, 2018, 16:30: Short between ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping TBHT/TGHT to 290 / 580 Aat 2 A/min
Friday, June 22, 2018, 07:49: Target at temperature. Vacuum at 1.0E-7 T
Monday, June 25, 2018, 09:10: Auto-cooling at 2A/min - AS.
Friday, June 29, 2018, 08:52: Turbos/PS/Sources/RGA/Ion gauge off.
Friday, June 29, 2018, 10:03: Venting.
Friday, June 29, 2018, 14:32: Roughing. Anode to EE short fixed. |
Attachment 1: TS-2018-06-19-10-30.rga
|
Attachment 2: TS_Source_tray_2018_-_Check_2.docx
|
|
351
|
Wednesday, December 18, 2013, 12:04 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Wednesday, December 18, 2013, 12:04: Turbos stopped
Wednesday, December 18, 2013, 13:19: Venting
Ta-tube installed. All bolts torqued to 130 in lbs
Thermocouples installed.
CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe left side - type C
CH3 6/7: inside probe right side - type C
CH4 8/9: welded on leg - type K
Wednesday, December 18, 2013, 14:41: Roughing
Initial temperatures
CH1 28.1
CH2 30.7
CH3 31.3
CH4 31.0
Wednesday, December 18, 2013, 15:50: Starting turbos.
Wednesday, December 18, 2013, 15:58: Turbos at speed.
Wednesday, December 18, 2013, 16:00: Vacuum at 9.3E-6 Torr
Thursday, December 19, 2013, 09:35 : Opened water for HS. Vacuum stable at 2.5E-7 Torr. Flow ~ 3.9 l/min
temperatures
CH1 26.3
CH2 Un
CH3 28.7
CH4 30.5
Thursday, December 19, 2013, 16:50: Ta-tube at 500A ~ 1380 deg C.
temperatures
CH1 33.6
CH2 1319.3
CH3 1443.4
CH4 20.1
Heated to 580A
Friday, December 20, 2013, 10:48: Started cool down at 2A/min.
Friday, December 20, 2013, 15:46: Switched off TGHT. |
|
354
|
Tuesday, January 14, 2014, 08:58 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Tuesday, January 14, 2014, 08:57: Stopping turbos. Vacuum at 1.2E-7 T
Tuesday, January 14, 2014, 13:32: Venting
Ta-tube installed. All bolts torqued to 130 in lbs
Thermocouples installed. CH2/3 left/right swapped with respect to previous test.
CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe right side - type C
CH3 6/7: inside probe left side - type C
CH4 8/9: welded on leg - type K
Tuesday, January 14, 2014, 15:10: Roughing
Tuesday, January 14, 2014, 15:33: Starting turbos.
Tuesday, January 14, 2014, 15:42: Turbos at speed
Tuesday, January 14, 2014, 15:43: Vacuum at 2.3E-5 T
Wednesday, January 15, 2014, 10:32: Opened water. Vacuum stable at 2.9E-7 T.
Monday, January 20, 2014
Started heating the Target-tube.
Pressure increase observed on water supply around 10. Supply ~100psi, return ~7 psi
Tuesday, January 21, 2014
Continue heating from 250 A
Tuesday, January 21, 2014, 15:47: TGHT at 580 A, 7.23 V
Wednesday, January 22, 2014
Target-tube cooled down over night. Will went to investigate TC connections.
Wednesday, January 22, 2014, 08:38 : Turbos stopped. Vacuum at 1.3E-7 T |
|
1031
|
Thursday, November 28, 2024, 11:47 |
Isaiah Rabuka | | | | | | | In progress | Heating Stage Pellet Testing and Development | Opened the ATTS, placed what I will call “Cast Alumina Sample #1” into the ATTS and activated the roughing then turbo pumps. Currently sample is in slow heating progress to 1000 degrees Celsius, process is expected to take some time, so I'll revisit after lunch.
|
|
16
|
Thursday, September 29, 2011, 09:27 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | In progress | Heaters conditioning | Started the heaters conditioning: TGHT up to 580A and TBHT up to 230A. |
|
158
|
Friday, August 10, 2012, 13:48 |
Anders Mjos | | | | | | | Problems/Solutions | He line leak checked - leak fixed | A major leak was found on the connection to the regulation valve on the He bottle. Ferrule replaced. System leak checked.
After He bottle: base 5E-6, no response to He spray
AfterSV1: base 5E-7, no response
After SV2: base 4E-7, no response
The system should now be operational. Gas lines were evacuated with the leak checker. |
|
33
|
Thursday, February 16, 2012, 15:59 |
Anders Mjos | | | | | | | Problems/Solutions | He and Ne installed and gas lines leak checked | New supply of He and Ne was installed yesterday and gas lines leak checked. The He bottle is currently closed.
UPDATE Monday, June 17, 2013, 15:17
Specifications for the currently installed Ne leak (SN: 11-231) can be found on DocuShare
https://documents.triumf.ca/docushare/dsweb/Get/Document-46969 |
|
95
|
Wednesday, May 16, 2012, 19:55 |
Friedhelm Ames | | | | | | | Problems/Solutions | Hall probe reading wrong | During the mass scan today it was discovered, that the mass calibration was off. Further investigation showed, that the Hall probe readings are a factor of 1.31 lower than during previous measurements. A fault report has been issued to controls. |
|
329
|
Wednesday, August 28, 2013, 11:28 |
Anders Mjos | | | | | | | Problems/Solutions | Hall probe controller for MB1 removed | Jens Lassen provided a new controller for the Hall prove. With the help from Graham from controls it was reconfigured and is operational again. The magnet must likely be calibrated again. |
|
335
|
Wednesday, September 18, 2013, 14:54 |
Anders Mjos | | | | | | | Problems/Solutions | Hall probe calibration | New calibration of the m/q based on the hall probe after exchanging the controller(MASSOVERQ2). Based on NiO#2-HP-FEBIAD with Ne supplied and ANODE biased to 200V, 30kV Bias.
CONST11 = -16.3929
CONST22 = 0.12481
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2013-09-18-09%20NiO%232
Data and results from Gnuplot
"2013-09-18 NiOcalibration.txt"
6.02 -1192 6Li
7.02 -1288 7Li
19.99 -2177 20Ne
21.99 -2284 22Ne
38.96 -3043 40K
40.96 -3118 41K
180.9 -6577 Ta
196.9 -6864 TaO
f(x)=((x+a)**2)*b/30000;
a=35.221;
b=0.129991;
fit f(x) "2013-09-18 NiOcalibration.txt" using 2:1 via a,b;
Final set of parameters Asymptotic Standard Error
======================= ==========================
a = -16.3929 +/- 2.015 (12.29%)
b = 0.12481 +/- 8.448e-005 (0.06769%)
correlation matrix of the fit parameters:
a b
a 1.000
b 0.952 1.000 |
Attachment 1: 2013-09-18_NiOcalibration.png
|
|
|
642
|
Thursday, March 01, 2018, 10:05 |
Carla Babcock | | | | | | | | HV tests with corona discharge problems solved | Turning up bias, no corona discharge at 60kV but a spark at 61.5kV bias, 31kV EZL, -800V EE
Thursday, March 01, 2018, 10:26: BIAS / EZL / EE @ 65 / 32.5 / 3.2 kV
Thursday, March 01, 2018, 10:32: Spark* Knocked out turbo pump TMS : TP6 (Restarted) Communications restarted. RPM0A restarted.
Thursday, March 01, 2018, 10:44: BIAS / EZL / EE @ 61 / 30.5 / 3.1 kV |
Attachment 1: 01032018_10am_61kVspark.PNG
|
|
|
645
|
Friday, March 09, 2018, 08:57 |
Carla Babcock | | | | | | | | HV test with electronics moved to rack | First attachment: BIAS/EE/EZL = 63.25/-1.5/31 So far no issues.
Second attachment: BIAS/EE/EZL = 64.25/-1.5/32 Slight spark - bias current jumped from 40uA to 88uA and vacuum jumped from 2e-7 to 2e-6... Steerers went off.
Third attachment: BIAS/EE/EZL = 65/-1.5/32 Some small signs of instability in the bias power supply
Fourth attachment : BIAS/EE/EZL = 65/-1.5/32 Been running for 20 mins now. More variation on the bias current output than at lower voltages but not too bad |
Attachment 1: 09032018_830.PNG
|
|
Attachment 2: 09032018_835.PNG
|
|
Attachment 3: 09032018_850.PNG
|
|
Attachment 4: 09032018_855.PNG
|
|
|
627
|
Wednesday, January 31, 2018, 12:58 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | In progress | HV test 4 | Wednesday, January 31, 2018, 12:53: Power/sources on.
Wednesday, January 31, 2018, 12:58: BIAS / EZL / EE @ 40 / 17 / 2
Wednesday, January 31, 2018, 13:02: BIAS / EZL / EE @ 40 / 17 / 2
Wednesday, January 31, 2018, 13:05: BIAS / EZL / EE @ 50 / 22 / 2.5
Wednesday, January 31, 2018, 13:08: BIAS / EZL / EE @ 55 / 24 / 2.8
Wednesday, January 31, 2018, 13:10: BIAS / EZL / EE @ 57.5 / 27 / 3.0
Wednesday, January 31, 2018, 13:14: BIAS / EZL / EE @ 60 / 28 / 3.1
Wednesday, January 31, 2018, 13:34: No Sparks.
Wednesday, January 31, 2018, 14:14: No sparks after one hour.
Wednesday, January 31, 2018, 14:44: Spark free at 1-1/2 hours.
Wednesday, January 31, 2018, 14:45: Bringing down voltage.
Wednesday, January 31, 2018, 14:56: BIAS / EZL / EE @ 0
Wednesday, January 31, 2018, 14:57: Sources off. |
Attachment 1: 2018_HV_test_4.docx
|
|
625
|
Tuesday, January 30, 2018, 06:51 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 3 | Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 30, 2018, 06:58: Optics on / set
Tuesday, January 30, 2018, 06:59: IV4 opened.
RGA switched completely off and unplugged.
Tuesday, January 30, 2018, 13:15: BIAS / EZL / EE @ 40 / 17 / 2
Tuesday, January 30, 2018, 13:20: BIAS / EZL / EE @ 50 / 21.8 / 2.5
Tuesday, January 30, 2018, 13:50: Half hour wait. Ok. No sparks.
Tuesday, January 30, 2018, 13:55: BIAS / EZL / EE @ 55 / 24 / 2.8
15 minute wait. No sparks.
Tuesday, January 30, 2018, 14:10: BIAS / EZL / EE @ 57.5 / 27 / 3.1
Tuesday, January 30, 2018, 14:23: BIAS / EZL / EE @ 60 / 28 / 3.1
Tuesday, January 30, 2018, 14:35: No sparks.
Tuesday, January 30, 2018, 15:05: BIAS / EZL / EE @ 0
Tuesday, January 30, 2018, 15:06: Auto-cooling started.
Wednesday, January 31, 2018, 06:59: Power/sources off.
|
Attachment 1: 2018_HV_test_3.docx
|
|
623
|
Friday, January 26, 2018, 13:59 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 1 | Friday, January 26, 2018, 14:00: BIAS/EZL/EE ramp up.
Friday, January 26, 2018, 14:06: BIAS/EZL/EE @ 30/13/1.5 kV.
Friday, January 26, 2018, 14:09: BIAS/EZL/EE @ 35/13/1.5 kV.
Spark at BIAS 30 kV and 40kV
Friday, January 26, 2018, 14:12: BIAS/EZL/EE @ 40/13/1.5 kV.
Friday, January 26, 2018, 14:15: BIAS/EZL/EE @ 45/13/1.5 kV.
Audible sparks, but none showing on the strip tool.
Friday, January 26, 2018, 14:19: BIAS/EZL/EE @ 45/19/1.5 kV.
Friday, January 26, 2018, 14:22: BIAS/EZL/EE @ 47/22/1.5 kV. Sparks @ 47000 to 47250 V.
Sparks observed on EE feed through in cage.
Friday, January 26, 2018, 14:27: BIAS/EZL/EE @ 50/22/1.7 kV.
Friday, January 26, 2018, 14:39: BIAS/EZL/EE @ 55/23.5/1.8 kV.
Bias controls 55 kV Actual @ 50 kV.
Friday, January 26, 2018, 14:44: Spark free 5 min.
Friday, January 26, 2018, 14:49: Spark free 10 min. |
Attachment 1: 2018_HV_test_1.docx
|
|
984
|
Monday, October 30, 2023, 16:01 |
Aaron Schmidt | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, October 30, 2023, 16:00 Roughing
Tuesday, October 31, 2023, 08:58 Turbos on the afternoon before, TP1A timed out which delayed for another 30min turning on both TP. Now 3e-6 Torr in IG1. - FBP
Tuesday, October 31, 2023, 09:38: FS#5 open. Vacuum Stable @ 2.96e-06T
Tuesday, October 31, 2023, 09:40: PS / sources on.
Tuesday, October 31, 2023, 10:32 Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, October 31, 2023, 12:07 HV cage closed. TSG:BIAS and TSH:EE PS are on. Waiting for TGHT ramp up to finish.
Tuesday, October 31, 2023, 14:21: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, October 31, 2023, 14:39 IG1 5e-6Torr , TGHT ramp up on hold.
Tuesday, October 31, 2023, 14:40 Starting HV tests.
Tuesday, October 31, 2023, 15:10 HV tests went up to 53kV until gauge on Faraday cage started sparking. TP6 seems to have tripped after a few sparks from that gauge. The TC wire seems to be placed to conservatively.
Wednesday, November 01, 2023, 08:06: TP6 Was tripped. IV4 closed. TP6 Restarted. - AS
Wednesday, November 01, 2023, 08:10: Tp6 on. IV4 open.
Wednesday, November 01, 2023, 09:32: HV to 0 kV.
Wednesday, November 01, 2023, 09:33: Auto-cooling @ 2 A per min.
Monday, November 06, 2023, 09:07: IV4 closed. PS off. IG1 & turbos off. |
|
986
|
Monday, November 27, 2023, 16:09 |
Ferran Boix Pamies | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, November 27, 2023, 16:09 Roughing
Monday, November 27, 2023, 17:22 Both turbos are on, leaving vacuum over night.
Tuesday, November 28, 2023, 09:28 after pumping over night IG1 is at .15e-6 T. Water cooling on.
Tuesday, November 28, 2023, 14:34 HV test started. Sparks on the TC seen at BIAS/EE/EZL 31/-1.8/15kV. TC values recovered after sparks, TP6 tripped during sparks as well. Venting chamber to reposition TC.
Tuesday, November 28, 2023, 17:37 I couldn't manage to close properly the side door of the chamber... waiting for help tomorrow.
Wednesday, November 29, 2023, 10:51 Roughing started earlier in the morning. IG1 at 1e-5 T. Ramping up bias.
Wednesday, November 29, 2023, 11:41 HV tests lead to 45kV sparks on the TC. Nothing seen on the RPi.
Wednesday, November 29, 2023, 13:22 The ballast of TMSRP2 was opened to attempt to improve the roughing in the beam line section. Things appear to be somehow better now, TMSTP6 and TMSTP2 are on now.
Wednesday, November 29, 2023, 16:00 IG1 is at 3.58e-6. HV tests starting again.
Wednesday, November 29, 2023, 23:36 HV tests ended earlier in the afternoon. No spark up to 55kV when gauge in the HV cage started sparking as usual.
Wednesday, November 29, 2023, 23:38 TGHT and TBHT ramp up in preparation of mass scans in the morning. 1A/30s up to TGHT:400A, TBHT:160A
Thursday, November 30, 2023, 09:05 TGHT and TBHT ramp up in preparation of mass scans in the morning. 1A/30s up to TGHT:580A, TBHT:230A
Thursday, November 30, 2023, 12:12 Mass scans started earlier in the morning. 1st scan completed at 0.1A/s, repeating it again now with 0.05A/s.
Thursday, November 30, 2023, 15:04 HV tests again up to 55kV. 2 sparks inside the vacuum, to be checked if they affected TC measurement with the pi. Gauge still sparks in the upper HV cage.
Friday, December 01, 2023, 12:05. Error saving mass scan data Thursday. Repeating mass scans at 0.02,0.01,0.005 scan speeds. note* must delete old data prior to saving. -> save procedure: Delete Old Data, Right click plot, save as plot.txt, click Clean, Show/Save Data, enter file name and save. Filenames: 2023-12-01-*
Friday, December 01, 2023, 15:22. Spent some time selectively tuning various elements of the beam. Report in local folder, file "2023-12-01 beam tuning".
Friday, December 01, 2023, 15:23. Recording mass scan with inactive quadrupole elements. File name 2023-12-01_Q-off.txt
Sunday, December 03, 2023, 22:02 : Vacuum looks good. 4e-7 T. Heating up target for Monday morning. 1A/30s up to TGHT:580A, TBHT:230A
Monday, December 04, 2023, 12:21: This morning, increased BIAS to 30kV. Ran mass scan with adjusted beam tune up to FC0. This mass scan was repeated with inactive quadrupole elements up to FC0 to compare with Friday. 2023-12-02_RBsalt_SIS_test1.txt and 2023-12-02_RBsalt_SIS_test2.txt
Tuesday, December 05, 2023, 14:12 HV tests restarted, TC wire brought closer to the ground wall. IG1 at 2.3e-6 T. Ramping up HV.
Wednesday, December 06, 2023, 13:48 Both yesterday and today the TC wire was not close enough to spark even at 60kV. Venting the chamber one more time to bring the TC closer.
Thursday, December 07, 2023, 10:18 Vacuum at 5e-7T we see sparks at about 47kV. Lost control of epics during sparks, PS shut off manually. Everything recovered after.
Thursday, December 07, 2023, 13:32 After spark tests at ~55kV, Pi seems not to be affected by the sparks. Tests without the power surge components yielded similar results. We discovered that the sparks on the TC are partially diverted by spark gaps and probably other elements in the top HV cage.
Monday, December 11, 2023, 10:35 Turbopumps winding down. |
|
411
|
Friday, December 12, 2014, 13:11 |
Anders Mjos | | | | | | | Problems/Solutions | HV inspection and cleaning | by Ray D and Anders in preparation for 60kV test. Rack insulators and f/t insulators cleaned with windex |
|
412
|
Friday, December 12, 2014, 13:11 |
Anders Mjos | | | | | | | Problems/Solutions | HV inspection and cleaning | by Ray D and Anders in preparation for 60kV test. Rack insulators and f/t insulators cleaned with windex |
|
58
|
Wednesday, March 07, 2012, 10:36 |
Paul Mocock | | | | | | | | HV conditioning begins. | HV conditioning has begins. Vacuum chamber pressure is currently 3.2e-07 Torr on TSG:IG1. |
|